Northern Weekend Trains between Clitheroe and Hellifield

Status
Not open for further replies.

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,204
How often has the Clitheroe- Hellifield SuO service run / not run (when it should/might have) in 2021 to date? :?:
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,945
Location
Airedale
Wasn't there some services in a pre Covid world which terminated at Hellifield on a Sunday during the winter months?
Yes, for several years, returning to Preston, so giving the line 2tpw(!). Resumes 19/9 this year.
 

Roger B

Established Member
Joined
16 Jun 2018
Messages
1,268
Location
Gatley
Advance info the Dalesrail is again cancelled Sunday 11/7/21 as i assume the same reason as last week.
Thanks Hardcastle. Has this been announced by Northern - it would be great if you could provide a link to the source, please. I was intending to take it to Carlisle this Sunday. I see it's still showing un RTT - whereas last Sunday's didn't show at all in RTT.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,755
Location
West of Andover
Thanks Hardcastle. Has this been announced by Northern - it would be great if you could provide a link to the source, please. I was intending to take it to Carlisle this Sunday. I see it's still showing un RTT - whereas last Sunday's didn't show at all in RTT.

Details in the below link:
 

Roger B

Established Member
Joined
16 Jun 2018
Messages
1,268
Location
Gatley

HSP 2

Member
Joined
4 Dec 2019
Messages
641
Location
11B
There's no signalled move back into the Up platform from either the Up Main or the Up Branch (it'd require the driver to change ends three times in total if it was a legitimate shunt, but that's not necessarily a problem in itself).
As above, there's no signalled move back into the Up platform.

As all of the movements would be in station limits and it's not a passenger train (ECS) it can (or could be) flagged back onto the up platform by the signalman. I've just seen a very bad photo of the Hellifield signal box diagram and it looks to show a double shunting peg that would control this move.
p817524523-3.jpg (580×236) (ontrackimages.org.uk)
 

Llandudno

Established Member
Joined
25 Dec 2014
Messages
2,743
Location
Matlock
Should the DalesRail be scrapped altogether if Northern are incapable of resourcing it. Northern would be better concentrating on trying to run a full service on their 7 day a week routes.

I wonder if any open access/charter operators would be interested in operating the Dales Rail service, if the current Dales Rail service is subsidised could this subsidy not be offered to a different operator?
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
As all of the movements would be in station limits and it's not a passenger train (ECS) it can (or could be) flagged back onto the up platform by the signalman. I've just seen a very bad photo of the Hellifield signal box diagram and it looks to show a double shunting peg that would control this move.
p817524523-3.jpg (580×236) (ontrackimages.org.uk)
The signalman couldn't be certain that the points were fitting up correctly if they're mechanical points with mechanical detection. The pair of dollies presumably both read across to the Down side, one to the Main and the other to the Goods.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,204
I keep a check on the Dalesrail every Sunday it ran May 16th 23rd & June 6th last week 13th June it was cancelled as you say May 30th it ran only part of the route due to engineering work. I did note that the Dalesbus twitter feed anounced on Saturday that it was not running the following day ie the 13th so my advise is to keep a eye on there if you have twitter.

How often has the Clitheroe- Hellifield SuO service run / not run (when it should/might have) in 2021 to date? :?:

See post #2

Thanks. Noted that @Hardcastle 's helpful post #2 was dated 16th June 2021, so just to summarise this info, and others' subsequently, is this what's happened so far this year...

Nothing scheduled before Sunday 16th May 2021, then the 0950 ran between Clitheroe and Hellifield (and onward to Carlisle presumably) on 16th May = Yes, on 23rd May = Yes, on 30th May = Partway (to where?), on 6th June = Yes, on 13th June = Cancelled (a later bus replacement ran, partway, presumably just between Clitheroe and Hellifield), on 20th June = ???, on 27th June = ???, on 4th July = Cancelled and on 11th July (tomorrow) = Cancelled?

Is that understanding correct?
 
Last edited:

Andy Pacer

Established Member
Joined
11 Jul 2017
Messages
3,503
Location
Leicestershire
Thanks. Noted that @Hardcastle 's helpful post #2 was dated 16th June 2021, so just to summarise this info, and others' subsequently, is this what's happened so far this year...

Nothing scheduled before Sunday 16th May 2021, then the 0950 ran between Clitheroe and Hellifield (and onward to Carlisle presumably) on 16th May = Yes, on 23rd May = Yes, on 30th May = Partway (to where?), on 6th June = Yes, on 13th June = Cancelled (a later bus replacement ran, partway, presumably just between Clitheroe and Hellifield), on 20th June = ???, on 27th June = ???, on 4th July = Cancelled and on 11th July (tomorrow) = Cancelled?

Is that understanding correct?
I was a bit disappointed at tomorrow's being cancelled as my All Line Rover itinerary did tie it in. Never mind.
 

HSP 2

Member
Joined
4 Dec 2019
Messages
641
Location
11B
The signalman couldn't be certain that the points were fitting up correctly if they're mechanical points with mechanical detection. The pair of dollies presumably both read across to the Down side, one to the Main and the other to the Goods.
looking at the diagram I can not see a direct connection from the up main to the down goods loop. Back to the down main yes as I would expect. So the second would be for the up platform.
Without going to deep in to S and T work, if a point is controlled by a signal box but does not have a FPL it will have what is called a detector fixed at the end of the tye bar (I have forgot its true name) that the link to the signal has to pass through, if the point is between 1/8" and 3/16" open the signal can not be pulled off so the point has to be reset to reseat it to the road that is required.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
looking at the diagram I can not see a direct connection from the up main to the down goods loop. Back to the down main yes as I would expect. So the second would be for the up platform.
Without going to deep in to S and T work, if a point is controlled by a signal box but does not have a FPL it will have what is called a detector fixed at the end of the tye bar (I have forgot its true name) that the link to the signal has to pass through, if the point is between 1/8" and 3/16" open the signal can not be pulled off so the point has to be reset to reseat it to the road that is required.
I've quickly annotated a cropped copy of the photo that you linked to earlier to show the route to the Down Goods...

p817524523-3.jpg

Mechanical detection is all well and good but, of course, useless if there's no signal that can be cleared for the move!

(normally one detector slide attached to each switch tip, and another driven laterally by a crank in the rod that drives the FPL if there is one - you can have mechanical detection on points with FPLs!)
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,945
Location
Airedale
I've quickly annotated a cropped copy of the photo that you linked to earlier to show the route to the Down Goods...

View attachment 99528

Mechanical detection is all well and good but, of course, useless if there's no signal that can be cleared for the move!

(normally one detector slide attached to each switch tip, and another driven laterally by a crank in the rod that drives the FPL if there is one - you can have mechanical detection on points with FPLs!)
The signalman couldn't be certain that the points were fitting up correctly if they're mechanical points with mechanical detection. The pair of dollies presumably both read across to the Down side, one to the Main and the other to the Goods.
This image is rather clearer: https://scrca.foscl.org.uk/gallery/scrca-image-2311902012-07-20akhellifield-sj-sb-interior-panel-2

I see single disc 44 reading via points 28 Up Main to Down Main (or Loop?) and single disc 56 Up Branch via points 49 to Down Loop; 56 is also the subsidiary Down Branch to Down Loop, so the two signals are selected by points 49. (I presume disc 56 can't read Up Branch to Down Main therefore.)

(At one time one disc - on some economically-minded railways - could cover multiple routes, but I think that is no longer best practice, and hasn't been for decades!)
 

HSP 2

Member
Joined
4 Dec 2019
Messages
641
Location
11B
This image is rather clearer: https://scrca.foscl.org.uk/gallery/scrca-image-2311902012-07-20akhellifield-sj-sb-interior-panel-2

I see single disc 44 reading via points 28 Up Main to Down Main (or Loop?) and single disc 56 Up Branch via points 49 to Down Loop; 56 is also the subsidiary Down Branch to Down Loop, so the two signals are selected by points 49. (I presume disc 56 can't read Up Branch to Down Main therefore.)

(At one time one disc - on some economically-minded railways - could cover multiple routes, but I think that is no longer best practice, and hasn't been for decades!)
Thank for the clearer photo of the box diagram, I did think the signal 44 was a double due to the first photo. So for a ECS move to take place from the down platform to the up platform it would be under the signalmans control using flags for one part of it.
Must get out and see if I can have a word with the signalman next time I'm over that way.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,204
Nothing scheduled before Sunday 16th May 2021, then the 0950 ran between Clitheroe and Hellifield (and onward to Carlisle presumably) on 16th May = Yes, on 23rd May = Yes, on 30th May = Partway (to where?), on 6th June = Yes, on 13th June = Cancelled (a later bus replacement ran, partway, presumably just between Clitheroe and Hellifield), on 20th June = ???, on 27th June = ???, on 4th July = Cancelled and on 11th July (tomorrow) = Cancelled?

Dalesrail cancelled 8/8/21 no available drivers.

Can anyone fill in the gaps, also did anything run on Sundays 20th June / 27th June / 18th July / 25th July and 1st August?
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,204
Ballpark just over 50% reliability rate? Seven cancellations over past 15 Sundays if you input the relevant details into raildar!

(0950 SuO Clitheroe-> Hellifield)

 

Llandudno

Established Member
Joined
25 Dec 2014
Messages
2,743
Location
Matlock
Surely it would be better cancelling the whole thing until next summer.

It’s not fair on CUSTOMERS planning days out, group walks and the like to have the route cancelled at such short notice 50% of the time.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,033
Location
West Yorkshire/Tuscany
Surely it would be better cancelling the whole thing until next summer.
I think that there could be legal consequences of a planned withdrawal of the service for a period of several months. As this is the only passenger service currently using the Clitheroe-Hellifield section it constitutes a weekly 'parliamentary' service....much like the Fridays Only Stockport-Stalybridge train. I suspect that a planned withdrawal for a period of more than a week would have to be accompanied by a formal parliamentary proposal for the permanent withdrawal of passenger services. Perhaps someone with a better knowledge of the relevant statutary procedures could confirm or deny?

EDIT: I may, of course, be writing complete b*****ks as the service doesn't run in the winter months anyway, but I would be interested to know what the legal stipulations are for the minimum level and periodicity of services over a passenger line.
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,613
EDIT: I may, of course, be writing complete b*****ks as the service doesn't run in the winter months anyway, but I would be interested to know what the legal stipulations are for the minimum level and periodicity of services over a passenger line.

In the winter it runs, but only as far as Hellifield.
 

Sm5

Member
Joined
21 Oct 2016
Messages
1,013
Pity LSL with its HST isnt available on Sundays to do it.

(Edit: it is now available on sundays as it’s own sunday turn has been cancelled)…. Solution ?
 

Roger B

Established Member
Joined
16 Jun 2018
Messages
1,268
Location
Gatley
Dalesrail is expected to operate. 22/08/21.
Thanks Hardcastle. Great that it's running. Pity that I've other commitments on Sunday! Maybe next time ....

== Doublepost prevention - post automatically merged: ==

I've just seen the following in the latest issue of the Branch Line Society's latest newsletter (BLN 1383): The Strategic Outline Business Case (SOBC) to extend the Manchester to Clitheroe service to Hellifield or Garsdale concludes that services could be delivered with little or no additional infrastructure and could potentially start at the May 2023 timetable change. Does anyone have any further info concerning this? Thanks
 
Last edited: