• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Northern timetable plan for May 2018

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
How come? I thought there would be plenty of 385s operating from March onwards? Not to mention the HSTs.

The Scotrail rolling stock changes are primarily to add better and more carriages to services in Scotland. Releasing units will only start when they have significantly more carriages in revenue earning service, allowing for potential teething problems with new/different trains.
 

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,593
If there is a big increase in demand once electric services start, how many tph could the Manchester Victoria-Preston corridor theoretically support with the current infrastructure?
 

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
If there is a big increase in demand once electric services start, how many tph could the Manchester Victoria-Preston corridor theoretically support with the current infrastructure?

The old Manchester - Bolton - Preston infrastructure used to support up to 5tph in the late 00's (2x Blackpool North, 1x Cumbria, 1x Scotland and 1x Preston). It has never been clarified what the improved infrastrucure unlocks in terms of spare paths, but one could assume there is still at least one path per hour unused.
 
Last edited:

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
With Bolton to Manchester it would make more sense to go for longer trains than more trains given there's already a very high frequency and very few services run as more than 4 cars, when the infrastructure supports 6 x 23m.
 

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
2,174
Location
West Yorkshire / Birmingham
With Bolton to Manchester it would make more sense to go for longer trains than more trains given there's already a very high frequency and very few services run as more than 4 cars, when the infrastructure supports 6 x 23m.
The flex's will be 4 car, the Manchester Victoria to Preston will be a 319 and there will be a couple of 6 car 331's. The only 2 car trains that will remain will be the half-hourly Blackburn/Clitheroe trains. In all it is looking pretty good for Bolton!
 

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
2,174
Location
West Yorkshire / Birmingham

SeanM1997

Member
Joined
2 Feb 2016
Messages
570
Can anyone clarify the Crewe services, and whether late night/Sunday services will operate from Crewe to Manchester Airport, Manchester Piccadilly or beyond. Its one of the main things needed to improve Crewe's rail links. Also, will Styal be served by every train to Crewe and Manchester Airport?
 

scrapy

Established Member
Joined
15 Dec 2008
Messages
2,304
Can anyone clarify the Crewe services, and whether late night/Sunday services will operate from Crewe to Manchester Airport, Manchester Piccadilly or beyond. Its one of the main things needed to improve Crewe's rail links. Also, will Styal be served by every train to Crewe and Manchester Airport?
All provisional but

Monday to Saturday daytime will see
1 tph Man Picc to Crewe via Stockport all stops except Heaton Chapel and Levenshulme.
1tph Wigan NW/Southport to Alderley Edge via Bolton and Stockport all stops between Manchester and Alderley except Heaton Chapel and Levenshulme.
1tph Liverpool to Crewe via Chat Moss and Styal. All stops except Chelford and Goostrey.

Evenings and Sundays
1tph Man Picc to Crewe via Stockport all stops except HTC and LVM.
1tph Liverpool to Wilmslow via Chat Moss and Styal.

All trains via Styal call at Manchester Airport and Styal.

The only real benefit for Crewe is an increase to an hourly stopping Sunday service to Manchester via Stockport from the currently 2 hourly service.
 

50032

Member
Joined
3 Mar 2016
Messages
163
All provisional but

Monday to Saturday daytime will see
1 tph Man Picc to Crewe via Stockport all stops except Heaton Chapel and Levenshulme.
1tph Liverpool to Crewe via Chat Moss and Styal. All stops except Chelford and Goostrey.
I suspect the unit diagrams will inter-work on these (as they do now), to save one service have a long dwell time at Crewe. They'll be a mixture of 319 / 323 from May.
 

Philip

On Moderation
Joined
27 May 2007
Messages
3,734
Location
Manchester
I suspect the unit diagrams will inter-work on these (as they do now), to save one service have a long dwell time at Crewe. They'll be a mixture of 319 / 323 from May.

Are 323s cleared or going to be cleared to run to Liverpool? I'd have thought this would need to be so if interworking is going to happen?
 

SeanM1997

Member
Joined
2 Feb 2016
Messages
570
All provisional but

Monday to Saturday daytime will see
1 tph Man Picc to Crewe via Stockport all stops except Heaton Chapel and Levenshulme.
1tph Wigan NW/Southport to Alderley Edge via Bolton and Stockport all stops between Manchester and Alderley except Heaton Chapel and Levenshulme.
1tph Liverpool to Crewe via Chat Moss and Styal. All stops except Chelford and Goostrey.

Evenings and Sundays
1tph Man Picc to Crewe via Stockport all stops except HTC and LVM.
1tph Liverpool to Wilmslow via Chat Moss and Styal.

All trains via Styal call at Manchester Airport and Styal.

The only real benefit for Crewe is an increase to an hourly stopping Sunday service to Manchester via Stockport from the currently 2 hourly service.

Its a shame evenings and Sunday services from Liverpool won't be coming to Crewe. Access to Manchester Airport from the south is poor, and this could have addressed this issue. I think this something Cheshire East and Manchester Airport should lobby for.
 

scrapy

Established Member
Joined
15 Dec 2008
Messages
2,304
Are 323s cleared or going to be cleared to run to Liverpool? I'd have thought this would need to be so if interworking is going to happen?
323 workings to Liverpool unlikely anyhow. All Crewe services expected to be 319s.
 

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,379
Location
Calder Valley
Are 323s cleared or going to be cleared to run to Liverpool? I'd have thought this would need to be so if interworking is going to happen?
323s certainly were cleared for Liverpool, they have worked they Liverpool to Birmingham New Street services under Central Trains, and I believe had done the same service under London Midland.
Sam
 

pt_mad

Established Member
Joined
26 Sep 2011
Messages
2,960
The Crewe to Liverpool via Manchester airport service. Can anyone confirm is this for certain now and will definitely run May?

And what will the stopping pattern be?

Is there a rough journey time available end to end? And will there be a late last working Liverpool bound?

And will it be class 323s?
 

50032

Member
Joined
3 Mar 2016
Messages
163
The Crewe to Liverpool via Manchester airport service. Can anyone confirm is this for certain now and will definitely run May?

And what will the stopping pattern be?

Is there a rough journey time available end to end? And will there be a late last working Liverpool bound?

And will it be class 323s?
From the draft consultation:
Liverpool - Crewe via Airport:
LIV xx29, MCO xx25, MAN xx30, MIA xx05, CRE xx42
CRE xx18, MIA xx59, MAN xx22, MCO xx26, LIV xx24

Picc - Crewe via Stockport:
MAN xx01, CRE xx59
CRE xx48, MAN xx39

By looking at the Crewe arrival and departure timings, it's easy to presume that the via Airport and via Stockport services will interwork as they currently do (i.e. outward one way / return the other). Highly unlikely for two Northern services to both be sat at Crewe at the same time.
 

darloscott

Member
Joined
12 Dec 2013
Messages
915
Location
Stockton
If you kept them separate you'd need 5 units to work Liverpool-Crewe & return and 3 units to work Manchester-Crewe & return however interworking the two gets this down to just 7 required in total.
 

scrapy

Established Member
Joined
15 Dec 2008
Messages
2,304
The Crewe to Liverpool via Manchester airport service. Can anyone confirm is this for certain now and will definitely run May?

And what will the stopping pattern be?

Is there a rough journey time available end to end? And will there be a late last working Liverpool bound?

And will it be class 323s?
1) nothing's ever definite on the railway. Whilst this routes fully electric, further delays on electrification or stock cascades may mean a further delay to new timetable implementation.
2)all stops except Chelford and Goostrey
3)2hrs 5mins to 2 hrs 10min
4)Last trains to Lime St 18.18 from Crewe and 22.43 from Wilmslow (services start from Wilmslow in an evening).
5) no they'll be 319's
 

scrapy

Established Member
Joined
15 Dec 2008
Messages
2,304
Won’t be 323’s on the route (Lime St-Crewe) Lime St/Wigan/Man Vic crew don’t sign them.
There will be plenty of changes to the traction and routes signed by different depots anyhow so this wouldn't be a great barrier. It's likely at least some of Blackpool, Buxton, Wigan or Man Vic crews will need to sign them as they'll probably be operating Blackpool to Macclesfield.
 

Philip

On Moderation
Joined
27 May 2007
Messages
3,734
Location
Manchester
Is it definite then that 319s will replace 323s on all Crewe services? I thought Northern didn't want to do this because of the inferior acceleration of 319s compared to 323s?

I'm a bit surprised too to read that some of these 323s leaving the Crewe line might transfer to Blackpool to Macclesfield services.
 

mwmbwls

Member
Joined
14 Dec 2009
Messages
682
Is it definite then that 319s will replace 323s on all Crewe services? I thought Northern didn't want to do this because of the inferior acceleration of 319s compared to 323s?

I'm a bit surprised too to read that some of these 323s leaving the Crewe line might transfer to Blackpool to Macclesfield services.

Is this a revival of the earlier suggestion of a 2x323 PIXC-buster capability to relieve peak hour pressure in Piccadilly - Chorley corridor?
 

50032

Member
Joined
3 Mar 2016
Messages
163
Is it definite then that 319s will replace 323s on all Crewe services? I thought Northern didn't want to do this because of the inferior acceleration of 319s compared to 323s?

I'm a bit surprised too to read that some of these 323s leaving the Crewe line might transfer to Blackpool to Macclesfield services.
I have it on good authority that you'll see 323s spreading their wings to Preston, Blackpool and Liverpool from May.

You'll see 319s inter-mingled on Crewe and Hadfield services.

Stoke will remain solely 323.

All of this of course hinges on completion of electrification and success of the flex project...
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
6,067
All of this of course hinges on completion of electrification and success of the flex project...

I remain optimistic but Manchester to Bolton is making VERY slow progress as per a run up to Horwich Parkway this afternoon !
 

Ian Brown

Member
Joined
30 Dec 2017
Messages
11
Have just joined so please forgive me if the situation has changed in respect of the May 2018 Buxton Line timetable. From the posts I gather that the intention is to withdraw the Disley stop in off peak Buxton trains, making this trip impossible after 150 years except by bus of a 30 minute wait at New Mills. The quoted reason is a faster journey time to Buxton, although this reads as not credible with stops at Heaton Chapel,mLevenshukme, Davenport and Woodsmore in one direction? Surely not correct. Commentary on this is sparse so is this a case of putting this line on the graph last. Hoping I have got this wrong?
 

scrapy

Established Member
Joined
15 Dec 2008
Messages
2,304
Y
Have just joined so please forgive me if the situation has changed in respect of the May 2018 Buxton Line timetable. From the posts I gather that the intention is to withdraw the Disley stop in off peak Buxton trains, making this trip impossible after 150 years except by bus of a 30 minute wait at New Mills. The quoted reason is a faster journey time to Buxton, although this reads as not credible with stops at Heaton Chapel,mLevenshukme, Davenport and Woodsmore in one direction? Surely not correct. Commentary on this is sparse so is this a case of putting this line on the graph last. Hoping I have got this wrong?
U had it correct for the provisional timetables however it is likely to be altered as the provisional timetable didn't have the 4tph to Hazel Grove required in the franchise spec and 2tph to Buxton rather than a New Mills Newtown terminator is also being looked at.
 
Status
Not open for further replies.

Top