Northern contract and Business Commitments

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,090
Location
"Marston Vale mafia"
The obvious 'do minimum' options are primarily to shrink fleet size and secondarily to life-extend 158s.

Unless there was a massive programme of line closures that would make Beeching look minor*, Northern have far too many 150s and 156s for that to be viable. Though it might be possible if they got all the TfW 158s?

* Say goodbye to, for example, Ormskirk, Blackpool South, Headbolt, the Cumbrian Coast past Barrow, the S&C, Bentham, probably the Hope Valley locals, and they'd probably need to convince Manchester to convert more Manchester commuter lines to Metrolink, too. At least.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,192
Location
Bolton
I'm thinking more about some of the very short bay platforms at larger stations that cannot be extended, though as mentioned 195s internally cascaded should be able to handle that.
Apart from Huddersfield, one of which has already been extended and the other is being abolished, and Leeds, which is only platform 17 and this is a relatively simple job to extend, this really isn't an issue. Leeds needs quite a lot of money but it's not technically very challenging. Also platform 2C at Sheffield may be a pain but it's not a rate limiting step, and will also probably be extended within the next ten years.

== Doublepost prevention - post automatically merged: ==

Unless there was a massive programme of line closures that would make Beeching look minor*, Northern have far too many 150s and 156s for that to be viable.

* Say goodbye to, for example, Ormskirk, Blackpool South, Headbolt, the Cumbrian Coast past Barrow, the S&C, Bentham, probably the Hope Valley locals, and they'd probably need to convince Manchester to convert more Manchester commuter lines to Metrolink, too. At least.
There are rather a lot of Express Sprinters which aren't in the franchise which will be available and could be life extended. I said it's a do minimum option, not a desirable option. There's also way too many 185s for the work, so some of those can take over the 195 work. Finally, as the discussion in the South Fylde thread showed, shrinking the fleet doesn't need to mean Beeching style closure, people are just purists who leap to these conclusions. There are actually a large number of options.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,090
Location
"Marston Vale mafia"
There are rather a lot of Express Sprinters which aren't in the franchise which will be available and could be life extended. I said it's a do minimum option, not a desirable option. There's also way too many 185s for the work, so some of those can take over the 195 work. Finally, as the discussion in the South Fylde thread showed, shrinking the fleet doesn't need to mean Beeching style closure, people are just purists who leap to these conclusions. There are actually a large number of options.

If you cascaded Northern all the TfW 158s and 769s (if not already scrapped) it'd probably be workable.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,192
Location
Bolton
If you cascaded Northern all the TfW 158s and 769s (if not already scrapped) it'd probably be workable.
The TfW ones will be available from 2025-26 and the ScotRail ones from 2030-31. The downside to this is that the factories may decline to bid for life extension works on 158s. Either way there's a metaphorical gun on the table for the incoming English SoS for Transport to deal with. 769s are junk sadly, and don't save money so they have no future.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,090
Location
"Marston Vale mafia"
The TfW ones will be available from 2025-26 and the ScotRail ones from 2030-31. The downside to this is that the factories may decline to bid for life extension works on 158s. Either way there's a metaphorical gun on the table for the incoming English SoS for Transport to deal with. 769s are junk sadly, and don't save money so they have no future.

769s aren't great, but Northern do seem to be making them work-ish to the point of being usable.
 

jayah

On Moderation
Joined
18 Apr 2011
Messages
2,056
What is really needed is a committed to electrification programme from which the unit replacement programme can be created (i.e. knowing how many non-electric units are needed). I think I might have just seen a pig go past my 2nd floor window!
The last thing that is needed is a commitment to a 1960s solution to the 21st century problem.

A local train uses about 2.5Kwh per vehicle mile. There are already buses and coaches with 300Kwh batteries under them - the going rate appears to be around 625kg/100Kwh.

There are more cost effective and faster solutions than a 60yr, £300bn rolling electrification programme.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,549
Wonder if Northern will take the same approach as VTEC then and rip out the barriers at stations they can't be bothered with manning the barrier for the required times :lol:
While VTEC were able to do that, and the wording of the commitment helped, I doubt it would be anywhere near as easy for Northern to do it now that they are an OLR company.
 

Roast Veg

Established Member
Joined
28 Oct 2016
Messages
2,319
If Chiltern take them on, they could still release vehicles newer than the Sprinters, which could be used in Northern's business case for replacement trains.
I'm not sure any released train sets would be suitable.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,072
Location
Redcar
See dedicated thread here for discussion of the Northern unit tender and rolling stock aspects. This thread remains just in case anyone wanted to discuss the non-rolling stock related aspects of the Northern contract and business commitments.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Are there not off-lease class 175s and 379s? If you're building a business case you would surely consider the viability of refurbished/converted existing trains that are newer than the trains being withdrawn.
It's up to the manufacturers/Roscos to respond to a Northern ITT (which they haven't produced yet), with commercial proposals.
Northern won't be doing any engineering or re-engineering.
Northern then just chooses (with DfT checking their arithmetic).
The bids won't be cheap, as the bidders know all too well how the DfT can truncate or respecify train orders.
There is also likely to be a change of government and maybe a change in procurement policy, before an order is placed.
 
Last edited:

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Status
Not open for further replies.