• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Northern Dec 2022 Manchester area Timetable Consultation

Status
Not open for further replies.

Killingworth

Established Member
Joined
30 May 2018
Messages
6,497
Location
Sheffield
The Northern Manchester - Huddersfield - Leeds timetable does not show the eastern destinations of the TPE 5tph between Manchester and Leeds. However, it does show that the Piccadilly terminator (currently the Hull service) will run fast between Huddersfield and Stalybridge in off-peak hours, but call at Slaithwaite, Marsden, Greenfield and Mossley in the peaks. Together with the Huddersfield - Piccadilly stopper, that gives those four stations a 2tph service in the peaks.

The route swap detailed in the tweet will give Hull quicker services to/from Manchester as well as Liverpool, particularly in the peaks. Albeit serving Victoria not Piccadilly.

The downside is that Scarborough loses its longstanding direct Liverpool service and has slower Manchester journey times, especially in the peaks. While York goes down from 4tph to 3tph to Victoria, although it gets 2tph instead of 1tph direct to Piccadilly (Saltburn - Airport and Scarborough - Piccadilly).

Rumours on the Nova 3 thread suggest that the LHCS sets are to be transferred to the Saltburn and Cleethorpes routes, with all Scarborough services worked by 185s. 185s would be better suited to the calls at Slaithwaite, Marsden, Greenfield and Mossley.
Traction training on 68s now in progress between Sheffield and Manchester for partial introduction Cleethorpes - Manchester in May prior to full operations in December.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,305
Location
South West London
Traction training on 68s now in progress between Sheffield and Manchester for partial introduction Cleethorpes - Manchester in May prior to full operations in December.

I can imagine the peace being shattered at Dale as it comes out of the tunnel and roars through the station... :D
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,763
Location
"Marston Vale mafia"
Various local Press reports in the area are suggesting that Northern have agreed to retime the last Barrow train 30 minutes later, i.e. 2200 off the airport. This is still 10 minutes earlier than before, but is an improvement.
 
Status
Not open for further replies.

Top