PHILIPE
Veteran Member
Chaos this morning in Bath Spa area due to overrunning Engineering Work. Work is taking place between 8th and 23rd April in order to widen and lengthen the platforms with only one in use at a time. At the moment, Platform 1 is in use but this morning there is a reduction in addition to the planned reduction in services. Cardiff to Portsmouths running through but calling additionally at stations normally served by other services between Bristol and Westbury which have had to be cancelled at short notice. Severe overcrowding reported and disruption could continue for the rest of the day.
Last edited: