Dft have updated their procurement pipeline spreadsheet.

Not sure if it has been changed, but Northerns 2 entries now shows as :

Replacement of Northern Trains Limiteds (NTLs) oldest rolling stock of 15X vehicles over the coming years with options to replace northerns remaining fleet in a framework agreement over 8 years
The procurement establishes a framework agreement with an 8 year term and this procurement relates to the Phase One requirements which are:
Lot 1: - EMU required for passenger service 2029-30 with an estimated requirement of 12 x 3-vehicle units.
Lot 2: - MMU required for passenger service 2030-31 with an estimated requirement of 48 x 3-vehicle units and 64 x 4-vehicle units.
Lot 3: - BEMU required for passenger service 2032 with an estimated initial requirement of 8 x 4-vehicle units.

 
Joined
16 Oct 2024
Messages
17
Location
Up North
8 BEMU's seems quite specific, any ideas where these will be deployed? Windermere, Blackpool S, Southport or Buxton at a stretch?
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,431
Location
Sheffield
From an internal Northern document I've seen, they are to be used on the Buxton line.
That was on a slide shown at the Stakeholder Conference in Liverpool on 17th November. Aim to be in service mid-late 2032.

From same slide, first EMU into service on TRU late 2030, first MMU into service in North West late 2031.

We all know circumstances can, and probably will, change but it's looking more specific as the months progress.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
My concern is that with those entry into service dates, they need to be placing orders soon. Especially for the MMU and BEMUs. The 810s were over 6 years from order to entry into service.....
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,156
My concern is that with those entry into service dates, they need to be placing orders soon. Especially for the MMU and BEMUs. The 810s were over 6 years from order to entry into service.....
As per the post above, the EMUs are first.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
As per the post above, the EMUs are first.
Yes but the MMUs are not long after 2030-31 is 4-6 years away. Less than the 6 years + from order to introduction on the 810s and the order is still many months if not over a year from being placed.
 

rattyben

Member
Joined
16 Jan 2025
Messages
52
Location
Hartlepool
That was on a slide shown at the Stakeholder Conference in Liverpool on 17th November. Aim to be in service mid-late 2032.

From same slide, first EMU into service on TRU late 2030, first MMU into service in North West late 2031.

We all know circumstances can, and probably will, change but it's looking more specific as the months progress.
It’ll be interesting to see what gets internally cascaded as these come into service.
 

Ribbleman

Member
Joined
12 Jun 2019
Messages
326
Yes but the MMUs are not long after 2030-31 is 4-6 years away. Less than the 6 years + from order to introduction on the 810s and the order is still many months if not over a year from being placed.
To the best of my recollection manufacturers’ bids will be received before the end of February. Evaluation will follow with the aim of placing orders in summer next year, though no doubt subject to the DfT not delaying matters.
 
Last edited:

Killingworth

Established Member
Joined
30 May 2018
Messages
6,431
Location
Sheffield
To the best of my recollection manufacturers’ bids will be received before the end of February. Evaluation will follow with the aim of placing orders in early summer next year.
Slide shown at recent Stakeholder event in Liverpool, apologies for quality

1764859074192.jpeg
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,804
The fact that there are two different Finak Investment Decision dates and that there is "(s)" on the end of "build programme(s)" suggests that this could be split between two manufacturers, one for EMUs, a second for the rest.

It also looks like I will have retired before the 333s!
 

GoneSouth

Established Member
Joined
17 Dec 2018
Messages
1,471
The fact that there are two different Finak Investment Decision dates and that there is "(s)" on the end of "build programme(s)" suggests that this could be split between two manufacturers, one for EMUs, a second for the rest.

It also looks like I will have retired before the 333s!
Congratulations, you won’t have to suffer what replaced them!
 

rattyben

Member
Joined
16 Jan 2025
Messages
52
Location
Hartlepool
Will the North East get more 158s or the new MMUs?
They have said new trains would arrive in the North East by 2030/31.

That’s an email I got back from them with regards this question in May.
 

Attachments

  • IMG_6089.jpeg
    IMG_6089.jpeg
    93.8 KB · Views: 146

3RDGEN

Member
Joined
6 Mar 2023
Messages
584
Location
Hull
So class 150s will soldier on until 2032-33?
The MMU's due for 2030/31 are to replace the 150/155/156 fleets so it will depend upon their delivery and which unit's Northern replaces first, they haven't published full details of their cascade plans. The EMU's due in 2030 will replace the 150's from the Huddersfield - Leeds stopper and the 195's from the Leeds - York stopper allowing a small fleet cascade, assuming those parts of TRU are completed on time.
 

Mat17

Member
Joined
17 Aug 2019
Messages
961
Location
Barnsley
The MMU's due for 2030/31 are to replace the 150/155/156 fleets so it will depend upon their delivery and which unit's Northern replaces first, they haven't published full details of their cascade plans. The EMU's due in 2030 will replace the 150's from the Huddersfield - Leeds stopper and the 195's from the Leeds - York stopper allowing a small fleet cascade, assuming those parts of TRU are completed on time.
I was thinking more Penistone line and South Yorkshire stopping services, always back of the queue.
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
584
Location
Hull
Are there any plans to replace the 170s?
They would be replaced in Phase 3 of the Northern new fleet plan if it happens so years away, no need to replace the pride of the Northern fleet for years yet.
 

BurtonM

Member
Joined
3 Feb 2014
Messages
975
Location
Manchester
It’ll be interesting to see what gets internally cascaded as these come into service.
I don't suspect there'll be a cascade, but a direct replacement. It'd be a good cause to scrap some of the worse condition 156s, or some 150s.
It would be nice if the displaced DMUs could be used to strengthen other services but I don't see it happening, especially on 150/1s with no corridor connections.

~~

It still baffles me that it's only now that replacing the 150s is being considered, I don't get why plans weren't in motion as soon as the Pacer withdrawals were complete. Eight more years is too long.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,586
Location
Greater Manchester
There are other options if the funding is there. TFW 158s start going off lease next year. They could replace the 150s in the worst condition to buy more time.
But only some of them, there just aren't enough to replace them all.

I don't suspect there'll be a cascade, but a direct replacement.
There will absolutely be cascades, the 195s need to make their way to the entirely diesel routes (e.g. Cumbrian Coast, Whitby).
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
There will absolutely be cascades, the 195s need to make their way to the entirely diesel routes (e.g. Cumbrian Coast, Whitby).

Indeed. That was a big part of the point of ordering 2-car 195s - for them to be cascaded to the low demand diesel routes to replace 150s and 156s. Otherwise ordering short units would have made no sense because it's paying for extra cabs that spend most of their time buried in 4 car formations.
 