• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

On Track Plant Maximum Speed

Status
Not open for further replies.

Temple Meads

Established Member
Joined
2 Sep 2010
Messages
2,283
Location
Devon
Hi everyone, I'm just wondering what is the maximum speed of things like Tampers, Stoneblowers and Grinders?

You know the ones that run on the mainline, and look relatively like normal trains.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,416
There are now "high speed grinders" that can work at 50-60mph or so.

They are used extensively in Germany apparently.
Such things probably strengthen the case for slab track rather alot... since I believe grinding is the only maintenance a slab track settup actually requires.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,416
Other than new Rail, Insulators, Fastenings, Pads etc

Many lab track installations that have seen very heavy use have not required significant maintenance along those lines (especially not new rails) for 25 years or more after installation.

(The maintenance costs for slab track in Japan are a quarter those of conventional track and most of that appears to be grinding).

I am sure one engineering closure every 20-30 years or more is an improvement over the current system.
 
Status
Not open for further replies.