Member
Joined
23 Oct 2007
Messages
61
No chance... Up until middle of last year I worked for GC, and until November 2007 I lived at leeming and went past there an awful lot!!
The refuge building leaves no room for anything, as it is quite near to the boundary of the low level avoider, and up against the foot of the main line embankment.
Wensley will be able to give more details.

There used to be a line round the back of the current Platform 2, the bridge shows evidence of this...

I didn't realise that you left GC, what happened, and who do you work for now?
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
Just a thought, but should we be publically "outing" the building in Northallerton that is in the way of some of the proposed alignments? Is it widely known for what it is?

The only time in my life that I had the sobering experience of visiting such a place, the location was under great secrecy, because they didn't publically advertise their address (for understandable reasons!).
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,558
Location
Torbay
Just a thought, but should we be publically "outing" the building in Northallerton that is in the way of some of the proposed alignments?

I agree entirely with your sentiment. I have removed identifying references from posts I can edit.
 

wensley

Established Member
Joined
29 Jun 2008
Messages
2,045
Location
On a train...somewhere!
I agree entirely with your sentiment. I have removed identifying references from posts I can edit.

It's one of the worst-kept 'secrets' locally so I wouldn't worry too much!!! I've only just found this thread by chance, hope I can add a bit of local knowledge to the situation.

MarkyT, I looked at a similar idea as part of a dissertation-style piece I wrote on the issue, although I simply looked at adding an 'up' platform to ease some congestion between Northallerton High Jn and the slow lines. NR would never fund something like this as it would involve huge earthworks and the new bridge (already mentioned) over Boroughbridge Road, and the diversion of a farm access track, which would in turn encroach on NYCC's headquarters!

The down chord you suggest simply wouldn't fit, there's no room there are all now the site has been built on and it fills the plot of land entirely.

The idea of Wensleydale joining into a low level station adjacent to the old dairy site is not something I look at, but this would certainly work as it utilises parts of the old trackbed as well as avoiding the need to work around the ECML, its OLE etc etc.

As part of my project I modelled the situation, I only had accurate date for passenger trains at this point (I now have freight data and may develop another, more accurate scenario using this) and the impact would be minimal. It would remove the conflicts at Northallerton High Jn, but new paths would be minimal, as the line is already only double track to Darlington. I'm not sure how valid my methodology is but you might get an extra couple of paths in each direction per hour (largely guesswork!).

But surely, to reduce delays caused by conflicts at the junction this idea would have some milage?!
 