2*323s/3 car 331s will fit both platforms at Hazel Grove but will not fit the sidings or the platforms at Davenport and Woodsmoor. I suppose it would possible in the future (subject to pathing) to have 6 car to Stockport then portion worked with 3 cars to Macclesfield and 3 to Hazel Grove but this is likely to get messy on the way back with platforms blocked at Stockport.Yeah, Hazel Grove isn't perticularly long, then there's the siding it goes into for a little while.
The airport trains are the ones that need the most length I think, the current 319's get super overcrowded, especially on weekends!
Last edited: