Xenophon PCDGS
Veteran Member
Lets say the new franchise/franchises start in 2014. The winning company then go through the procurement process. The trains are then built. The trains are then tested. The trains are gradually introduced into service. Realistically, can all of that be done within five years (for, say, 100 DMUs)? Because if Pacers have to be gone by the end of the decade then thats the "window" that we have.
My point was to highlight the matter in hand from 2008 onwards. To use the now-realistic date of 2014 , for the reasons that I made in my original posting, shows that six years prior to 2014 have been totally wasted when the tendering process could have started and matters proceeded from that point onwards. I am enough of a realist to realise why the present situation has occurred and the fait accompli has then ensued.