Legolash2o
Member
- Joined
- 27 Sep 2018
- Messages
- 687
Northallerton currently has three/four level crossings which causes a lot of traffic issues.
What your solutions be in regards to the slow lines and the level crossings?
One thought I've had is to convert the slow lines into cuttings so that the railway goes under the roads where the crossings are. No idea how feasible that is though and would of course require lifting the current track in order to dig them out!
What your solutions be in regards to the slow lines and the level crossings?
One thought I've had is to convert the slow lines into cuttings so that the railway goes under the roads where the crossings are. No idea how feasible that is though and would of course require lifting the current track in order to dig them out!
