Peregrine 4903
Established Member
If HS2 gets built and the Old Oak Common Interchange is built, I've noticed that surely this would be a good opportunity to re-double the South Ruislip to Old Oak Common line, re-open it for regular passenger use and build a terminating station at Old Oak Common interchange.
Obviously at the minute there is no point in re-opening the line as there is no capacity at Paddington station for Chiltern services. However once Old Oak Common Interchange opens providing an alternate terminating station for London Maylerbone which is quite a restriced terminus with only 6 platforms seems like a no brainer.
London Maylerbone only has 6 platforms with not much room for expansion and more services are likely to be needed to run on the line especially with the opening of East to West Rail. With the opening of the Old Oak Common interchange a large portion on train services could be diverted to the Old Oak Common Interchange meaning Maylerbone can become more focsued on Aylesbury, Milton Keynes and Birmingham train services. It could also mean longer trains could run.
Old Oak Common could be more focused on the commuter services running to Gerrards Cross, High Wycombe, Princes Risborough, Bicester, Banbury, Stratford Upon Avon and possibly Oxford but that would likely clash with GWR services so those could continue running into Maylerbone.
Not only that but Old Oak Common interchange would be far better connected than Maylerbone anyway with regular trains to Paddington, Euston, Crossrail services, Overground services and other national rail services to all variety of destinations.
It could also greatly improve travel opportunites for the residents of Greenford and Perivale, as well as providing links to the Central Line.
It would require some significant infrastructure work and the remodelling of the South Ruislip junction, but overall I think it would increase capacity and seems like a really good idea.
I've just seen Network Rail have released a report saying this should happen and I definetly agree with them, I think it should happen earlier than 2043 is possible.
Obviously at the minute there is no point in re-opening the line as there is no capacity at Paddington station for Chiltern services. However once Old Oak Common Interchange opens providing an alternate terminating station for London Maylerbone which is quite a restriced terminus with only 6 platforms seems like a no brainer.
London Maylerbone only has 6 platforms with not much room for expansion and more services are likely to be needed to run on the line especially with the opening of East to West Rail. With the opening of the Old Oak Common interchange a large portion on train services could be diverted to the Old Oak Common Interchange meaning Maylerbone can become more focsued on Aylesbury, Milton Keynes and Birmingham train services. It could also mean longer trains could run.
Old Oak Common could be more focused on the commuter services running to Gerrards Cross, High Wycombe, Princes Risborough, Bicester, Banbury, Stratford Upon Avon and possibly Oxford but that would likely clash with GWR services so those could continue running into Maylerbone.
Not only that but Old Oak Common interchange would be far better connected than Maylerbone anyway with regular trains to Paddington, Euston, Crossrail services, Overground services and other national rail services to all variety of destinations.
It could also greatly improve travel opportunites for the residents of Greenford and Perivale, as well as providing links to the Central Line.
It would require some significant infrastructure work and the remodelling of the South Ruislip junction, but overall I think it would increase capacity and seems like a really good idea.
I've just seen Network Rail have released a report saying this should happen and I definetly agree with them, I think it should happen earlier than 2043 is possible.
Last edited: