Oldham Loop closure

Status
Not open for further replies.

TrainBrain

New Member
Joined
4 Aug 2009
Messages
4
So the Oldham Loop closes in two months time. According to my friendly NR conductor once the line closes NR relinquish all responsibility for the line and from October 3rd Metrolink will be providing replacement bus services.

Does anyone know anything about the plans they have with replacement services and if they will start as soon as the line shuts? Will they be stopping at the rail stops or the planned Metrolink stops?

Will they be more frequent than the trains and have any zones been established yet so I figure out the fare?

Thanks for your help!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hairyhandedfool

Established Member
Joined
14 Apr 2008
Messages
8,837
As I understand it, GMPTE is talking to bus operators to provide 'an enhanced service' to cater for those who may switch to that mode of transport during the closure of the line.
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,321
When the Bury & Altrincham lines were transferred to Metrolink, they retained the original platforms. Revisiting some Oldham loop stations a week or two ago, those I observed had all been completely flattened. Presumably, new platforms wiil be built - but why get rid of platforms that were mostly in useable condition? Building lots of new platforms must be adding £ millions to the cost of the conversion.

Bevan Price
 

142094

Established Member
Joined
7 Nov 2009
Messages
8,789
Location
Newcastle
I was there on the last day and I have to say a few of the stations looked as if they needed pulling down - Hollinwood and Failsworth to name two. IIRC part of Hollinwood was being held up by steel supports, and some of the platform had fallen away towards the back. Plus I guess they wouldn't meet diasbility requirements. Best to start again. At least part of Oldham MUmps was saved by the ELR.
 

PR1Berske

Established Member
Joined
27 Jul 2010
Messages
3,025
I was there on the last day and I have to say a few of the stations looked as if they needed pulling down - Hollinwood and Failsworth to name two. IIRC part of Hollinwood was being held up by steel supports, and some of the platform had fallen away towards the back. Plus I guess they wouldn't meet diasbility requirements. Best to start again. At least part of Oldham MUmps was saved by the ELR.

The DDA dictated (if that's not too strong a word) how the new Metrolink stations have been designed.
 

142094

Established Member
Joined
7 Nov 2009
Messages
8,789
Location
Newcastle
Think it was Failsworth that had a steep back to the platform from the road. IIRC Hollinwood also had steps to a subway to reach the other platform although there may have been a bridge across.
 

PR1Berske

Established Member
Joined
27 Jul 2010
Messages
3,025
What kind of on-line coverage is there of the current status of the construction process ? Web cams or blogs or similar?
 