Northern Pacers?

Status
Not open for further replies.

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
[/B]
I thought I had made it clear that I did not think the timescales were achievable.

Just read your previous post again and yes you did say it wasn't realistic but you went on to list how you thought Pacers could be eliminated if they were, which seemed a bit of a strange thing to do.

National Express have fitted all their new coaches from about 2006 with wheelchair lifts fitted in the front entrance.
I wonder if the same could be done to Pacers? - you would need 2 per unit - one each side and it would be very expensive, anyone know/guess the cost? would be 140 x 2, maybe less as some (South Wales) could be replaced before 2020.

I imagine there are few National Express coaches that were built before 2006 still in service on NE routes.

As I have pointed out previously the end of 2019 date was set because it was seen as the life expiry date of the 158s and 159s unless they had life extension work based on a 30 year shelf life for DMUs without life extension work. If the life extension work was done then DDA compliance would be done at the same time.

If a life extension program was going to done for 142s and 150s it should have already been done 3 or so years ago followed by 143s and 144s, with 153s, 155s and 156s being done around now and 158s and 159s being done around 2015. The longer it's left the less economically viable it becomes.

you would need 2 per unit - one each side and it would be very expensive

I think it would need to be 4 per unit to be properly complaint, if a door fails you can't leave someone stranded on the train!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
Could you permanently couple a non-DDA Pacer to an upgraded DDA-compliant 150?

Would that get round it?
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,074
Location
Redcar
Could you permanently couple a non-DDA Pacer to an upgraded DDA-compliant 150?

Would that get round it?

As far as I'm aware the requirement is that the train (so not the individual units/vehicles) that is operating the service has DDA compliant accommodation. So I'd suggest that you could get around it by doing that.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
As far as I'm aware the requirement is that the train (so not the individual units/vehicles) that is operating the service has DDA compliant accommodation. So I'd suggest that you could get around it by doing that.

I've seen it suggested many times that 153s be coupled permanently to 156s, but not Pacers being attached to DDA compliant stock - it'd certainly take a lot of pressure off.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
A lot of pressure - would it? Northern would effectively be losing quite a bit of their fleet..?
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
A lot of pressure - would it? Northern would effectively be losing quite a bit of their fleet..?

In terms of whether we can have a DDA compliant railway by 1 January 2012 (whilst dealing with rising demand), yes.

If a 142+150 combination would comply then that would provide more capacity than only having Sprinters (given that there are a number of routes where a two coach Sprinter couldn't cope).

Obviously Pacers need replacing eventually, but this would give a bit of breathing space to enable that to happen slowly.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,074
Location
Redcar
In terms of whether we can have a DDA compliant railway by 1 January 2012 (whilst dealing with rising demand), yes.

Well we're stuffed in that case seeing as the deadline was apparently nine months ago!

;)
 

150001

Member
Joined
24 Jul 2011
Messages
492
Like I pointed out earlier you can't really justify a new order for 8 trains.

Unless the order is for more 172s I would guess at LM getting the LO 172s, and losing their Sprinters to FGW, who in turn would lose their 143s to ATW=

LM could get them; share similar parts and they could be used to supplement the current 172s or replace the 153s. At the moment the 153s can't have their gangway connection fitted up due to it being a older type. The 172s would be no use on the Marston Vale as the 172s are too long. But if two 153s could be released off by some 172s then they could be coupled up and work it. I see your idea here now; may as well keep similar units together.
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,321
There are 29 170s at XC so they could be displaced by 27 222s plus maybe two from West coast as the 221s are being replaced by the new "mystery" units. So the 170s there could go to Northern although they would require re gearing or something doing to improve the acceleration. .

I doubt that TOC's would want 221 / 222 classes on 170-type duties. They are too fuel-hungry and would increase operating costs. Also, some platforms would be too short for 5 coach trains. One solution might be to re-engine some of the 221/222's with lower powered engines (say 350 to 400 hp), and also reducing them to 3 coach sets with the centre coach unpowered.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
For wheelchair and disabled toilets access yes its on a percentage of train length so you could get round it like that, you would still have to do all the other measures though like for the visually impaired buttons, contrasting colours, signage, etc..
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
The 172s would be no use on the Marston Vale as the 172s are too long.

IIRC 172s do have SDO so they can be used without platform lengthening.

What are passenger numbers like on Marston Vale? If they are rising then platform lengthening may be a viable option.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
I doubt that TOC's would want 221 / 222 classes on 170-type duties. They are too fuel-hungry and would increase operating costs. Also, some platforms would be too short for 5 coach trains. One solution might be to re-engine some of the 221/222's with lower powered engines (say 350 to 400 hp), and also reducing them to 3 coach sets with the centre coach unpowered.

No because a 3 coach 22x wouldn't have enough capacity.
 