ORR opens consultation on changing when timetable information is confirmed

Status
Not open for further replies.

BenS123

Member
Joined
1 Jan 2022
Messages
228
Location
Bournemouth

(Edited) The ORR is running a consultation whether to ratify a change to the Network Code which would mean the deadline for confirming the timetable will become 8 weeks before travel instead of 12
This would mean that train operators would only be able to inform passengers of confirmed train times at this eight-week milestone, thereby introducing a new ‘Informed Traveller’ deadline at T-8
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,269
To be clear, the Industry has passed the change to the Network Code but it now needs two things;

1. The ORR has to ratify the change to the Code.

2. NR needs to change its Licence in order for it to happen. This requires a Statutory Consultation as part of the ORR approval process for a Licence change.
 

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
Weeks? Months? I thought timetables are confirmed at 10pm the night before giving passengers for the 0001 service from Huddersborough a good two hours to prepare. Or not. ;)
 

BenS123

Member
Joined
1 Jan 2022
Messages
228
Location
Bournemouth
To be clear, the Industry has passed the change to the Network Code but it now needs two things;

1. The ORR has to ratify the change to the Code.

2. NR needs to change its Licence in order for it to happen. This requires a Statutory Consultation as part of the ORR approval process for a Licence change.
Updated the original post - thanks for clarifying :D
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,763
Location
UK
Utterly superfluous box-ticking exercise. What's the ORR going to do, refuse? It hasn't taken any enforcement action over NR being in continuous breach of its Licence for years - let alone most, if not all, TOCs being in breach of their licences when it comes to their PRO responsibilities.

The ORR really needs to step up its game to protect passengers, but it is far too much of a lapdog to do so.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,682
Location
Hope Valley
The ORR had certainly taken licence enforcement action against Network Rail for general timetabling and specifically ‘T-12’ compliance in the past.

Obviously not very helpful with all the Covid changes, strikes, extreme events (e.g. Newnham bridge) and so on in recent times.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,164
Location
West Wiltshire
The ORR seems to have forgotten its role, it might have gone soft when Covid was around and unplanned changes became necessary.

But really it ought to be now saying, you have had a year to catch up after Covid restrictions ended, we (the ORR) will be enforcing the existing 12 week rules again in 3 months time.

No more post covid excuses, start delivering again, or hefty penalties will be issued. Not taking the approach that it can be a regulator that doesn't feel any need to regulate the rules.
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,269
And what is that going to do? The 14 DfT TOCs are effectively nationalised, NR is nationalised, and any penalties will go to the Treasury.

If the DfT continues to support T-8 and the actions of NR/TOCs, then fining Government controlled entities just becomes a pointless exercise and everybody knows it.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,164
Location
West Wiltshire
And what is that going to do? The 14 DfT TOCs are effectively nationalised, NR is nationalised, and any penalties will go to the Treasury.

If the DfT continues to support T-8 and the actions of NR/TOCs, then fining Government controlled entities just becomes a pointless exercise and everybody knows it.

Does DfT support T-8 long term, or is it just the temporary post covid target.

If you believe they do want it as a permanent change, can you please link some evidence that shows DfT (not independent ORR) have revised their aims from T-12 in the Network licence they granted (linked)

 

station_road

Member
Joined
3 Mar 2021
Messages
338
Location
By the sea
Does DfT support T-8 long term, or is it just the temporary post covid target.

If you believe they do want it as a permanent change, can you please link some evidence that shows DfT (not independent ORR) have revised their aims from T-12 in the Network licence they granted (linked)

Whether DfT supports it or not, what is the point of a regulator fining a government-controlled body who receive much of their funding from government grants? (the only possible real impact being that money goes to the Treasury and out of the rail industry, so less spent on things which could improve things for passengers and freight).

There is a separate debate then about how NR and the DfT TOCs can be held to account - answers on a postcard!
 

nr758123

Member
Joined
3 Jun 2014
Messages
645
Location
West Yorkshire
Weeks? Months? I thought timetables are confirmed at 10pm the night before giving passengers for the 0001 service from Huddersborough a good two hours to prepare. Or not. ;)
That's been my experience, too. It's difficult to see why it makes a difference between 12 & 8 weeks when TPE are allowed to make "changes to the timetable" - their words not mine - at 10pm the night before.
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,269
Does DfT support T-8 long term, or is it just the temporary post covid target.

If you believe they do want it as a permanent change, can you please link some evidence that shows DfT (not independent ORR) have revised their aims from T-12 in the Network licence they granted (linked)


The DfT were consulted as part of the “Proposal for Change” (120) that went through the Industry “Class Representative Committee” (CRC is the formal determining body for Industry Rules) and raised no objections.

Indeed, they said in their reply that the intended process “seeks to strike the right balance between agility….and giving the customer certainty”. They “welcomed” informed Traveller arrangements “aligned between the parties that will be meaningful and effective”.

The DfT, of course, have another bite at this as part of the Licence consultation but the “Franchised” reps at CRC felt they had no choice but to vote for PfC 120 and it went through to the next stage, which is ORR approval. The ability of NR to change their Licence was one of the two caveats that CRC put on their decision, the other being the ORR being satisfied on a legal point about the December timetable change date.
 
Joined
2 Feb 2010
Messages
105
Whether DfT supports it or not, what is the point of a regulator fining a government-controlled body who receive much of their funding from government grants? (the only possible real impact being that money goes to the Treasury and out of the rail industry, so less spent on things which could improve things for passengers and freight).

There is a separate debate then about how NR and the DfT TOCs can be held to account - answers on a postcard!

Quite right-- the DFT ministers hide behind Network Rail and Network Rail hide behind DFT.

There should be a 'commissioner for the railways' appointed by the Secretary of State and that is where the buck stops.

This proposal is going completely in the wrong direction; timetables should be set much further in advance. Particularly for intercity services, they should be able to be booked a year in advance. I appreciate some changes will have to be made once the football calendar comes out etc... but broadly if the railways are going to compete with planes the same ambition of booking a year in advance should apply.

See... https://www.railforums.co.uk/threads/timetables-set-18-24-months-into-the-future.241667/
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,705
The DfT were consulted as part of the “Proposal for Change” (120) that went through the Industry “Class Representative Committee” (CRC is the formal determining body for Industry Rules) and raised no objections.

Indeed, they said in their reply that the intended process “seeks to strike the right balance between agility….and giving the customer certainty”. They “welcomed” informed Traveller arrangements “aligned between the parties that will be meaningful and effective”.

The DfT, of course, have another bite at this as part of the Licence consultation but the “Franchised” reps at CRC felt they had no choice but to vote for PfC 120 and it went through to the next stage, which is ORR approval. The ability of NR to change their Licence was one of the two caveats that CRC put on their decision, the other being the ORR being satisfied on a legal point about the December timetable change date.
Which is why it went through 6-2 at the CRC vote. The FOC votes being the 2 against it.

== Doublepost prevention - post automatically merged: ==

Quite right-- the DFT ministers hide behind Network Rail and Network Rail hide behind DFT.

There should be a 'commissioner for the railways' appointed by the Secretary of State and that is where the buck stops.

This proposal is going completely in the wrong direction; timetables should be set much further in advance. Particularly for intercity services, they should be able to be booked a year in advance. I appreciate some changes will have to be made once the football calendar comes out etc... but broadly if the railways are going to compete with planes the same ambition of booking a year in advance should apply.

See... https://www.railforums.co.uk/threads/timetables-set-18-24-months-into-the-future.241667/
That's fine as long as its caveated the schedule can still change, or you are in a position where every single piece of disruption has to be nailed down over a year in advance. That is never going to happen.
 

Gaelan

Member
Joined
3 Apr 2023
Messages
1,007
Location
Edinburgh
This proposal is going completely in the wrong direction; timetables should be set much further in advance. Particularly for intercity services, they should be able to be booked a year in advance. I appreciate some changes will have to be made once the football calendar comes out etc... but broadly if the railways are going to compete with planes the same ambition of booking a year in advance should apply.
I'm not entirely sure I agree - I suspect if it becomes possible to book out a year in advance, it will sooner or later become necessary to book out that far to get reasonable prices.
 

Class83

Member
Joined
8 Jun 2012
Messages
610
I'm not entirely sure I agree - I suspect if it becomes possible to book out a year in advance, it will sooner or later become necessary to book out that far to get reasonable prices.
Alignment with Eurostar would be a start, the cheapest Eurostar fares can sell out before you know if a cheap advance connection is available.
 

Gaelan

Member
Joined
3 Apr 2023
Messages
1,007
Location
Edinburgh
Alignment with Eurostar would be a start, the cheapest Eurostar fares can sell out before you know if a cheap advance connection is available.
Good point - this also happens with advances involving a connection between two TOCs, where one leg’s cheap advances will sell out before the booking starts for the other leg.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
T-18 basically becomes nigh on impossible if you go to three timetable changes per year. The DfT wants to be able to change its mind and not make a decision until the last minute (or even beyond) as we saw with the 2018 TT.

The problem with that is it impacts on the Long Term Planning and until that is completed you cannot build the Engineering Plans on top of the LTP base. What that means is you cannot release fares for purchase because that relies on actual train schedules being published.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,705
T-18 basically becomes nigh on impossible if you go to three timetable changes per year. The DfT wants to be able to change its mind and not make a decision until the last minute (or even beyond) as we saw with the 2018 TT.

The problem with that is it impacts on the Long Term Planning and until that is completed you cannot build the Engineering Plans on top of the LTP base. What that means is you cannot release fares for purchase because that relies on actual train schedules being published.
Its not technically three though. The February change is optional, I'll be surprised if many operators do anything then.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,705

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,016
Location
Surrey
Wondered when this would land in the wild, rumoured to have been knocked back a few weeks ago.
Delighted that ORR haven't caved in. NR & the TOCs need to adequately resource all teams involved with engineering works planning so they consistently deliver this now.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,705
Delighted that ORR haven't caved in. NR & the TOCs need to adequately resource all teams involved with engineering works planning so they consistently deliver this now.
Not sure of the correlation myself. It certainly wasnt proposed for that. The draft and confirmed period possession plan dates werent moving for a start.
 