lancastrian
Member
Couple of factors I guess. One is the decision between serving a new area and linking to an already-served area. In this case I guess that serving a new area won out (Nine Elms's main draw is New Covent Garden, which will be very popular).
The second, and more obvious, is that it's far quicker and cheaper to build a new station from scratch than add an interchange to an existing one, being as you don't have to modify, rebuild or disrupt anything.
I was looking at the map provided in Modern Railways about this extension. One thing that struck me was that both tunnels off the loop at Kennington actually go very near if not under the station at Oval. Was a interchange here ever considered, especially as looking at the rational of the two 'new' tube lines, Victoria & Jubilee lines. This was to make as many interchange stations as possible, whether with other underground lines and/or Main Lines.
The argument that Oval & Kennington are adjacent stations, falls flat when you look at such adjacent interchange stations such as Warren Street & Euston, both next to each other on both the Northern & Victoria lines. Not excluding the following three, Charring Cross, Embankment and Waterloo, on both the Northern & Bakerloo lines.
My point is, that it makes sense to me to make as many potential interchanges as possible to give the best alternative options when there are problems.
Which is why I agree with the comments about a potential interchange with the Victoria line & Mainline at Vauxhall.