If so, is it a planned one, or an on-the-fly, get everything back to how it should be, one?
Mate, are "Greater Anglia" some sort of wet dream for you?
I've been on this poxy line for over 20 years. It doesn't matter who takes over - the line is a complete and utter joke of a service.
The point of the post was to say after all the noises of those Dutch clowns bleating on about customer service and communication. First major day live (Monday) and it was the usual pathetic organized chaos. Trains not turning up, other trains delayed, no communication, no information.
This line is a complete disgrace and will continue in the same vein like it has done for the last 25 years.
National Rail own the track mate. The whole set up cannot possibly work under the current status. The "franchise" leases everything off those cowboys, who I might add are supposed to be a non-profit making organization. Amazing how these lumpy bonuses appear for the bosses eh? (Even if they do claim to have "waived" them).
Cheers for the quick response! I did wonder. I obviously don't sepdn all day every day staring out the window, so couldn't be sure.
Mate, are "Greater Anglia" some sort of wet dream for you?
I've been on this poxy line for over 20 years. It doesn't matter who takes over - the line is a complete and utter joke of a service. .
More overcrowding, reduced formations and cutting back any contingency that was left by Anglian accounts.What do Dutch Clowns specialise in, by the way??
In 4 months when things have bedded in there will be improvements. After the chaos that will be the olympics, things will have settled down further and then you can judge greater anglia, on there promises. If it is still bad then, then your current point stands but until then you cant really judge because they havent had time.
So why rant about the Dutch Clowns in particular? Did you expect them to rectify 20, as you say, years of mismanagement and whatever in a day or two?
What do Dutch Clowns specialise in, by the way? Do they do funny things with Edam?
Having sampled a whole week I'd strongly debate that they are doing well under the circumstances. Short formations into double figures everyday so far up to today. That's poor, and it's self inflicted to some extent. Giving out duff information to passengers, that's nothing new, but is avoidable.
More overcrowding, reduced formations and cutting back any contingency that was left by Anglian accounts.
--- old post above --- --- new post below ---
How does the Olympic timetable work with units that are diagrammed out in service for the duration sitting around off-lease?
and I have just been whispered that despite the Dft including a funded "refresh" for the disgusting interiors of the ex 321/4s.............Abelio have gone in and said it doesnt need to be done.....therefore saving the Dft more cash and inflicting more lisery upon long suffering customers.......
watch this space if this one is true!
While others are quick to criticise, I fear you might be equally quick to heap praise.
That could simply be because you had a different driver this morning. Some drivers are more customer-focused than others and will make more PA announcements. I certainly have had no new instructions with regard to use of the PA, especially in times of disruption, since the advent of the "one minute announcement" introduced by, um, NXEA.
Sounds like bollox. If the DfT specified a refresh then you HAVE to include it in your main bid. And there would be zero point in changing it as an option.
Really, people are noising off when they don't have an effing clue.
If abelio have come into the dft during the bid and said.....we think we cam save money by postponign the until the proper franchise......then I wouldn't put I'd past those wonderful people at daft to accept it......
BR electrified to Norwich on-the-cheap using the flimsiest OH structures that were still legal. Nobody since then has ever done the major re-engineering work required. I am mildly hopeful of the latest NR announcement of OH replacement. Until then, I give the new franchisee a bit of slack to try and get things in order a bit more. Those of us with long memories will know it used to be even worse - superannuated class 101's catching fire at Beccles in late BR days - no info, no apology, no way home.
Not allowed. If you don't meet the specifications laid down by the DfT, your bid is thrown out. Simple as. No negotiation.
Therefore there must've been no refresh specified. So it's the DfT's fault for not specifying one.
The aren't many instances of the OLE coming down on the northern part of the GEML so the overheads cant be that bad.
I truely hope they havent! this is the one small chink of light in this tax raising cynical exercise.
Abellio have confirmed (somewhere or other) that their doing that work (which is unsurprising seeing as it's a requirement of the franchise specification) so don't worry about it it's going to happen at some juncture.
where? they are telling everyone who asks that there will be NO refurbs!
BR electrified to Norwich on-the-cheap using the flimsiest OH structures that were still legal. Nobody since then has ever done the major re-engineering work required. I am mildly hopeful of the latest NR announcement of OH replacement. Until then, I give the new franchisee a bit of slack to try and get things in order a bit more. Those of us with long memories will know it used to be even worse - superannuated class 101's catching fire at Beccles in late BR days - no info, no apology, no way home.
One of the first press releases after they won the franchise it stated that they were going to do that work on the 321s.
Only because there is relatively less traffic north of Ipswich. Compare the OH with even that on the wcml and you'll notice.
Sounds sensible, specifying the overhead line for the amount of traffic it would get.
One of the first press releases after they won the franchise it stated that they were going to do that work on the 321s.