When you say 'no new electric trains', is that 'you may use 319s but not new build' or is it 'there will be no wires for you to use within the franchise period' ?
Apparently no wires on TP North "until 2021" (ie a 3-year delay).
It begins to look as though some significant infrastructure work is going to be necessary on the route to get the promised 6tph capacity.
On the NW scheme (which also has problems), the assumption is that TPE/Northern will have to make do with cascaded EMUs when more wires go up.
Unless there's a formula including 387s, that means 319s.
I'm paraphrasing the MR item, but they are usually close to the mark.
To me it suggests management contracts until the infrastructure and rolling stock issues are sorted.
On the TP North issue, ORR has put out some hints in its rejection today of the GNWR application to run between Manchester and Leeds.
It says this about the 6th path (whoever operates it):
94. Network Rail said that early high level analysis indicated that reduced signalling headways would be required as a minimum to mitigate the performance impact of a further fast train on the Trans Pennine route.
We note this work could be included in an expanded electrification project, adding to the uncertainty around the scope, timing and costs of the project.
That suggests they are looking for a more comprehensive TP electrification project on a new timescale, rather than simply being "late" with the current one.