I have read that Northern Ireland's last remaining section of jointed track to be replaced by continuously welded rail.

Would I be right in guessing that there isn't any left in Great Britain now either? I guess that there would be some on heritage railways still, I hope it is used somewhere as l like the feeling and sound of jointed track.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Lrd

Established Member
Joined
26 Jul 2010
Messages
3,018
There is loads of jointed track left in Britain.
 

IrishDave

Member
Joined
30 Jun 2009
Messages
471
Location
Brighton
Absolutely. Just one of many examples is the West Highland Line.

There's lots on branch lines in the far-flung regions, but there's even bits and pieces in the south-east - between Wokingham and Guildford on the North Downs line there's bits of jointed track (through Farnborough North, I think?). It felt very odd going over jointed track in a (diverted) Voyager yesterday!
 

Ploughman

Established Member
Joined
15 Jan 2010
Messages
3,102
Location
Near where the 3 ridings meet
I would imagine that there will still be plenty of jointed track in Northern Ireland in sidings and any freight routes.
There are some places that CWR cannot be installed in such as tight radius.
 

Ironside

Member
Joined
16 Aug 2012
Messages
418
Reading elsewhere it seems that jointed track remains in place on lines that are lightly used and there is a low track speed because it is cheaper to install, allthough requires more maintainance. I imagine rail that is at the extremities of the network are more likely to be jointed because of the expense of getting all the machinery in place for continuous rail.

Would I also be right in thinking that Network Rail is likely to replace some jointed track as it seems to be favouring machinery rather than labour intensive methods?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,665
Location
Nottingham
Probably more a matter of it not being broke so don't fix it.

Any replacement track is pretty much certain to be continuous welded, as seen on the Barnstaple branch for example. In the context of the high cost of replacing the track, laying welded will cost very little more than laying jointed, and gives the benefit of a smoother ride and less maintenance as well as the potential to increase line speeds.

But track won't be replaced unless it deteriorates to the state where maintenance becomes disproportionately expensive (which will happen well before it becomes unsafe) or if the amount or speed of traffic needs to be increased above what the existing track could take. On a minor branch line where trains are relatively few, light and slow, the track can last for many decades.
 

RailProfileUK

Member
Joined
15 Apr 2013
Messages
74
Location
High Peak
There will always be jointed track as long as the railway is in use. I know area's in the high peak such as Blackwell mill curve where the radius of the curve is to tight to install CWR. Due to the shape of Bullhead rail it can bend a lot more than CWR as it doesn't really have a foot. We tried to redesign Blackwell mill curve for CWR but there is not enough space on the outside of the curve to create track with a larger radius.

8231797619_e96f19bc4f_z_zps83b8c161.jpg
 

DVD

Member
Joined
23 Jul 2009
Messages
76
Location
Sidcup
Diddley dee diddley da. Diddley dee diddley da. Never been quite sure what causes the sound of jointed track but is so nice !
 

Monty

Established Member
Joined
12 Jun 2012
Messages
2,370
Not only is there quite a lot of jointed track still around, but there is still a considerable amount of bullhead rail knocking about too. :)
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Platforms 2 & 3 (south end bays, used a lot through the day from Kings Cross and Liverpool Street services) at Cambridge are jointed- they may even (my memory is ropy) be Bullhead. They're certainly pretty ropy...
 

rebmcr

Established Member
Joined
15 Nov 2011
Messages
4,005
Location
St Neots
Diddley dee diddley da. Diddley dee diddley da. Never been quite sure what causes the sound of jointed track but is so nice !

It's the spacing of the wheels on adjacent pairs of bogies.
 

Trog

Established Member
Joined
30 Oct 2009
Messages
1,546
Location
In Retirement.
There will always be jointed track as long as the railway is in use. I know area's in the high peak such as Blackwell mill curve where the radius of the curve is to tight to install CWR. Due to the shape of Bullhead rail it can bend a lot more than CWR as it doesn't really have a foot. We tried to redesign Blackwell mill curve for CWR but there is not enough space on the outside of the curve to create track with a larger radius.

The reason CWR is not used on tight curves is due to the risk of buckling due to compressive stress in the heat of the summer. It has nothing to do with the bend-ability or otherwise of the different rail sections.
 

oddiesjack

Member
Joined
11 Jan 2012
Messages
315
Location
High Peak
Just to put RailProfileUK's picture of Blackwell Mill curve in context, here it is in Feb 2011, showing the railway cottages, and Tunstead quarry in the distance

/IMG_1073s.jpg
 

Trog

Established Member
Joined
30 Oct 2009
Messages
1,546
Location
In Retirement.
Wuh?

Assuming that CWR installations are all relatively modern ones, and bullhead to be an old fashioned style of rail, why would one choose to use bullhead CWR?

The sections of this I have seen date back to the 1960's early 1970's when Bullhead was not quite so out of date. Indeed on one site the rails welded up to make the CWR had GWR markings.





Just what you need for the end of your bullhead CWR a 1960's bullhead breather switch.
 

181

Member
Joined
12 Feb 2013
Messages
942
Although the West Highland line has some CWR these days, it also has some stretches of jointed track which appear to be laid with short rails (45 feet?), identifiable by the continuous 'de-Dum-de-dum de-Dum-de-dum' rhythm from the wheels -- there are a few small sections between Fort William and Mallaig and (assuming it hasn't been relaid in the past few years) at least one between Crianlarich and Oban. Does this indicate that the track in question is very old?