I brought Blackburn into the equation solely to reflect matters on the "Bruntwood Chairman" thread that is running concurrently with this thread on the same forum where he says links between Blackburn and Manchester on the current route are not good.
150222 on an earlier posting on this thread had commented at the end of his posting where electrification was concerned, that Hebden Bridge and Colne could benefit from an electrified line to Preston and it was basing my ideas upon that particular submission, where Blackburn would obviously be served on the Preston line electrification so discussed, that I brought up the matter of the Todmorden Chord as being an electrified line section leading to an electrified Blackburn to Manchester Victoria service.
This is the reasoning behind my submission for an electrified Blackburn to Manchester service via Accrington, Todmorden and Rochdale. It is to supplement the existing Blackburn - Bolton - Manchester service, which has too many infrastructural problerms to be the subject of line service improvements. Perhaps the Bruntwood Chairman might consider these alternatives....and arrange part-funding for them, if he is so concerned.
Perhaps I should train my mind not to run ideas on two seperate threads concurrently, even if I can see an obvious linkage between them.
Sorry, I was not directly rubbishing your idea by intent. Rather I was pointing out that sadly, in the current scheme of things, Blackburn is unlikely to benefit. It was not an intended slight on your suggestion, rather a reality of the current situation.
--- old post above --- --- new post below ---
Its policy by Government/NR that new third rail networks cant be setup and must be Overhead for compatibility with other services. Any new third rail line no matter the contact type would be refused permission. They want to avoid unnecesary incompatibilities.
Do not make that assumption without checking directly with the authorities. They have clearly stated in their FAQ that this is not a hindrance to them and DLR has successfully extended itself in the past few years. There are other concerns such as retrofitting this to Victorian infrastructure.
The question has been asked.
Last edited: