Couldn't find a good place to start with the enabling works on the GWML for Old Oak Common "conventional" station, so here goes.

Colas Rail & the South Rail System Alliance (SRSA; of which Colas is a part) have been doing a fair bit of tweaking on the GWML to allow work at OOC to begin.
Their most recent update is this: https://www.linkedin.com/posts/sout...=linkedin_share&utm_medium=member_desktop_web
South Rail Systems Alliance said:
Old Oak Common Continue To Make Progress!

#TeamOOC have been been working hard on the Early Works Package A for the new rail systems alignment of the Great Western Main Line!


Over the last few weeks the team have:

✅Completed installing 1000m of ground and elevated trough route for the ATF and run out all the cables
✅Installed two new OLE structures to facilitate a headspan shortening
✅Installed two new OLE structures to transfer to a portal in the coming weeks

Keep up the great work team!

#RailIndustry #Teamwork #Railway #Engineering #ProjectManagement #HS2 #HighSpeedRail #Rail #SafetyFirst #London

No alternative text description for this image

No alternative text description for this image

No alternative text description for this image
Looks like the headspan shortening follows the removal of the old reception line for OOC EMU depot (Reception Line 1) and plain-lining of all associated S&C. The two headspans in the pictures, J05/29 (1st pic) & J05/26 (2nd pic) were both 5-track and will now be 4-track.
The team have also installed new switches west of Acton Main Line to facilitate easier isolations around OOC: https://cutt.ly/xOvt1sO.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,856
Location
Beeston (Notts)
Looks good. Thank you for starting. :)
Thanks @mr_moo!
Passing through OOC just now, both the headspans mentioned above have now been shortened, and the new Series 1 anchor portal has now gained its boom.
The Up Side Double ATF feeder (2 cables on 1 insulator) is still on the old masts, but that looks set to go into the ground troughs. I suspect the old masts will go after that's done.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,979
Location
London
Yes the Relief Lines have been blocked on a few Saturdays and many Sundays due to the work required. The reception line still remains available for access to OOC depot for the Elizabeth Line, although one of the sidings/lines associated with the HEX depot has I think being marked OOU.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,856
Location
Beeston (Notts)
Can confirm that the Up side ATF has now been removed and presumably put in the 1000m of ground trough. The insulators remain but are bare.
 

WiredUp

Member
Joined
17 May 2021
Messages
97
Location
Bedford
Yep, removed by SRSA and converted to cabled ATF in troughing. It's sub-section 8001D for the Reliefs ATF.
 