Oxford Corridor Phase 2 & Platform 5 updates

EdChap

Member
Joined
30 Nov 2018
Messages
37
The pigeon seems happy, he can just walk between platforms saving flying!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,482
My World Through a Lens has recorded some footage of the ongoing works.

30 January, via the northern walkway (two days before the possession)

2 February, via the temporary station passage (day two of the possession)

Tomorrow looks like the sunniest + driest day of the bunch, and if works are on schedule it'll also be when they wheel the central piece of the new southern abutment into place.

== Doublepost prevention - post automatically merged: ==

Paid a visit on Wednesday and said box was already in place - judging by Network Rail's OC Facebook feed the 15-minute movement of it took place on Tuesday. From what I could make out the smaller boxes on both sides were also already in place.

During these works Oxford station is essentially split into four segments - the westbound walkway diversion, the eastbound walkway diversion, access to Platforms 1&2 via the secondary (northern) gateline, and the main station building which (platform access aside) is still open.

Whilst travelling on a rail replacement coach from Banbury to Oxford we passed a couple of same-direction flatbed trucks carrying big pieces of concrete along the M40. No pictures but it's possible they were on delivery runs to the worksite.

Walking along Osney Bridge to see the separate works there I couldn't find any sign of SSE on site.

[N.B. The SPMT on site belongs to Mammoet (how appropriate!)]

== Doublepost prevention - post automatically merged: ==

Installation of the new bridge decks should be underway by now.
 

Attachments

  • Botley Road bridge, from Frideswide Square.jpg
    Botley Road bridge, from Frideswide Square.jpg
    821.7 KB · Views: 102
  • Botley Road bridge, from the bicycle park (#1).jpg
    Botley Road bridge, from the bicycle park (#1).jpg
    748.2 KB · Views: 91
  • Botley Road bridge, from the bicycle park (#2).jpg
    Botley Road bridge, from the bicycle park (#2).jpg
    626.2 KB · Views: 89
  • Botley Road bridge, from the bicycle park (#3).jpg
    Botley Road bridge, from the bicycle park (#3).jpg
    608.2 KB · Views: 95
  • Botley Road bridge, from the simultaneously open-&-closed portion of Platform 3.jpg
    Botley Road bridge, from the simultaneously open-&-closed portion of Platform 3.jpg
    795.3 KB · Views: 97
  • East end of Osney Bridge.jpg
    East end of Osney Bridge.jpg
    1.1 MB · Views: 97
  • Open-gate view of Botley Road bridge from the west.jpg
    Open-gate view of Botley Road bridge from the west.jpg
    559.9 KB · Views: 94
  • Spectators.jpg
    Spectators.jpg
    838.1 KB · Views: 95
  • West end of Osney Bridge.jpg
    West end of Osney Bridge.jpg
    831.2 KB · Views: 98
  • Westbound passage on the left, eastbound passage on the right.jpg
    Westbound passage on the left, eastbound passage on the right.jpg
    738.3 KB · Views: 102
Last edited:

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,065
Location
West Wiltshire
Have come across a couple of videos of the new Botley Road bridge at Oxford, which is now in place, and work to replace tracks is commencing.

Doesn't appear to be any sign of the extra span for the additional platform yet.


 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,461
Location
Northampton
There's some great footage (daily updates) being posted by the Oxfordshire Connect facebook page as well, showing the bridge deck now completely in place and waterproofing underway on thursday.

 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,836
Have come across a couple of videos of the new Botley Road bridge at Oxford, which is now in place, and work to replace tracks is commencing.

Doesn't appear to be any sign of the extra span for the additional platform yet.
Around 2 minutes in when you first get a good look, you can see the two smaller spans either side of the main bridge. But they just look like concrete slabs. Understandably they’ve concentrated on getting the main one completed to run trains on Monday.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,065
Location
West Wiltshire
Around 2 minutes in when you first get a good look, you can see the two smaller spans either side of the main bridge. But they just look like concrete slabs. Understandably they’ve concentrated on getting the main one completed to run trains on Monday.
I did notice those, no parapets. Presumably for the extended station.

As there is one on each side, is the plan to add south facing bay or to demolish part of station building and link up the bay platforms at northern end as additional through platforms. Or is it simply a wide pedestrian bridge from car park
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,836
I did notice those, no parapets. Presumably for the extended station.

As there is one on each side, is the plan to add south facing bay or to demolish part of station building and link up the bay platforms at northern end as additional through platforms. Or is it simply a wide pedestrian bridge from car park
There is an aspiration to rebuild the station and make platform 2 a through platform instead of being a bay. So the bridge will be wide enough for a track and a pedestrian crossing. But it will start off life as merely a very wide pedestrian bridge, replacing the one that was removed at the start of the works.
 

djox

Member
Joined
25 Jan 2025
Messages
78
Location
Oxford
Looks like tracks are virtually relayed over the new bridge, so should be fine for Monday morning openingTrack view showing tracks over bridge.

The northern side walkway had now reopened under the bridge and temporary floating bridges over rails have been removed.

The southern side walkway is also in place but I don't think will be used until August.
The span which will be a footpath to connect to Becket Street carpark is still being worked on.
New southern walkway and new span
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,252
There is an aspiration to rebuild the station and make platform 2 a through platform instead of being a bay. So the bridge will be wide enough for a track and a pedestrian crossing. But it will start off life as merely a very wide pedestrian bridge, replacing the one that was removed at the start of the works.
In the PWI video (linked in post # 268), the narrator said that the separate eastern rail deck would be used as a temporary footbridge, until the station masterplan provided another dedicated pedestrian bridge. Have they decided to combine them on the same set of abutments now?
 
Last edited:

Oxfordblues

Member
Joined
22 Dec 2013
Messages
1,118
Yes, they're well ahead of the game today with a rail-mounted crane crossing the bridge this afternoon. I'm one of the cynics who thought they wouldn't possibly get the job done in just 8 days, but I've been proved totally wrong! Tomorrow (Sunday) will be for any snagging and tidying-up and it was wise to have it as an extra day for contingency. Monday's 4E91 02:48 MCT-Leeds looks likely to be the first train, OXF 05/10.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,248
In the PWI video (linked in post # 268), the narrator said that the separate eastern rail deck would be used as a temporary footbridge, until the station masterplan provided another dedicated pedestrian bridge. Have they decided to combine them on the same set of abutments now?
If you look at the drone footage linked above it is the same wdlidth as the western one and not wide enough to do both.

The new extra footbridge bridge would be higher than the other decks due to the toad level being higher at that point.
 

stuving

Member
Joined
26 Jan 2017
Messages
722
The southern side walkway is also in place but I don't think will be used until August.
But it is in use, to hold the bridge spans up! Hence it had to be in place, whether used as a walkway or not.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,461
Location
Northampton
In the PWI video (linked in post # 268), the narrator said that the separate eastern rail deck would be used as a temporary footbridge, until the station masterplan provided another dedicated pedestrian bridge. Have they decided to combine them on the same set of abutments now?
Network Rail's documentation has a bit better explanation: https://docs.planning.org.uk/20210802/8/QWC16OMF14300/9qlkl4vp1g5j00e7.pdf

2.32 In addition as well as a change and evolution to the station we have changed the footbridge design over Botley Road as the existing footbridge needs to be demolished and replaced as with the new road layout and new 4m cycle/ pedestrian route either side of the road means that the existing bridge would not be wide enough to be reused. The original design submitted for preapplication feedback showed the below layout for a new footbridge and passive provision (pink outline on the left image) for future bridge to accommodate another railway track on it with the new footbridge to the side of it.
2.33 ... However as the Council have aspirations for a “landmark” footbridge to be installed in this approximate location much wider than the footbridge proposed by Network Rail as part of the future station masterplan proposals if the original design as shown below was installed as part of the Oxford phase 2 project this would remove the ability to install something different later.
2.34 If the Councils aspired Landmark bridge does not come forward when Oxford Phase 3 works do, we will propose a footbridge similar to the above as part of the railway station and capacity scheme.
2.35 The proposed rail span is as the below section. The proposal would be to provide the footway at bottom ballast level, directly onto the bridge deck (with some interim waterproofing and non-slip surfacing). An additional pair of handrails would be provided at the inner ends of the higher level deck, to prevent pedestrians from climbing onto the upper level.

In summary: The original footbridge needed to be demolished to facilitate the new road & cycle/pedestrian width. Network Rail wanted to replace mostly like-for-like, but the council have aspirations for a 'landmark' footbridge on the site of the original footbridge. Therefore, to allow the council to use the site, NR will install a temporary walkway on the bridge deck earmarked for the rebuilding of platform 2.

If the council have not built their new "landmark" footbridge before NR need their bridge back, NR plan to build what they would have built in the first place to maintain the connectivity.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,252
Network Rail's documentation has a bit better explanation: https://docs.planning.org.uk/20210802/8/QWC16OMF14300/9qlkl4vp1g5j00e7.pdf

In summary: The original footbridge needed to be demolished to facilitate the new road & cycle/pedestrian width. Network Rail wanted to replace mostly like-for-like, but the council have aspirations for a 'landmark' footbridge on the site of the original footbridge. Therefore, to allow the council to use the site, NR will install a temporary walkway on the bridge deck earmarked for the rebuilding of platform 2.

If the council have not built their new "landmark" footbridge before NR need their bridge back, NR plan to build what they would have built in the first place to maintain the connectivity.
Thanks for finding that document, I’d tried and failed to find something relevant, but there’s a lot to scan through. The drawings also make it fairly clear the slabs that are now visible, resting on the two sets of single track bridge abutments, are just a small part of what will be fitted.
 
Last edited:

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,461
Location
Northampton
Wonder what the Council mean by a 'landmark' bridge? Modelled on the Forth or Golden Gate bridges perhaps, or as this is ex-GWR territory, the Royal Albert Bridge.....
No idea but NR were proposing a fairly utilitarian truss bridge, so presumably the council are hoping somebody will come along that can be cajoled into paying for a bridge that doesn't look like it was craned off the back of a lorry. Quite possibly they want something sleek and metal, a bit like this bridge over the Floating Harbour in Bristol: https://en.wikipedia.org/wiki/Meads_Reach_Bridge (although hopefully without the perforated deck!)

All round it's a bit of joined-up thinking from both parties (astonishing in modern Britain). NR need to build the eastern span now anyway because it's part of the road rebuild, they save themselves the cost of an immediate replacement footbridge, the site is left open for the Council to develop a plan for, and when the time comes to take the eastern span back for the railway use, they can build either the new 'landmark' bridge or the more direct replacement off-line and only need to diver the footpath once, rather than have another temporary arrangement.

It's not clear what would happen that in the event the 'landmark' bridge was completed quite a while before NR are thinking about rebuilding platform 2, whether the footpath over the eastern span would remain and for a while there'd be 2 bridges, or if they'd just move the footpath and have done with it. Probably a bridge to be crossed later, as it were!
 

Neen Sollars

Member
Joined
21 Jul 2018
Messages
342

Super You Tube flyover of all of Oxford railway station by Regina Olphert. I watched it on mute. Weekend work nearly completed.

However as always many more questions follow. When is Platform 5 construction work due to start? Platform 4 will be widened? New bridge over Sheepwash required? Rear access to row of terraced houses closest to the sheepwash will be lost? Will Platform 5 and its new North (?) entrance station building be constructed before the southern side?

Edit: On closer inspection, looks like existing footpath from student accommodation could be maintained alongside the new railway line. Seems the rear of the terrace houses have no "official" access to what appears to be railway land at the rear of platform 4?
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,252
Super You Tube flyover of all of Oxford railway station by Regina Olphert. I watched it on mute. Weekend work nearly completed.

However as always many more questions follow. When is Platform 5 construction work due to start? Platform 4 will be widened? New bridge over Sheepwash required? Rear access to row of terraced houses closest to the sheepwash will be lost? Will Platform 5 and its new North (?) entrance station building be constructed before the southern side?

Edit: On closer inspection, looks like existing footpath from student accommodation could be maintained alongside the new railway line. Seems the rear of the terrace houses have no "official" access to what appears to be railway land at the rear of platform 4?
The chap doing that video, (and it‘s also obvious in his earlier work), seems to have not known that back in 2024 Network Rail confirmed that although design work on P5, the western entrance, and the new Sheepwash channel bridge would continue, the physical work would not start until later in 2026.

It was never in the scope of this week’s work to demolish any station structures on the P5 site, or lay any additional track over the new western bridge span. The rest of the new bridge works can fairly obviously be done once the railway is reopened.

A side point, the new Western entrance to the station is to be broadly where the YMCA building was demolished.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,248
Platform 4 will be widened?
No pretty much the same width as now away from the buildings (the existing buildings will get demolished as the P5 track will go though them). There won't be much facilities wise at platform level.
Edit: On closer inspection, looks like existing footpath from student accommodation could be maintained alongside the new railway line.
New bridge deck for new road alignment slight further to the west, the Nursery was already demolished to the North-West corner of the bridge to enable this
 

Neen Sollars

Member
Joined
21 Jul 2018
Messages
342
Thanks for the reponses, situation much clearer on further viewing. Rebuild of Oxford station will be an interesting watch whenever it happens.
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,482
Bridge replacement complete as per Network Rail presser, though no timelapse footage yet.


The barriers I took a picture of last Wednesday (removed from my previous post) are actually for the trackside walkways on the bridge, not the pedestrian walkways underneath it as I previously thought.

Trackside walkway barriers ready for installation.jpg
 

stuving

Member
Joined
26 Jan 2017
Messages
722
Has anyone come across any details of the internal structure of the bridge decks? I don't recall anything other than the section drawing of the "P2" span in the planning documents (linked in post #703), and what's now there does not look the same as that. They all look remarkably shallow, given the bending strength and rigidity required to carry trains.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,252
Has anyone come across any details of the internal structure of the bridge decks? I don't recall anything other than the section drawing of the "P2" span in the planning documents (linked in post #703), and what's now there does not look the same as that. They all look remarkably shallow, given the bending strength and rigidity required to carry trains.
There’s a long section at 33 minutes into the previously mentioned PWI video, (liked in post #268). That’s the easiest to find that I’ve seen. It shows how the east bridge for P2 will have an extra temporary set of inboard guardrails. I’m still thinking there’s more concrete beams yet to be placed either side of what’s there now?
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,248
What is there of the P2 and P5 will just serve as the base for lots of rebar and in-situ cast concrete without the need for any substantial cranes etc. (thus resulting in zero risk of big crane toppling on to live tracks). Unlike the main 4 track span there is far less time pressure to get the track open again.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,252
What is there of the P2 and P5 will just serve as the base for lots of rebar and in-situ cast concrete without the need for any substantial cranes etc. (thus resulting in zero risk of big crane toppling on to live tracks). Unlike the main 4 track span there is far less time pressure to get the track open again.
That makes sense looking at it magnified. Is that what the civil engineers call permanent formwork?
 

stuving

Member
Joined
26 Jan 2017
Messages
722
What is there of the P2 and P5 will just serve as the base for lots of rebar and in-situ cast concrete without the need for any substantial cranes etc. (thus resulting in zero risk of big crane toppling on to live tracks). Unlike the main 4 track span there is far less time pressure to get the track open again.
That's essentially the same section drawing - even the same ... recognisable ... colours.

Having looked at the drone photos in NR's news release (at full resolution), it is clear that the six slabs now in place (two for P5 and P2, and four within the main bridge) are the sole structural elements of the deck. There are beams at each side that are deeper, but there is nothing to couple support from them across to the two central deck slabs (A3 and A4; you can see the markings in one of the photos). I can't see a way to demonstrate that with a few snapshots from those photos; you'll have to go and look for yourself.

Taking measurements off the drawing in the planning statement, you can work out the depth of each layer:
deck slab: 475.
waterproofing: 25
ballast up to sleeper base: 210
track to railhead: 363 (from abutment 1073)
beam to the side (from abutment): 1406
What is there of the P2 and P5 will just serve as the base for lots of rebar and in-situ cast concrete without the need for any substantial cranes etc. (thus resulting in zero risk of big crane toppling on to live tracks). Unlike the main 4 track span there is far less time pressure to get the track open again.
As there's been no reinforced concrete on the slabs in the main bridge, it would be odd to put any on the two side spans. And in any case why put reinforcement, which works in tension, above the slab which is what resists compression? It could not add bending strength or rigidity. And the two two side spans are already slightly higher than the main bridge (for road clearance); adding more depth would raise them much higher so they would not line up with the main lines at the junction or across the platforms.

So I wonder what gives the three "planks" in each slab their strength and rigidity - carbon fibre?
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,855
Location
Beeston (Notts)
Interesting tidbit I saw from drone pictures posted to Network Rail's website - OLE structures in use for a temporary cable bridge! Said supports are highlighted in green below.
Drone Friday 6 February_new bridge spans in place DJI_20260206100750_0004_W.JPG

The supports were, sadly, never going to be anything but temporary - the pair at the south end don't quite line up, and the masts are too short to take a portal boom (besides which, they're the wrong shape of mast to take the big monoboom anchors). The ones north of the bridge were even shorter still.
That said, a lovely piece of innovation!
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,482
Bridge replacement timelapse is now up on the OC Facebook page.

️
Heavy lifting: We used 5 cranes and a 48-wheeled transporter to move the 400+ tonne central box structure.
️
The build: 3 new bridge spans installed and 200 metres of track reinstated.
♻️
Clearance: 2,000 tonnes demolished and 2,500 tonnes of waste removed from site.
1f477.png
The team: 200 colleagues and partners working in shifts to deliver 25,000 hours of work.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,611
Interesting tidbit I saw from drone pictures posted to Network Rail's website - OLE structures in use for a temporary cable bridge! Said supports are highlighted in green below.
View attachment 197768

The supports were, sadly, never going to be anything but temporary - the pair at the south end don't quite line up, and the masts are too short to take a portal boom (besides which, they're the wrong shape of mast to take the big monoboom anchors). The ones north of the bridge were even shorter still.
That said, a lovely piece of innovation!
Is A6 a future alignment / road for the new through P2?
 