Is it just on this forum that talk of this 1/2 hourly service appears or is this from an official railway source? I ask the question as I have never seen anything outside this forum about it.

Network Rail RUS and TfGM are usually quoted, neither of which decides services at Warrington.
There is also the prospect of Virgin using this route for the odd Liverpool-Euston service and weekend diversions (particularly with the upcoming upgrade of the Runcorn route).
No VT stops are possible before Warrington BQ - platforms are not long enough.
Currently peak NT services run direct to Victoria, so it is an odd setup with just an off-peak service.
It saves a unit and gives it somewhere useful to go and reverse.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

21C101

Established Member
Joined
19 Jul 2014
Messages
2,559
Network Rail RUS and TfGM are usually quoted, neither of which decides services at Warrington.
There is also the prospect of Virgin using this route for the odd Liverpool-Euston service and weekend diversions (particularly with the upcoming upgrade of the Runcorn route).
No VT stops are possible before Warrington BQ - platforms are not long enough.
Currently peak NT services run direct to Victoria, so it is an odd setup with just an off-peak service.
It saves a unit and gives it somewhere useful to go and reverse.

What might make sense once the electrification is done is for Virgin is to run some off peak services from London to Carlisle/Glasgow via Liverpool (in via Runcorn and out via and calling at St Helens) and extend some London - Manchester pendo services to Blackpool via Bolton.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,391
Location
A typical commuter-belt part of north-west England
What might make sense once the electrification is done is for Virgin is to run some off peak services from London to Carlisle/Glasgow via Liverpool (in via Runcorn and out via and calling at St Helens) and extend some London - Manchester pendo services to Blackpool via Bolton.

Are there any spare paths for London to Manchester services along the viaduct from Manchester Piccadilly to Deansgate that will then enable onward progression to Bolton and Blackpool?

Will the Ordsall Chord project planned paths along the said viaduct, when actually running, take preference over such a proposal?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
What might make sense once the electrification is done is for Virgin is to run some off peak services from London to Carlisle/Glasgow via Liverpool (in via Runcorn and out via and calling at St Helens) and extend some London - Manchester pendo services to Blackpool via Bolton.

St Helens Central is too short for a Pendolino - 160m. A single Voyager would be OK.
Bolton would hold a Pendolino (P4 at 252m is a bit tight for an 11-car).
 

hairyhandedfool

Established Member
Joined
14 Apr 2008
Messages
8,837
edwin_m, you could run a parly over the curve, but I expect the stock for the Ellesmere Port service comes off Chester depot.

The morning shuttle apparently stables at Liverpool Lime Street overnight and runs empty from there to Warrington Bank Quay, then in service to Ellesmere Port. When it finishes the shuttle, it's last service is back to Warrington Bank Quay for an ECS to Wigan and onward service to Lime Street.

The afternoon run is a unit that does Manchester Piccadilly-Chester, then ECS to Helsby. It's last passenger shuttle takes it to Warrington Bank Quay where it then runs ECS to Lime Street for a stopping service to Manchester Oxford Road.

....Also anyone know if any have entered the paint shop? :)

Let me Google that for you.
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,830
Location
Nowhere Heath
I've not kept up-to-date lately, but have we got anywhere nearer to knowing when 319s will enter passenger service? I'm probably still coming up to Merseyside on 4th January anyway for a final chance to do some DMUs before the electrics start running, quite I should really be spending this time booking some Advances and hotels...
 

hairyhandedfool

Established Member
Joined
14 Apr 2008
Messages
8,837
I've not kept up-to-date lately, but have we got anywhere nearer to knowing when 319s will enter passenger service? I'm probably still coming up to Merseyside on 4th January anyway for a final chance to do some DMUs before the electrics start running, quite I should really be spending this time booking some Advances and hotels...

I hear from two sources that it will be sometime in February.
 

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
St Helens Central is too short for a Pendolino - 160m. A single Voyager would be OK.
Bolton would hold a Pendolino (P4 at 252m is a bit tight for an 11-car).

Would Virgin really be put off by Bolton's platforms? Haymarket cannot fit an 11 car 390 yet they call there every day. And as you say Bolton's Platforms 3 and 4 can be both fit single and double 221s and nine car 390s no problems.
 
Last edited:

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Don't think they were put off as their Bolton proposal was a 9 car Pendo alternating Blackpool/Bolton services.
 

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
Don't think they were put off as their Bolton proposal was a 9 car Pendo alternating Blackpool/Bolton services.

I fear we are gradually getting further off topic but this information is new to me and too good to ignore.

Why alternate Bolton and Blackpool? Surely both can be served simultaneously on one route (London -> Manchester -> Bolton -> Blackpool North)?
 
Last edited:

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Would be directly abstracting revenue from Northern/TPE if it called Manchester, Bolton, Blackpool. So arrive at Bolton via Manchester run out of service to Blackpool being cleaned and restocked and giving time for service recovery time if running late then start the return journey from Blackpool and vice versa.

P.S. Journey times wouldn't be competitive either, 30m Blackpool-Preston, 2:10m Preston-London, vs 1:15m Blackpool-Manchester, 2:10m Manchester-London. Direct via Manchester would be 3/4 an hour slower than changing.
 
Last edited:

Whistler40145

Established Member
Joined
30 Apr 2010
Messages
6,149
Location
Lancashire
IMHO if the track layout and signalling was modified at Bolton, then some Virgin services could be extended to Bolton from Manchester, the only problem is that a 11 coach Pendolino might not fit P13/14 at Piccadilly.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Bolton Council is also trying to persuade Virgin to start their first service of the day from Manchester from Bolton instead. Not currently asking for a return service to call from London at Bolton. Virgin probably still do have their own ideas about service extensions but electrification probably key.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,187
Location
Bolton
IMHO if the track layout and signalling was modified at Bolton, then some Virgin services could be extended to Bolton from Manchester, the only problem is that a 11 coach Pendolino might not fit P13/14 at Piccadilly.

They called there earlier this year, they do fit.
 

themiller

Established Member
Joined
4 Dec 2011
Messages
1,380
Location
Cumbria, UK
Is it the case that all Pendolino trains will eventually be 11 coach units?

Someone would have to make a business case for the extra vehicles bearing in mind that they'll have a restricted life in which to recoup the investment.
On a similar line, could a couple of the Lambrigg coaches not be repaired and inserted into a 9-car?
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,567
Location
Macclesfield
On a similar line, could a couple of the Lambrigg coaches not be repaired and inserted into a 9-car?
If the whole set was written off for insurance purposes it might be legally difficult to return certain vehicles to service.

If this was possible, and subject to the structural integrity of the vehicles being proven, in order to match the configuration of the other 11-car Pendolinos, one vehicle would have to be a trailer standard (with transformer) and the other a motor standard. Of the six vehicles out of "City of Glasgow" that survive, both pantograph cars are still extant (one at Virgin's Training Academy at Crewe) and one motor first, in store at Long Marston, would be available. The two vehicles at Moreton in Marsh fire training college might not be in much of a condition to be returned to service.

Probably far simpler and less costly not to bother for the sake of one, maybe two, extra lengthened units.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,608
Location
Nottingham
If the whole set was written off for insurance purposes it might be legally difficult to return certain vehicles to service.

They would be the property of the insurer but I don't think there would be any legal bar to them selling to someone else.

The insurer may however have decided that having some spare bodyshells is a good "insurance policy" to avoid having to write off another whole set if a Pendolino has an accident in future which only affects a coach or two. At the time of Lambrigg the Pendolino production line was expected to reopen (and did) for the extra coaches and some extra complete units, but it would be much more difficult to replace them today.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,903
Location
North
Would be directly abstracting revenue from Northern/TPE if it called Manchester, Bolton, Blackpool.

Is this a service for the benefit of the public or the TOCs? This is one of the many reasons for taking railways back into public ownership,
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
No, just common sense that if a service cannibalises existing demand without adding new demand then it reduces the viability of both services leading to a less efficient, more expensive to run railway. Hence the abstraction test is carried out on proposed new services to see if they would benefit or harm the railway.
 