Oxford Station - complete rebuild suggestions

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
There was a thread about 6 months ago about alternative suggestions, might save time. Here you go:
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,574
Location
Brighton
..and here's my concept from an even older one, 10 years ago!

&tldr; I proposed abolishing the through roads and using the space to get 6 through platforms and possibly even 2-3 bays.
 

fishwomp

Established Member
Joined
5 Jan 2020
Messages
1,271
Location
milton keynes
What would you do if you could completely rebuild Oxford station and the surrounding tracks, on a similar scale to Reading (or perhaps even more ambitious)? Any ideas welcome.
I'd make it be open 24 hours a day - so that there was no argument about who opens the doors every morning..
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,204
Location
Oxford
With the coming of Cowley and the additional running line to the south from that, I would look to try and segregate the Marylebone and Paddington routes as much as possible.

With the constraint that nobody is going to be rebuilding the Botley Road bridge again, I think the general shape of things as they are could work out. Build platform 2 through, and by moving the buffers south a bit, the track accessing P1 could feed 2 north facing bays for EWR of ~175m.

Then throw some money at resignalling things so that to the north of the station the western pair of lines are for the Cherwell valley and Cotswold lines, with the eastern pair are for the OXP route. To the south the western pair are for Didcot with a single line to Cowley on the eastern side of the formation.(I'd add also a station with a passing loop at Kennington/ Redbridge P&R and platforms on the Didcot lines).

Platform 4/5 become the platforms for Paddington/ Birmingham/ Worcester and 2/3 are used for Marylebone/ Cowley, with reversing sidings on both sides of the formation for trains that terminate from the south, or they could carry on to reverse at Hanborough/ Charlbury/ a new station at Kidlington.

The rest of the "Reading style" rebuild is rebuilding the station building that I've demolished for the new platforms.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,725
Location
Worcester
..and here's my concept from an even older one, 10 years ago!

&tldr; I proposed abolishing the through roads and using the space to get 6 through platforms and possibly even 2-3 bays.
I was just about to say just that — six through platforms.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,607
With the coming of Cowley and the additional running line to the south from that, I would look to try and segregate the Marylebone and Paddington routes as much as possible.

With the constraint that nobody is going to be rebuilding the Botley Road bridge again, I think the general shape of things as they are could work out. Build platform 2 through, and by moving the buffers south a bit, the track accessing P1 could feed 2 north facing bays for EWR of ~175m.

Then throw some money at resignalling things so that to the north of the station the western pair of lines are for the Cherwell valley and Cotswold lines, with the eastern pair are for the OXP route. To the south the western pair are for Didcot with a single line to Cowley on the eastern side of the formation.(I'd add also a station with a passing loop at Kennington/ Redbridge P&R and platforms on the Didcot lines).

Platform 4/5 become the platforms for Paddington/ Birmingham/ Worcester and 2/3 are used for Marylebone/ Cowley, with reversing sidings on both sides of the formation for trains that terminate from the south, or they could carry on to reverse at Hanborough/ Charlbury/ a new station at Kidlington.

The rest of the "Reading style" rebuild is rebuilding the station building that I've demolished for the new platforms.
This makes sense to me. I’ve seen Platform zero plans ages ago and do think only one bay won’t be enough for 4-5tph EWR.

Also we should consider the Didcot semi fast services returning once wires get to Oxford. Those seem good for p3 or 4. And received wisdom is about Hanborough taking the second Padd fast out of the turning mix.

Bristol-Oxford at hourly also seems feasible, indeed likely sooner than wires for the Didcot/Padd stopper! So that needs consideration - or sending the Bristol through to somewhere else which is probably optimal, like Banbury or even Moor St. but staying on the ‘western’ side vs a conflict to to Bicester direction.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,204
Location
Oxford
Part of the idea of a passing loop on the Cowley branch at Kennington is so that the Marylebone trains can cross there without impacting the Didcot line, and then it'd probably only normally need one platform at a time in Oxford station (the existing P2), so platform 3 can be available for anything that's terminating from the south which will at least need a longer dwell time and get in the way of a fast.

Alternatively, without Kennington I don't know how long it's proposed to take to get to Cowley and back, but if those trains can reliably cross in Oxford station then that island will only be occupied for a couple of minutes every 30, so any terminators from the Didcot direction that can't use 4/5 could fit into the 20+ minutes between Marylebone trains.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,624
This makes sense to me. I’ve seen Platform zero plans ages ago and do think only one bay won’t be enough for 4-5tph EWR.

Also we should consider the Didcot semi fast services returning once wires get to Oxford. Those seem good for p3 or 4. And received wisdom is about Hanborough taking the second Padd fast out of the turning mix.

Bristol-Oxford at hourly also seems feasible, indeed likely sooner than wires for the Didcot/Padd stopper! So that needs consideration - or sending the Bristol through to somewhere else which is probably optimal, like Banbury or even Moor St. but staying on the ‘western’ side vs a conflict to to Bicester direction.
The Bristol isn't going to go to Banbury or Moor St, it will go to E-W if its extended.
 