Since the Dec22 and May23 timetable implemented, there seems to be a great imbalance of runtime of westbound to eastbound, which often from stations like Welling, Abbey Wood and Sidcup to London Bridge has runtime of 8 minutes longer than the eastbound equivalent over a 25 minute running time.
The lengthening of runtime seems to be having the runtime of westbound between stations to have one or two minutes in runtime, which at the end have caused an unofficial dwell time of two full minutes. This is also worsen by SE drivers often close door right at 30 seconds prior and often have caused 20 seconds early departure (which I often suggest DOO don’t require 30 seconds for door closing but 15 seconds would be more than enough [Tokyo metro can do with 7 seconds even with conductor and communication]).
It seems to be a total waste of passengers time for having slow running / long dwell, and even sometime Google Map even suggested that I can travel faster on a bus parallel to the railway (e.g. Welling to Blackheath and Lewisham)
The lengthening of runtime seems to be having the runtime of westbound between stations to have one or two minutes in runtime, which at the end have caused an unofficial dwell time of two full minutes. This is also worsen by SE drivers often close door right at 30 seconds prior and often have caused 20 seconds early departure (which I often suggest DOO don’t require 30 seconds for door closing but 15 seconds would be more than enough [Tokyo metro can do with 7 seconds even with conductor and communication]).
It seems to be a total waste of passengers time for having slow running / long dwell, and even sometime Google Map even suggested that I can travel faster on a bus parallel to the railway (e.g. Welling to Blackheath and Lewisham)