Noticed this morning that OHLE runs over the end of Platforms 4/5 at Bletchley from when this was a track into the depot (now removed to allow a 12-car extension).

Does this occur anywhere else? I've never seen it before, and wonder if it has any unusual safety implications, as it does feel rather close to the platform - it would seem a bit easy to end up making contact with it with e.g. a balloon or something.

Any reason why it wouldn't simply have been removed when the track it served was lifted?

Photo is of the above OHLE.
 

Attachments

  • IMG_4988.jpeg
    IMG_4988.jpeg
    3.2 MB · Views: 419
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,571
Location
Lancashire
As there isn’t any insulator where it’s terminated onto the structure I must be isolated and earthed
 

357

Established Member
Joined
12 Nov 2018
Messages
2,282
Doesn't look like it's live to me.

Incidentally it's quite common all over the place to see overhead wires there for crossovers and tracks that have long been removed. Even after a full replacement!
 

L401CJF

Established Member
Joined
16 Oct 2019
Messages
1,486
Location
Wirral
Not strictly the same but related! I'm sure the OLE is still in situ at Crewe through the original disused platform 1 over the "temporary" walkway to the replacement bus stop at the Horse Landings. If I remember rightly it is surrounded by some sort of insulating cover.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,963
Noticed this morning that OHLE runs over the end of Platforms 4/5 at Bletchley from when this was a track into the depot (now removed to allow a 12-car extension).

Any reason why it wouldn't simply have been removed when the track it served was lifted?
One possibility: the portal at which it ends is supported by a substantial double column stanchion with diagonal bracing (see the shadow), presumably to resist the out-of-balance loading from the two terminating catenaries. Maybe the portals behind the camera are of lighter construction and would need to be replaced by a stronger version if the catenary runs were shortened.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,077
Location
West Wiltshire
When St Pancras was first electrified, had a cable spanning the station at the end over the bufferstops. But again live part was only over the tracks.

Got changed when it was de-electrified ahead of conversion for International use.

Usual reason for these dead sections is the need to continue the cable to a suitable anchor point on a post or gantry that is braced for side loadings. You cannot just stick a post up where cannot get foundations eg on a bridge.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,618
Location
Nottingham
I'm pretty sure there's a standard that says life components can't be put above platforms. So if a platform has long single track cantilevers, they will have insulators above the platform edge rather than in the usual position next to the mast.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,571
Location
Lancashire
Correct and someone cocked up on the Northwest electrification where they didn’t do exactly that at either Earlestown or Newton le Williws but I can’t remember which
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,196
When St Pancras was first electrified, had a cable spanning the station at the end over the bufferstops. But again live part was only over the tracks.

Got changed when it was de-electrified ahead of conversion for International use.

Usual reason for these dead sections is the need to continue the cable to a suitable anchor point on a post or gantry that is braced for side loadings. You cannot just stick a post up where cannot get foundations eg on a bridge.
I remember that. It was like a headspan wire over the concourse. I recall thinking it was an unobtrusive way of tensioning the wires and therefore sympathetic to the architecture.
 