You have picked up on most of the probable issues with all of those identified DMUs directly aiding Pacer replacement, but here's my generally pessimistic view that is unfortunately often borne out by actual DfT decisions:
It is reported that London Midland are currently looking at retaining some of their 150s, so it's questionably whether all of these units would end up at Northern.
Thirty six 2 and 3 car units is quite a lot if they are all cascaded to the Bristol and West Country area. That should definitely see the replacement of FGWs' eight 143s (I predict that they'll move to ATW to join the rest of the fleet there) and could well lead to the cascade of Sprinter units to other operators. FGW has its' own overcrowding issues as well, so I'd hope that less carriages than have been driectly replaced are moved elsewhere.
Until the full beneficial effects of the LM 150 cascade have been experienced, it's difficult to say how many trains the cascaded 165s could release: I'd say, though I'm not suggesting that this is the most desirable arrangement, that FGW could comfortably lose its' eight 143s, five 2 car 158s and ten 3 car 158s in exchange for twenty 2 car 165s and sixteen 3 car 165s around the West Country.
Fingers crossed though that completion of the currently authorised stages of the Scottish electrification programme sees a number of Sprinters trickling down into English hands.
I am in agreement with you that there is no need to order a single new DMU to replace the Pacer fleet, and not just the 142s, but only with the authorisation of further electrification works above those already authorised.
By the end of the next five years I would like to see a lot more four carriage Sprinter (and Pacer, in the areas where they operate: So looking at Valley Lines and Northern) formations operating for a much greater portion of the day where demand requires it. Which, if demand for rail travel is to continue to increase, will be in a lot of places.
There is no need to order a single DMU to replace the class 142.
One Northern Train Driver has had the brains to ask the right FoI questions and found over 100 DMUs 'going spare'.
Heres a snippit of an email of his thats doing the rounds:
26 class 150 vehicles currently going of lease from London Midland. See http://www.dft.gov.uk/foi/dft-f0007261
It is reported that London Midland are currently looking at retaining some of their 150s, so it's questionably whether all of these units would end up at Northern.
As you rightly say, Transpennine will most likely not be giving up the 185s freed up by electrification, as they are required for strengthening other TPE services. However the 32 units out of Northern Rails' fleet that will be freed up is definitely good news and is almost exactly the same size as Newton Heaths' 142 fleet. The problem is that additional capacity will still be needed on Northerns' remaining diesel routes above that provided by the arrival of LMs' 150s (Perhaps unless they received all the unallocated LM 150s).Electrification will save 40 DMU vehicles from TransPennine and 76 from Northern Rail. See: http://www.dft.gov.uk/foi/dft-f0007441
That suggests that the 36 class 165/1s will be available for cascade elsewhere. It's good to see some details as such, thanks for the link.Electrification of the Great Western Mainline will save around 40 diesel units. See: http://www.dft.gov.uk/foi/dft-f0007353
Thirty six 2 and 3 car units is quite a lot if they are all cascaded to the Bristol and West Country area. That should definitely see the replacement of FGWs' eight 143s (I predict that they'll move to ATW to join the rest of the fleet there) and could well lead to the cascade of Sprinter units to other operators. FGW has its' own overcrowding issues as well, so I'd hope that less carriages than have been driectly replaced are moved elsewhere.
Until the full beneficial effects of the LM 150 cascade have been experienced, it's difficult to say how many trains the cascaded 165s could release: I'd say, though I'm not suggesting that this is the most desirable arrangement, that FGW could comfortably lose its' eight 143s, five 2 car 158s and ten 3 car 158s in exchange for twenty 2 car 165s and sixteen 3 car 165s around the West Country.
I'm doubtful as to whether Scotrail would release any Sprinters freed up by electrification until they have a sizeable number going spare. There'll be an additional requirement (Not a huge one admittedly) for units to operate the Borders railway as well. Scotrail seem to have a much better knack of holding onto rolling stock as additional capacity than many of the English TOCs do.Electrification of Edinburgh-Glasgow will save 15 class 158s and 17 class 170 units. See: attached
Fingers crossed though that completion of the currently authorised stages of the Scottish electrification programme sees a number of Sprinters trickling down into English hands.
I am in agreement with you that there is no need to order a single new DMU to replace the Pacer fleet, and not just the 142s, but only with the authorisation of further electrification works above those already authorised.
By the end of the next five years I would like to see a lot more four carriage Sprinter (and Pacer, in the areas where they operate: So looking at Valley Lines and Northern) formations operating for a much greater portion of the day where demand requires it. Which, if demand for rail travel is to continue to increase, will be in a lot of places.