• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Northern Tender for up to 450 units

Status
Not open for further replies.

Davester50

Member
Joined
22 Feb 2021
Messages
1,067
Location
UK
Indeed this will presumably become the default train across the country for all operators looking to replace DMUs, in the way the Turbostar became the "default" DMU after privatisation for most operators, so an order well worth winning.
I would think that's a good thing too. Standardisation rather than producing oddball types is the future, albeit boring.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Danfilm007

Member
Joined
5 Jul 2015
Messages
330
I would think that's a good thing too. Standardisation rather than producing oddball types is the future, albeit boring.
Happens every time though - the HSTs and Sprinters were boring when introduced as it reduced fleet types to a degree!
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,832
Location
"Marston Vale mafia"
I would think that's a good thing too. Standardisation rather than producing oddball types is the future, albeit boring.

Agreed. The post privatisation TOCs that ordered 175s (less reliable) and 185s (super thirsty and expensive) probably regret not just getting more 170s, and there'd have been a flexibility of redeployment gain.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,188
The frequent stops would mean faster acceleration could by offset by a lower top speed.
No, because we're talking about short range batteries here and all of the energy is going to be used just to get up the gradients, faster acceleration will use up too much energy to do a return trip e.g. HG to Buxton/Bolton to Clitheroe, off the wires, with a short range battery.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,947
Location
Mold, Clwyd
Indeed this will presumably become the default train across the country for all operators looking to replace DMUs, in the way the Turbostar became the "default" DMU after privatisation for most operators, so an order well worth winning.
The railway has proved incapable of sticking with a standard design, partly because technology is moving so fast, and partly because getting railway operators to agree on requirements and a fixed design is low - just look at TPE's last procurement.
There is as yet no standard decarbonisation design, and the bids against this tender are unlikely to be the last word.
I suspect we will get a limited order initially, and then change our minds on how that design should evolve.
Standardisation is also the opposite of competition, and DfT won't want to be locked into a high priced deal with a single manufacturer.
Even BR split its orders between manufacturers (eg the Networker fleet).

And we already have a diesel-battery hybrid solution - the TfW class 230 [takes cover...;)].
 

Davester50

Member
Joined
22 Feb 2021
Messages
1,067
Location
UK
Standardisation is also the opposite of competition, and DfT won't want to be locked into a high priced deal with a single manufacturer.
They can still be manufactured by different companies to a standard design, so compatibility is probably a better word.
Look how the 170s were backwards compatible with MetCam and BREL Sprinters.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
No, because we're talking about short range batteries here and all of the energy is going to be used just to get up the gradients, faster acceleration will use up too much energy to do a return trip e.g. HG to Buxton/Bolton to Clitheroe, off the wires, with a short range battery.

Why are we talking about short range batteries?

The Japanese are introducing battery trains on the Oga Line. I've never seen it in person but the non-electrified section is longer than Hazel Grove to Buxton. It's 26.4km from end to end. There's overheads at the Oiwake only (where the branch joins the mainline) and a recharging point at the last station. It doesn't exactly look like a flat line: https://en.wikipedia.org/wiki/Oga_Line#/media/File:Oga-Line-EV-E801-G1.jpg

In Latvia they're introducing BEMUs on Rīga to Sigulda - a line around 60% longer than Manchester to Buxton.

Are there cave men working at Buxton who wouldn't be able to comprehend how to use modern technology?
 
Last edited:

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,530
Location
Yorkshire
Just a gentle reminder that this thread is for actual developments; any suggestions, proposals, predictions or anything else of a speculative nature belongs in the relevant forum section please. Thanks :)
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,839
Location
SW London
Agreed. The post privatisation TOCs that ordered 175s (less reliable) and 185s (super thirsty and expensive) probably regret not just getting more 170s, and there'd have been a flexibility of redeployment gain.
It was only First Group that ordered them (FGW and FNW).
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,832
Location
"Marston Vale mafia"
It was only First Group that ordered them (FGW and FNW).

Indeed it was only FirstGroup that deviated from the norm - the 185s were them, too. And now it's only FirstGroup that are fiddling with 230s which really should go for scrap (on any scale, there are for now also the TfW ones, but I bet they won't last).

Does that tell anyone anything? :)
 

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,634
Location
wales
This tender sounds dangerously sensible.

Wouldn't 450 units be essentially the entire Northern fleet?

It appears to be the Irish 22000 solution, which I heartily approve of.

EDIT:

it's a hundred units more than the entire Northern Rail fleet, so I suppose it could be some sort of neo-IEP project? 450 units comprising multiple carriages is a lot.
Who knows could be involving gwr at that volume.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,660
Location
Greater Manchester
As I said I think it could be a "replace all 15x in England" project managed by Northern in the absence of GBR.
With 306 English Sprinters (everything but ScotRail and TfWs), the numbers do fit, and with space to add on more units for odd fleets like Northern's 170s which EMR would probably want.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,832
Location
"Marston Vale mafia"
With 306 English Sprinters (everything but ScotRail and TfWs), the numbers do fit, and with space to add on more units for odd fleets like Northern's 170s which EMR would probably want.

And remember that because these new units will have a pantograph and a diesel engine (to start with), they'll be a minimum of 3-car units, my guess would be some 3s and some 4s. This being the case they'll offer more capacity than the present primarily 2-car fleet, which means Northern may see a reduction in the number of units but an increase in capacity nonetheless. Northern run hardly any single 2-car units these days, only on the branches, and there are enough 2.195s for those (that being the reason 2.195s were procured to start with).

The only EMU available in the UK at present that is basically equivalent to 2x24m with a pantograph is the 3-unit Class 755, and even that is a bit bigger.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,660
Location
Greater Manchester
And remember that because these new units will have a pantograph and a diesel engine (to start with), they'll be a minimum of 3-car units, my guess would be some 3s and some 4s. This being the case they'll offer more capacity than the present primarily 2-car fleet, which means Northern may see a reduction in the number of units but an increase in capacity nonetheless. Northern run hardly any single 2-car units these days, only on the branches, and there are enough 2.195s for those (that being the reason 2.195s were procured to start with).

The only EMU available in the UK at present that is basically equivalent to 2x24m with a pantograph is the 3-unit Class 755, and even that is a bit bigger.
Yep, the 450 feels like a massive number that assuming no 2 car option exists, is an absolutely massive amount.
450*3=1350 carriages, which is more than Northern has across all of its fleet, the 450 is a clearly massive upper limit, even if we only see 300 of the units built that'd still be a massive fleet that'd make it the largest active passenger class in the country (377 in 2nd with 239 units)
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,947
Location
Mold, Clwyd
Indeed it was only FirstGroup that deviated from the norm - the 185s were them, too. And now it's only FirstGroup that are fiddling with 230s which really should go for scrap (on any scale, there are for now also the TfW ones, but I bet they won't last).
Does that tell anyone anything? :)
Competition meant choosing between bids, and no doubt the Alstom/Siemens bids were "better" that Adtranz or whatever they were at the time.
Derby made no secret of wanting large EMU orders and didn't bother bidding for DMUs after a while.
They still don't have a recent track record for a DMU/battery platform, unless it is to come from the new Alstom European stable.
Just mandating "more Turbostars please" was not a viable strategy, and wouldn't have kept Derby open.

The 185s came about when SWT turned its back on (old) Alstom and went with the Desiro, which went on to gain a good market share and reputation for quality.
A generation on, is the railway as keen on Aventra after the experiences with several TOCs, having placed large orders with Derby?
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Indeed it was only FirstGroup that deviated from the norm - the 185s were them, too.
The 175/180s were North Western Trains' ordering, later rejigged by First Group as the 180s got moved.
And now it's only FirstGroup that are fiddling with 230s which really should go for scrap (on any scale, there are for now also the TfW ones, but I bet they won't last).
Kind of, the DfT will be interested in the fast charge technology and have bought it through GWR.
 

cnjb8

Established Member
Joined
26 Feb 2019
Messages
2,304
Location
Nottingham
With 306 English Sprinters (everything but ScotRail and TfWs), the numbers do fit, and with space to add on more units for odd fleets like Northern's 170s which EMR would probably want.
Wouldn't it better to replace the Networkers rather than 170s that have settled well with Northern? Besides, if this new order replaces EMRs 158s then there is no need for any extra 170s at EMR
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,894
Location
South Wales
Competition meant choosing between bids, and no doubt the Alstom/Siemens bids were "better" that Adtranz or whatever they were at the time.
Derby made no secret of wanting large EMU orders and didn't bother bidding for DMUs after a while.
They still don't have a recent track record for a DMU/battery platform, unless it is to come from the new Alstom European stable.
Just mandating "more Turbostars please" was not a viable strategy, and wouldn't have kept Derby open.

The 185s came about when SWT turned its back on (old) Alstom and went with the Desiro, which went on to gain a good market share and reputation for quality.
A generation on, is the railway as keen on Aventra after the experiences with several TOCs, having placed large orders with Derby?
Don't forget the aventra was originally a bombardier product hopefully Alstom are able to sort out aby further issues
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,660
Location
Greater Manchester
Wouldn't it better to replace the Networkers
It's a big order and on one draft of that post GWR's (Chiltern seem to be doing their own thing) Networkers were in fact an example.
170s that have settled well with Northern?
It just feels like weird thing to keep around when standardising to 2 diesel classes (whatever this 7xx is and the 195s) would probably work better.
Besides, if this new order replaces EMRs 158s then there is no need for any extra 170s at EMR
This order as a whole may lead to some shuffling of units around, we'll just have to see.
 

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,219
Location
All around the network
Northern run hardly any single 2-car units these days, only on the branches, and there are enough 2.195s for those (that being the reason 2.195s were procured to start with).
? They run them on the Nottingham Leeds every hour and aren't uncommon on Calder Valley diagrams either
Agreed. The post privatisation TOCs that ordered 175s (less reliable) and 185s (super thirsty and expensive) probably regret not just getting more 170s, and there'd have been a flexibility of redeployment gain.
TOCs each had their own specific requirements, e.g. TPE wanting more powerful engines for the Manchester - Sheffield/Huddersfield routes and FNW intercity style doors at end cars rather than 1/2 2/3 doors as with the 170s. In this OLR/DfT led era we will probably see more of a compromise in return for standardisation. That way not only maintanance and driver training costs fall but drivers traction cards are simpler so easier for them to move around as well.

As an enthusiast I will miss the privitisation era with a large variety of rolling stock about including old BR stuff but times are changing.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,947
Location
Mold, Clwyd
It's a big order and on one draft of that post GWR's (Chiltern seem to be doing their own thing) Networkers were in fact an example.
It isn't a "big order", it's for a framework agreement covering a series of separate contracts potentially totalling 450 units.
It's very unlikely anyone will commit to nearly 1000 vehicles, either the TOC or the manufacturer, because of the risks involved over a longish timespan.
There's no train design yet, anyway, just a set of operator requirements.
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
Northern run hardly any single 2-car units these days, only on the branches, and there are enough 2.195s for those (that being the reason 2.195s were procured to start with).

Pay a visit to many places on the Northern network and you sill see 150s, 155s, 156s, 158s and 195s all operating as single 2-car services frequently on many routes including the busy commuter times.
 

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,306
Location
South West London

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,648
Location
Rochdale
One of the reasons trains start with 4 and half the day get split is all the trains are on different maintenance schedules and miles, which obviously wouldn't be a problem if the entire train was 4 cars as standard in the first place which they definitely need to be in most places now especially round the major cities
 

Jozhua

Established Member
Joined
6 Jan 2019
Messages
1,891
This seems kind of unexpected, but I guess the sheer age of the 15X units will force their hands at some point...

Whilst the 195s were a welcome refresh, they didn't even have enough capacity for today, nevermind a 'growing' railway. 331 order seemed actually adequate, which was unexpected!

Guessing we can expect a fair few more Northern services to go electric over the next 10 years, with electrification of Manchester-Leeds and Leeds - York, with Stalybridge coming online earlier for Manc commuter services.

The challenge I see really is that this fleet will need to last 30yrs, well past 2050, so will have to be compatible with complete traction decarbonisation :o - that's gonna make the DFT squirm!
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,902
The challenge I see really is that this fleet will need to last 30yrs, well past 2050, so will have to be compatible with complete traction decarbonisation :o
Have you read the OP? That's exactly what is specified.
 

Tynwald

Member
Joined
18 Mar 2016
Messages
196
175 & 180 were the coradia units got built. There should have been a fleet of 3car 180s, for FNW To operate London sevices. FNW lost the paths down the WCML. Three other companies were seriusly looking at fleets of coradias.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,737
Location
West Riding
And remember that because these new units will have a pantograph and a diesel engine (to start with), they'll be a minimum of 3-car units, my guess would be some 3s and some 4s. This being the case they'll offer more capacity than the present primarily 2-car fleet, which means Northern may see a reduction in the number of units but an increase in capacity nonetheless. Northern run hardly any single 2-car units these days, only on the branches, and there are enough 2.195s for those (that being the reason 2.195s were procured to start with).

The only EMU available in the UK at present that is basically equivalent to 2x24m with a pantograph is the 3-unit Class 755, and even that is a bit bigger.
That might be true in the North West, but on the East side that's far from true.
 
Status
Not open for further replies.

Top