For what it is worth, I used to use Thameslink regularly and still make the occasional trip. The 319s have always been good trains for me. Reliable and with good performance on AC. I will be happy to see them arrive. I believe some of the negativity I have observed may be due to the abuse they have received. Increased vandalism is one of the downsides of DOO which should hopefully be much reduced up here.
I just hope they fix the following:
- Flooring that seems to attract grime.
- Scratches on the windows.
- Easy to disassemble seats (the 150s had the same problems).
- Better latches for the gangway doors so they stop coming open.
Commuting from Sussex to London Bridge every day about the only silver lining of the LB rebuild cloud is the fact that when I work late I no longer have to catch a Thameslink train from LB.
Have to say I will be pleased to see the back of the 319s; scruffy, noisy, draughty, rattly things, completely agree with the fixes suggested above and would add:
- Something that automatically shuts the doors after a few seconds (not leaving them open until the train is ready to leave while all the warm air disappears.)
- Windows that stay closed or open as desired (and don't open/close when you enter a tunnel or another train passes)
- Improved soundproofing
Presumably the suspension will be rebuilt too, when they were introduced I remember the ride being exceptional compared to the 60s EMUs that NSE (or their predecessors) were running. Now they seem to jump about and sway all over the place compared to the 377s. Whether it's the age of the 319s, the comparative newness of the 377s or a combination of both I don't know.
Not sure about reliability either, in my experience Thameslink in general has a shocking record for cancellations and lateness, although I think I am right in saying they are bottom of the pecking order behind Gatwick Express and Southern - which if true can't help. But train breakdowns and faults seem pretty regular...