sbf kent
Member
The line between Otford and Ashford International has been closed for nine days. This morning, Monday 1st June, on a train stopped outside Borough Green. Did the engineering work impact the signalling system was this not tested before reopening the line?
== Doublepost prevention - post automatically merged: ==
Just to add great info update from.driver and guard, well done to them both.
== Doublepost prevention - post automatically merged: ==
Just to add great info update from.driver and guard, well done to them both.
Last edited: