Further to the weathering steel discussion, the wiggly bits (or "cascades") were not yet looking rusty when placed:

https://twitter.com/networkrailnp

You could say that weathering steel is an attempt to make steel act like aluminium, which quickly acquires a coat of oxide when exposed to the air, and that coat then protects it from further corrosion.

Correct and chromium too incidentally
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,617
Location
Rochdale
The ends of the carriages have a pretty severe taper at their ends. You would hope TPE have done their homework though!
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,604
Location
Nottingham
It still needed extra clearance work on GW lines which take 23m HSTs.

Geometry says however much the ends are tapered, there is still a certain radius of curve at which a 26m coach will protrude outside the envelope of a 23m coach. As I believe the bogie centres and the maximum width are the same, this will appear on the outside rather than the inside of the curve.

There is also the question of stepping distance to doors at curved platforms - for a "convex" platform both the extra length and the taper will increase this.
 

lejog

Established Member
Joined
27 Feb 2015
Messages
1,323
Do we have an expected commissioning date for the cord as yet?
An off-peak Calder Valley to Oxford Road service is due to start December this year, extended through to the Airport all day from May 18. I'm not sure if there will be any TPE services before May 2018.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,237
The platforms were rebuilt at Bath Spa. Is that part of the work?

Not necessarily. AIUI they needed to gain electrification clearances between OHLE and canopies, but decided to achieve it without altering the canopies - so by moving the track away. They also needed to extend the length of the platforms.

I don't think there have been significant numbers of places on GW where an SET wouldn't physically pass the platform edge. As has been said, they are basically supposed to go wherever HSTs can already go. Platform length increases for the longer trains are probably the majority of the work.

Did they change anything significantly to allow IEPs through curved platforms at places such as York and Newcastle?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Not necessarily. AIUI they needed to gain electrification clearances between OHLE and canopies, but decided to achieve it without altering the canopies - so by moving the track away. They also needed to extend the length of the platforms.

I don't think there have been significant numbers of places on GW where an SET wouldn't physically pass the platform edge. As has been said, they are basically supposed to go wherever HSTs can already go. Platform length increases for the longer trains are probably the majority of the work.

Did they change anything significantly to allow IEPs through curved platforms at places such as York and Newcastle?

Is the issue of Worcester-Hereford (through Malvern/Ledbury tunnels) resolved?
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,617
Location
Rochdale
142s will be no doubt be cleared as a job lot with all the other DMUs that are currently cleared for the area. They are still going to be with us for a while yet. Infact the first Northern service could well be a 142!

I wouldn't imagine class 373s (Eurostar) or class 395s either.
 
Last edited:

Whistler40145

Established Member
Joined
30 Apr 2010
Messages
6,149
Location
Lancashire
142s will be no doubt be cleared as a job lot with all the other DMUs. They are still going to be with us for a while yet. Infact the first Northern service could well be a 142!

I wouldn't imagine class 373s (Eurostar) class 395s either.

Any third rail emu? [emoji38]
I was wondering if for any reason that a Pendolino had to reverse at Manchester Victoria, would they be route cleared?
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,347
Location
Yorkshire
I just wondered if they'd fit around the Curve.

I'd be surprised if they wouldn't fit: presumably TPE Hitachi sets will be cleared surely, as will 23+m stock such as 158s and 185s. Presumably no need to fit TASS balises for such a short and slow section so they'd just run with tilt deactivated.

Whether the likelihood of such a move is considered high enough to bother to do the paperwork is probably a bigger question.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
I'd be surprised if they wouldn't fit: presumably TPE Hitachi sets will be cleared surely, as will 23+m stock such as 158s and 185s. Presumably no need to fit TASS balises for such a short and slow section so they'd just run with tilt deactivated.

Whether the likelihood of such a move is considered high enough to bother to do the paperwork is probably a bigger question.

UK tilt is inhibited below 40mph anyway.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,604
Location
Nottingham
As has been said, they are basically supposed to go wherever HSTs can already go.

The tighter the radius the further the ends stick out on the outside of the curve, so beyond a certain radius they will stick out further than Mk3 ends despite having a greater chamfer. I have no idea what this radius is, although it could be worked out from the respective end widths, total widths and bogie centres. I believe the bogie centres on the 80x and the Mk3 are the same, so if the width is also the same there is no such issue on the inside of curves. Pembroke Dock is one place HSTs can go that 80x can't.

Not necessarily. AIUI they needed to gain electrification clearances between OHLE and canopies, but decided to achieve it without altering the canopies - so by moving the track away. They also needed to extend the length of the platforms.

I believe they have also eased the curvature of the platforms but I don't know if this was essential or just a good thing to do when they had to rebuild them anyway. The 80x will have a greater stepping distance than a Mk3 on a convex platform, because the coach ends are both narrower and further from the bogies.
 

55z

Member
Joined
21 Nov 2014
Messages
183
Dont understand as to why Bath station is getting mixed up with the Ordsall Curve discussion I didn't think they were close by !!!
Ordsall Curve, Salford wires are being engergised at the beginning of October as is the down slow between Roby and Huyton.
 