Where exactly was the problem?

I am on the Northern stopper having had to get off the TfW, but haven't noticed any particular issue with this train doing any part of the line slower than it should.
Good explanation in post 21, above.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
Single line working now at Goostrey to Sandbach, everything using the down line (Manchester bound track).
 

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
It's is, much slower line speed though, and only 20 over the points. Ours lost about 9 mins, but caused the two trains waiting at Sandbach on the down to lose 15mins (AWC) and 10 (Northern).

== Doublepost prevention - post automatically merged: ==

Edit 2000hrs

The wires are now also down <:D
 
Last edited:

8stewartt

Member
Joined
18 Mar 2013
Messages
82
It's is, much slower line speed though, and only 20 over the points. Ours lost about 9 mins, but caused the two trains waiting at Sandbach on the down to lose 15mins (AWC) and 10 (Northern).
most the intermediate pointwork down there is 40, except the 50's at sandbach and wilmslow. 25 crossovers south end of Sandbach, but 1 crossover wont cause yo to lose 9 minutes. The bidi line speed is only 60 though vice 110, so this is where you will have lost some time.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,158
Location
Wilmslow
Both issues, the latter being a problem with the overhead power on the up between Holmes Chapel and Sandbach, appear fixed this morning, Wednesday.
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
5,198
Believe the block to fix it was done overnight with just the first couple of trains from Crewe to Shrewsbury having to be cancelled this morning as a result. At least its back up and running.
 