Class377/5
Established Member
- Joined
- 19 Jun 2010
- Messages
- 5,594
It's due to be removed from the initial batch at ilford so I'd say it probably won't be kept for the rest
Removed at Hornsey. Ilford doesn't deal with 319s.
It's due to be removed from the initial batch at ilford so I'd say it probably won't be kept for the rest
Also the suggestion of northern 323s to LM is entirely mine, based on the fact that LM will need extra EMUs when the Chase line goes live and Bromsgrove extension to Cross city services is finished. These units have to come from somewhere, with 323s being the obvious choice (well, obvious to me!).
Removed at Hornsey. Ilford doesn't deal with 319s.

It's due to be removed from the initial batch at ilford so I'd say it probably won't be kept for the rest
Porterbrook have recommended the removal of 3rd rail equipment opposed to keeping it fitted on the off-chance that at some point in the future it's wanted again.
If 3-car trains are in such hot demand, shouldn't Class 314s, Class 318s and Class 320s be cascaded to England & Wales for use by Northern and/or ATW's Valley Lines services. Or better yet couldn't all Class 323s be cascaded to Northern.Also do we assume the plan to make at least some 319s 3 car and run doubled up on busy services is taken up or not? Network Rail have warned that if it isn't taken up then the Bolton corridor will likely continue to have 6 car DMU workings at peak times post-electrification.
Would the power source select function of the pan down button be removed, or will it stay in place with drivers told, if you don't get line light, press it again?
Is the current best guess that refurbished Class 319s will also be used for all these shorter distance electric services:
Will there be enough Class 319s to cascade to everywhere that will need them?
- Liverpool - Manchester Vic/Airport
- Liverpool - St.Helens - Wigan/Preston
- Blackpool - Preston - Manchester/Liverpool
- Manchester - Bolton - Wigan
- Man Vic - Stalybridge extension?
After 2016, Northern will have an electrified 80-mile trunk route Crewe-Manchester-Preston-Blackpool.
Also another one nearly as long Stoke-Manchester-Liverpool (70 miles).
Wouldn't you expect somebody to be planning the most efficient services over these trunk routes rather than the historic stub-ends we mostly have now?
It would eliminate a lot of dead time turning in Manchester and other strange places (like Hazel Grove).
eg 2tph Crewe-Manchester-Blackpool, alternating via Stockport/Airport, with 2tph Stoke/Macc-Manchester-Liverpool.
Then fill in the shorter routes and higher frequencies round this.
It's an opportunity to look at the bigger picture.
Replacing DMUs by EMUs one-for-one on the current network doesn't feel right.
Nobody is going to make the through journey Crewe-Blackpool or Stoke-Liverpool by these routes, except enthusiasts or if really low fares were offered, because much shorter routes are available and if the trains replace the current Northern services they will be making lots of stops. So if these journeys are linked it would be for operational convenience rather than to attract passengers, and the train interior and service should be designed for the rather shorter journeys that are actually going to happen. Running a train for a long distance through lots of junctions also creates a performance risk.
Far better to retain the link between Blackpool and Manchester Airport since it's a journey people might actually want to make. I doubt there is a single destination beyond Manchester that has a particular attraction for passengers from Stoke, and because this service is tightly timed between faster trains it makes sense to terminate it at Piccadilly and not risk importing delays from beyond.
I'm not sure how any re-planning could eliminate the turnbacks at Hazel Grove either. All the current trains are diesels and some turn back here because, presumably, demand reduces on the section onwards to Buxton. If they were electrics they would all have to turn back here, as there is no committed scheme to electrify on to Buxton.
Well it's how the RER works. Or Thameslink, and Crossrail.
It's also what the Northern Hub is for (more throughput via Oxford Road/Victoria).
Currently the 319s do 100+ mile legs with multiple stops/routes on a daily basis without batting an eyelid. Why is this not valid in the north?
You can still have your Blackpool-Airport if you want, but there is a lot of fresh air carted around between Piccadilly and the Airport in the current 9tph.
After 2016, Northern will have an electrified 80-mile trunk route Crewe-Manchester-Preston-Blackpool.
Also another one nearly as long Stoke-Manchester-Liverpool (70 miles).
Wouldn't you expect somebody to be planning the most efficient services over these trunk routes rather than the historic stub-ends we mostly have now?
It would eliminate a lot of dead time turning in Manchester and other strange places (like Hazel Grove).
eg 2tph Crewe-Manchester-Blackpool, alternating via Stockport/Airport, with 2tph Stoke/Macc-Manchester-Liverpool.
Then fill in the shorter routes and higher frequencies round this.
It's an opportunity to look at the bigger picture.
Replacing DMUs by EMUs one-for-one on the current network doesn't feel right.
After 2016, Northern will have an electrified 80-mile trunk route Crewe-Manchester-Preston-Blackpool.
Also another one nearly as long Stoke-Manchester-Liverpool (70 miles).
Wouldn't you expect somebody to be planning the most efficient services over these trunk routes rather than the historic stub-ends we mostly have now?
It would eliminate a lot of dead time turning in Manchester and other strange places (like Hazel Grove).
eg 2tph Crewe-Manchester-Blackpool, alternating via Stockport/Airport, with 2tph Stoke/Macc-Manchester-Liverpool.
Then fill in the shorter routes and higher frequencies round this.
It's an opportunity to look at the bigger picture.
Replacing DMUs by EMUs one-for-one on the current network doesn't feel right.
Have you any idea how complex the route through Manchester is? You can't just look at a line on a map and say, that train should go this way. It doesn't work like that.
....What are we going to use those new south side platforms for?....
* Long term we're expecting Piccadilly to gain 3 new platforms (0, 15 and 16) meaning Piccadilly will be able to handle more terminating services from the Ardwick direction as well as allowing more through services.
Ordsall Chord which will see many TPE services to Manchester Airport switch from reversals in the 12 main platforms to through trains via Oxford Road and Victoria.
Will platform 0 at Manchester Piccadilly have any resemblance to platform 17 at Leeds. Where exactly will this new platform be situated, assuming that it will be somewhere in the region of the existing train shed.?
Think like at Stockport station where they've built a new platform beyond platform 1 and called it platform 0 opposed to renumbering the existing platforms.
I am fully aware of the position of the through platform 0 at Stockport which is within the confines of the land area that was used. I do note that the existing platform 1 at Manchester Piccadilly is situated hard against the brick walled area of the existing train shed, so do I take it that platform 0 will be so constructed to be exterior to the train shed in the manner of what was the case at Manchester Central station on the Lower Moseley Street side of that train shed there ?
Chester trains usually got banished there. 15 minutes to Altrincham, 1 stop at Sale.
Journey times have not improved, although frequency has.