On arriving at Sowerby Bridge today I found that the train just arrived, which I boarded, was the late running 0732 to Leeds, which actually left Sowerby at 0813. The conductor announced that, because of its lateness, the service would now be running non-stop to Leeds. I thought that it would be amazing if the train didn't get held on the way, given the amount of traffic that time of morning. However, going via Dewsbury rather than the scheduled Halifax route, it arrived in Leeds at 0838, a journey of 25 minutes compared to the scheduled 44 minutes.
This did leave me wondering, was it purely a case of the train happening to be in the right place at the right time to facilitate such a quick journey, or does it indicate that they are paths available for non-stop Calder Valley-Leeds services in the peak, a service that there would likely to be a good level of demand for?
This did leave me wondering, was it purely a case of the train happening to be in the right place at the right time to facilitate such a quick journey, or does it indicate that they are paths available for non-stop Calder Valley-Leeds services in the peak, a service that there would likely to be a good level of demand for?