• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Northern possibly close to taking on extra EMUs

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
They haven't decamped because the argument worked.
They haven't been given any reason to go anywhere else.
But you can guarantee that they would.

The market values nothing but expediency.

They havent decamped because they dont want to, they know which side their bread is buttered.
They really dont want to go anywhere else because they wont get away with what they do here plus the fact a lot of them have families who dont/wont move.
You can guarantee they wouldnt carry out the threat (see previous answer).
the market is only interested in profit and couldnt give a flying <whoops> how they make that profit.

I have changed yourt post to better reflect the truth about the financial markets.

Edit-

What was the original subject, I dont want another warning.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,102
Location
Redcar
If we could leave the discussion about financial markets to another thread (if anyone want's to set one up I'd suggest General Discussion). Otherwise let focus on Northern Rail and the possibility of getting more EMUs.

Thanks.

No warnings for anyone this time ;)
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,058
Location
Reston City Centre
let focus on Northern Rail and the possibility of getting more EMUs

Based on the current Northern franchise plus the Manchester Airport - Blackpool TPE service (which might as well be part of Northern...) I can see them needing around a hundred EMUs by the time CP5 is finished with.

Coincidently, that works out at all of the 333s and all of the 319s (323s move to LM, 321s and 322s to GA).

Obviously there'll be complaints about EMUS sitting around spare waiting for lines to be electrified and there'll be complaints about newly electrified lines run by DMUs (because there aren't any EMUs spare).

I'm pragmatic enough to accept that CP5 is going to see a lot of tricky bits of balancing as new stock comes on stream (345s, 700s etc) and frees up other stock (depending on the new stock working straight away/ needing a few months to bed in), at the same time that lines are slowly electrified.

It'll all be worth it, despite the predictable complaints about "why should we get London cast offs" etc - but it'll be a little messy in the meantime.
 

AndyLandy

Established Member
Joined
30 Oct 2011
Messages
1,323
Location
Southampton, UK
Why not ? Why not also supplement these stocks with "cascaded" stocks from other areas once these other areas have received their new stock.

Perhaps you will now understand the animosity to certain "favoured" areas by those deemed to be "second-class" areas...<(

The words "goose" and "gander" seem to ring extremely loud bells in these "second-class" areas.

I think my answer to this question is to turn it on its head:

"Why does the North want/need new trains?"

Once you step away from the "Well, it would just be nice, and it's unfair that we don't get them" and look at the issues afflicting rail travel in the North, there are some important facts to consider.

1. We requre additional capacity:
This can be addressed with longer/more frequent trains. Their "newness" doesn't necessarily come into it. Given current service levels, the existing infrastructure should largely be able to support longer trains and more paths.
2. We wish for cleaner, more modern trains:
A decent refurbishment of existing stock can fulfil most of these requirements. In many ways, the PRM-TSI legislation is good for all rail travellers, as it will insist upon a base-level of amenities, such as large, accessible lavatories and passenger information systems et al.
3. We wish for faster services:
This is far more likely to come down to line speeds. What use is a fast train if the linespeeds mean it doesn't even reach 75mph for large portions of the route. Line upgrades are far more useful here. Even the humble 150 could provide improved service if the lines it runs on are upgraded to allow more 75mph running.

On the other hand, why does the South want new trains?
1. We require additional capacity:
When you're already filling every platform and every path, you need to look at smarter ways of using the capacity you have. Improved acceleration, denser seating, better overall vehicle design and layout to eek out as much capacity as possible is key. Even the humble 142 has a lavatory. Many inner suburban trains in the South East don't provide such luxuries, even the recent Class 376 trains don't feature a loo.

So, if you're resigned to acquiring new trains to try and squeeze out as much capacity as you can in the SE, and the result means that some perfectly serviceable trains become redundant in the process; which happen to fulfil the needs of the North, at much lower cost than new trains; surely it makes sense to cascade them.

And if you happen to have enough money to acquire a whole new fleet of trains in the North, just think what you could do to improve the infrastructure instead with that money instead! Line speed increases, electrification of many routes, widening lines, longer platforms, improved amenities at stations. And the cascaded trains from the South would allow you to start taking advantage of much of those improvements right away.

...and as tbtc has previously alluded to, once the CP5/CP6 electrification works are complete, and the 'sparks effect' has brought growth to the North, I can well see a procurement for a large number of modern, fast EMUs to replace the hodge-podge of cascaded trains taking place.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,439
Location
A typical commuter-belt part of north-west England
On another thread, I TWICE made the very point of stating that I felt the Class 150 units would be an ideal mode form of rail traction on the soon to start Blackburn-Copy Pit line- Manchester Victoria service, but was informed TWICE that only Class 142 Pacers were the right class to operate this particular brand new service and that asking for the class 150 units that you refer to in your posting which were needed elsewhere would be at the cost of not improving services that serve the South Yorkshire and Lincolnshire areas of the Northern Rail current franchise.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,637
Location
Rochdale
It matters not what people think is the "correct traction" for the extended Wigan - Rochdale run because you can have 142, 150 or 156 running on here, all depending on what is available or what has been swapped about, or needs to finish at Newton Heath that day. Quite frequently at Victoria Ive seen every other unit on the Wigan Rochdale, Leeds, Southport,Blackpool N or Liverpool services all being swapped here, all day, everyday.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
On another thread, I TWICE made the very point of stating that I felt the Class 150 units would be an ideal mode form of rail traction on the soon to start Blackburn-Copy Pit line- Manchester Victoria service, but was informed TWICE that only Class 142 Pacers were the right class to operate this particular brand new service and that asking for the class 150 units that you refer to in your posting which were needed elsewhere would be at the cost of not improving services that serve the South Yorkshire and Lincolnshire areas of the Northern Rail current franchise.

It does highlight an intresting point that there can be a world of difference between what stock is most suited for a route and what stock is available to run the route.

It can be easy to fall into thinking that the currrent stock availibility is how it is and so that is what has to be.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,058
Location
Reston City Centre
I think my answer to this question is to turn it on its head:

"Why does the North want/need new trains?"

Once you step away from the "Well, it would just be nice, and it's unfair that we don't get them" and look at the issues afflicting rail travel in the North, there are some important facts to consider.

1. We requre additional capacity:
This can be addressed with longer/more frequent trains. Their "newness" doesn't necessarily come into it. Given current service levels, the existing infrastructure should largely be able to support longer trains and more paths.
2. We wish for cleaner, more modern trains:
A decent refurbishment of existing stock can fulfil most of these requirements. In many ways, the PRM-TSI legislation is good for all rail travellers, as it will insist upon a base-level of amenities, such as large, accessible lavatories and passenger information systems et al.
3. We wish for faster services:
This is far more likely to come down to line speeds. What use is a fast train if the linespeeds mean it doesn't even reach 75mph for large portions of the route. Line upgrades are far more useful here. Even the humble 150 could provide improved service if the lines it runs on are upgraded to allow more 75mph running

That's a good way of looking at it.

"The North" has a lot of lines where the current services get nowhere near 75mph and where a 40/46m DMU copes fine with demand (I think it was WatcherZero who pointed out that Northern services have an average passenger load of something like 45 people?)...

...so its hard to see the justification for lots of brand new 100mph four coach units. If anything, cascaded stock like the 317s or 319s are going to be over-kill on the routes they may operate.

I've suggested three coach 90mph EMUs (the 318s and 320s from the Glasgow area) which would generally be a step forward from a Pacer/ 150/ 156 (and easier to double up to six coaches)
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
That's a good way of looking at it.

"The North" has a lot of lines where the current services get nowhere near 75mph and where a 40/46m DMU copes fine with demand (I think it was WatcherZero who pointed out that Northern services have an average passenger load of something like 45 people?)...

...so its hard to see the justification for lots of brand new 100mph four coach units. If anything, cascaded stock like the 317s or 319s are going to be over-kill on the routes they may operate.

I've suggested three coach 90mph EMUs (the 318s and 320s from the Glasgow area) which would generally be a step forward from a Pacer/ 150/ 156 (and easier to double up to six coaches)

Wouldn't it make sense to go to a standard 20m four coach design so in the future you can order off the shelf designs with the development costs spread over more orders?

With the Northern routes you get four car EMUs and only double up on major routes which can generate the traffic. Use the 319s to generate the sparks effects that will hopefully generate the cash to afford brand new units and cascade the 319s to less profitable routes (and hopefully replace the pacers as the wires are rolled out further).
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,439
Location
A typical commuter-belt part of north-west England
I see that a number of my postings have brought forward well-crafted technical posting replies. I will hold up my hands and admit to having Class 323 units on our local Macclesfield area services and not the types of arcane DMU that cause certain posters who have accept such units for their mode of local travel. As such, I now feel somewhat obliged to apologise to those forum members for having to suffer from their particular modes of DMU travel and I am indeed thankful for the Class 323 units made available to us by Northern Rail in our part of Cheshire East.

I trust all who I may have slighted will accept this posting apology in the heartfelt manner that it is written.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Based on the current Northern franchise plus the Manchester Airport - Blackpool TPE service (which might as well be part of Northern...) I can see them needing around a hundred EMUs by the time CP5 is finished with.

Coincidently, that works out at all of the 333s and all of the 319s (323s move to LM, 321s and 322s to GA).

I see that a number of my postings have brought forward well-crafted technical posting replies. I will hold up my hands and admit to having Class 323 units on our local Macclesfield area services and not the types of arcane DMU that cause certain posters who have accept such units for their mode of local travel. As such, I now feel somewhat obliged to apologise to those forum members for having to suffer from their particular modes of DMU travel and I am indeed thankful for the Class 323 units made available to us by Northern Rail in our part of Cheshire East.
While the 319s will undoubtedly be an improvement on Pacers and Sprinters, I fear passengers accustomed to the 323s would regard their replacement by 319s as a step backwards, particularly in respect of the inferior acceleration and greater susceptibility to leaves on the line.

319s might be particularly ill-suited to the Glossop/Hadfield line, with its closely-spaced stations and steepish gradients.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
319s might be particularly ill-suited to the Glossop/Hadfield line, with its closely-spaced stations and steepish gradients.

Take it you haven't been on the Thameslink Core with some of the steepest gradients on the UK network (something like 2nd or 3rd in the country) and extremely close stations then?

319s have worked on that sort of environment since day one.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Even then the acceleration wouldn't match the 323. Acceleration depends a lot on the number of motored axles, a 3-car 319 would still only have one third and a 323 has two thirds. A 319 also has less power and DC motors are probably less effective at using this power at high speeds. A re-tractioning might address these two issues but would be unlikely to add another power car in each unit.

319s have DC Traction on four axles with chopper control, chopper control is nearly the most modern DC traction control available, but DC motors are not ideal, especially in the mid end.

323s have Single Source Excitation GTO Thyristor Controlled 3 Phase AC Motors on 8 axles, not only is this motoring on more axles, it incorporates (if I'm thinking right from what I know of Hunslet's control equipment) variable winding controls and by the very virtue of AC traction, very good wheel slip protection and traction control.

Even if the 319s are refurbished with IGBT invertors on the currently motored axles with AC motors, they won't be as powerful, nor will you have as much tractive effort at the low end because you simply have many less points of contact with the track.

Take it you haven't been on the Thameslink Core with some of the steepest gradients on the UK network (something like 2nd or 3rd in the country) and extremely close stations then?

319s have worked on that sort of environment since day one.
As explained in the above posts, a 319 inevitably has worse acceleration than a 323, especially in conditions of poor wheel/rail adhesion.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
While the 319s will undoubtedly be an improvement on Pacers and Sprinters, I fear passengers accustomed to the 323s would regard their replacement by 319s as a step backwards, particularly in respect of the inferior acceleration and greater susceptibility to leaves on the line.

319s might be particularly ill-suited to the Glossop/Hadfield line, with its closely-spaced stations and steepish gradients.

The vast majority of commuters won't notice such technical issues.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,187
The vast majority of commuters won't notice such technical issues.

Aside from any slower journey time, or any otherwise 'inferior' characteristics (the passenger environment will likely be set for drastic improvement as with the 317/321 rebuilds).
 
Last edited:

43074

Established Member
Joined
10 Oct 2012
Messages
2,253
How would the acceleration of a 319 with AC motors compare to that of a 323?
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
The vast majority of commuters won't notice such technical issues.
No, but they will notice if their journey takes longer because the timetable has to be changed. The Glossop/Hadfield line already has a special autumn "leaves on the line" timetable, despite the 323s having 8 powered axles and wheel slip protection. I doubt that leaves or snow are often much of a problem in the Thameslink tunnels.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,680
Location
Nottingham
Take it you haven't been on the Thameslink Core with some of the steepest gradients on the UK network (something like 2nd or 3rd in the country) and extremely close stations then?

And a maximum speed of, what, 20mph?
--- old post above --- --- new post below ---
The vast majority of commuters won't notice such technical issues.

It's not about the commuters, it's about creating a railway that works reliably and provides a suitable range of services to carry them.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
How would the acceleration of a 319 with AC motors compare to that of a 323?

I dont really know the answer to that but perhaps yes and I beleive the acceleration of the class 319's is something Northern have been concerned about since they are a little sluggish compared to the class 323's which lets face it go off like rockets
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
And a maximum speed of, what, 20mph?

Used to be 40mph prior to the rebuilding. But that not the point I was replying to. Other poster was stating that close together stations and steep gradients may make the 319s unsuitable and I was pointing out that what they have been doing for every day for the last 25yrs.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,680
Location
Nottingham
Used to be 40mph prior to the rebuilding. But that not the point I was replying to. Other poster was stating that close together stations and steep gradients may make the 319s unsuitable and I was pointing out that what they have been doing for every day for the last 25yrs.

The steepest gradients are either side of City Thameslink where the speeds may be lower and attainable speed is lower still. My point is that climbing a gradient at low speed needs less tractive effort or power than accelerating up it or climbing it at higher speeds.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,340
The steepest gradients are either side of City Thameslink where the speeds may be lower and attainable speed is lower still. My point is that climbing a gradient at low speed needs less tractive effort or power than accelerating up it or climbing it at higher speeds.

The tractive effort required to ascend the slope is largely the same for most reasonable speeds (obviously not including air resistance which is a fairly minor problem at the speeds that the Glossop and Hadfield line works at).

However you are correct that Power, Power, Power is what is important for climbing gradients.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,680
Location
Nottingham
The tractive effort required to ascend the slope is largely the same for most reasonable speeds (obviously not including air resistance which is a fairly minor problem at the speeds that the Glossop and Hadfield line works at).

However you are correct that Power, Power, Power is what is important for climbing gradients.

I didn't want to bring the difference between power and TE back in again as it seems to confuse so many people. But yes, the TE required to move the train increases on a steeper gradient but as long as there is enough TE (and adhesion) to move the train then the speed at which it can move will be power-limited.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
As explained in the above posts, a 319 inevitably has worse acceleration than a 323, especially in conditions of poor wheel/rail adhesion.
323s have been terrible for wheelslip since the day they entered service! The stats may say its "inevitable" but the reality is somewhat different. There is a reason the x-city has one of the most trimmed leaf fall services in the country and its largely 323 related.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
The tractive effort required to ascend the slope is largely the same for most reasonable speeds (obviously not including air resistance which is a fairly minor problem at the speeds that the Glossop and Hadfield line works at).

However you are correct that Power, Power, Power is what is important for climbing gradients.
Quite. I was not suggesting that the 319 would be unable to climb the gradients on the Glossop/Hadfield line, merely that it might not be able to maintain the same timings as the 323, particularly in slippery conditions. Network Rail is investing in linespeed improvements on this line in CP5, with the objective of increasing capacity by enabling an increase in frequency, and thereby avoiding the need for platform lengthening beyond the current 3x23m car length. It would not be very joined-up planning then to undermine this strategy by replacing the 323s, which have operated in this area all their lives, by older 4x20m 319s with worse power-weight ratio, just in the interests of national fleet rationalisation.
 
Status
Not open for further replies.

Top