At the risk of repeating myself, these nine trains are those coming from a wide range of different destinations. The undeniable fact is that the end parts of those journeys are only those from Piccadilly to Manchester Airport
Yes, nine trains an hour (with an average load of thirtysomething), six of which are non-stop from Piccadilly to the Airport, one of which only makes one stop.
Shall I remember this wasfefulness next time you complain about lack of spare DMUs for Todmorden?
Perhaps you would prefer all the York to Leeds services should be cut short at Cross Gates?
I don't know if you are trying to be clever there (?), but if we were running nine trains an hour from York to Leeds with an average of thirtysomething passengers (at a time when other routes are crying out for capacity) then I'd suggest that there were more efficient ways of using stock.
I've already said on this thread that the current practice of six relatively short trains from York to Leeds each hour on the Cross Gates route could be rationalised for longer trains running less often (e.g. a fifteen minute frequency would still be often enough to suit most passengers).
Perhaps National Express may well consider making coach replacement services for some of the rail services
National Express can sustain a route with an average load of thirtysomething (they have only one member of staff on board, they don't pay "track access charges", their coaches don't have a couple of hundred seats).
Heavy rail isn't the solution to every problem (despite what some on this Forum seem to think).
There is a very recent precedent for this in a regular rail service provision from a large city to Manchester Airport being withdrawn, that being the one from Newcastle on Tyne
I'm not aware of any significant drop in passenger numbers on the Newcastle - Manchester service, since it was diverted to Liverpool instead (?)
Other places have lost their direct links to Manchester Airport over the years (Nottingham, Derby, Hull, Sunderland, London), or significantly reduced (Windermere) some of the current links are fairly recent (e.g. Edinburgh and Glasgow used to have a direct link under BR, a link cut under Virgin, a link reinstated under TPE).
It's not the end of the world.
I think we came in on this as a way to release DMUs for use elsewhere. This proposal won't do that because (1) it only releases EMUs of which there is no shortage, and (2) it only releases them off-peak when units aren't needed anywhere else anyway. The only saving would be a bit of mileage cost, and if they had to go back to Neville Hill during the interpeaks this would cancel out much of the saving as well as probably exacerbating capacity problems through Leeds.
I was also talking about using the same number of seats on a route to provide a more efficient service, or generally looking at ways to reduce the "million pounds a day" of subsidy required.
Cutting the Bradford services at Keighley off-peak would free up a unit (with all of the staffing/ fuel costs that this entails) - the current provision north of Keighley is well above passenger demand.
Actually you should be bothered. An airport with more long haul destinations tends to attract people with more luggage. Many people flying with budget airlines tend to keep luggage to a minimum, whereas a long haul flight people have much higher allowances and hence more or bigger suitcases
Fact remains that Manchester Airport has roughly twice the number of services that Stansted does (despite Stansted attracting more rail passengers) - even if the suitcases at Manchester are bigger, that doesn't justify the status quo.
So you are still effectively running 5 trains an hour with one splitting further up the line. That's just fiddling around the edges and offers no benefit other than a slightly neater timetable
It'd be a more efficient timetable, it'd be cheaper to provide, it'd mean fewer paths over the flat crossing at Doncaster..
Bradford Council would not be happy with that, especially when from next year they will be trying trying to attract people into the redeveloped city centre from late next year onwards. There's a lot of proposed housing developments planned right up the Aire Valley, so you would be cutting them off from a direct service to Bradford. Again, there's a bigger picture to look at
Obviously Bradford Council wouldn't be happy at a plan that reduces the offpeak Forster Square service to stations north of Keighley, but then there's a bigger picture than "what do Bradford Council want" - but the current sixteen coaches (plus Carlisle/ Morecambe services) north of Keighley is an overprovision.
If you are going to have a dedicated "Shuttle" fleet for the airport, wouldn't it be better to refurb a few 319s with more luggage space for this use, at least in the short term? If you are going to have such a service it needs to be at least suitable for the job, not just a commuter train which will do nothing for increasing the passenger flow to the airport, which is really the whole point
I've wondered in the past about a dedicated "Airport Shuttle" from Mayfield (AIUI you can "check in" at Paddington before boarding a Heathrow Express service, maybe a dedicated departure area for all Airport services at Piccadilly could have similar facilities for flyers?).
However, the 319s do already service two of Britain's busiest airports.