Unfortunately there's been too much like for like replacement on Northern routes without the uplift in capacity needed. One can only hope that we speak up any surplus units and allow more sets to be doubled up.
Going by my own line, the Hallam, which is a fairly standard urban route (of the sort you like telling us all we should be concentrating on), we've had 3-carriage 144's replaced by 2-carriage 158's on the stoppers, which is a maintenance of capacity, whilst on the fasts, 2 carriage 158's have been replaced by 2 carriage 195's, which is a reduction in capacity. From what people have observed on here, this isn't the only line where this is happening
So you've gone from complaining about too much "like for like" replacement across Northern to accepting that there's been some huge increases in capacity across the franchise (as electrification, new trains and cascades has allowed all of the shortest stock to be removed), it's just that your local route isn't getting a share of that - fair enough
I absolutely agree that your local route is the kind of one that we should be focussing more on - I've suggested in the past that we could achieve a lot more out of it by interworking at Leeds, to get round the problems with the short platform (e.g. interworking a Sheffield - Barnsley - Wakefield - Leeds service with a Leeds - Castleford - Pontefract - Knottingley service every half hour would mean that you could have three/four coach trains at Platform 17, since there'd only be one train in Leeds at any time (even if the plan was that each service had a ten minute layover at Leeds, you'd never have two trains needing the same platform at the same time)
However, as you'll be aware, Platform 17 is restricted (forgive me for not remembering the exact length, but it's certainly under one hundred metres, and the separate Sheffield semi-fasts and Castleford services mean that both need the platform at the same time, so each service is restricted to only two carriages). I'm sure that Northern would love to stick more carriages on, but the train length is constrained by the length of this frustratingly short bay platform
Until we either spend large sums of money on lengthening it (money that appears in short supply), start running services from the Woodlesford lines into other platforms (which means conflicts with other lines, and cutting capacity for other routes) or interwork the two separate routes so that an arrival from Sheffield becomes the departing Knottingley train and vice versa (so that anything through Woodlesford can be three/four coaches long - my preferred solution), we are stuck bumping up against the problem of the short platform - something needs to be done, but it doesn't look like it'll happen
(for my cunning plan to work, you'd chop the "Sheffield - Castleford - Leeds" service at Barnsley or Wakefield - Wakefield to Castleford would be provided by the ex-Huddersfield service, Castleford would still have a half hourly service into Leeds it's just that they'd all be ex-Knottingley - stops at Darton and Normanton would be picked up by the "semi-fasts")
It's fairly simple really. The rules would change whereby if the ROSCO decided to sell rolling stock, the Government would get first refusal. Price could be independantly ajudicated as with a compulsory purchase.
It may come as a surprise to you, but it is possible to conceive of legal and managerial arrangements that are different from John Major's Railways Act.
There'd have been no problem with the ROSCOs agreeing a sale to the Government
if they'd both found a reasonable price - I'm just wondering how far you want to go with this idea that the Government should be able to buy assets back lower than the market price though
Which is
around 75% of what they were getting on average in the Premier League. That's a noticeable reduction in the number of people in the space.
I'm sure that there's a lot of Premier League teams who'd be delighted to retain three quarters of their attendances if they ever suffered a double relegation
But I suppose that it's not just a case of ten thousand fewer supporters at each match, it's also (for the purposes of this thread) about the fact that a lot of those ten thousand will have been travelling longer distances to matches (e.g. Manchester United would have brought a lot more to the away end than Rotherham United) - so it probably makes quite a difference to the numbers travelling by train to the Stadium of Light (whereas a lot of that 31k attending matches in the third tier will be relatively local to Wearside)