Am I right in thinking that if approval for the railborne removal of the waste was granted, not only would the retention of the colliery headgear would be insisted upon, but a mining musuem with associated projects also be written into the contract.
The Colliery headgear will be retained & other projects, The local National Union Of Mineworkers have seen to this as a record of mining in the area.
The agent said this was a far better tribute, than the tip, which the NUM agreed should go. The headgear at Bersham & projects will compliment the two mining statues
in Wrexham town Centre.
http://www.wrexham.gov.uk/english/heritage/bersham_colliery.htm
Bob
--- old post above --- --- new post below ---
Something aint right about this Bersham project. I have got my ears to the ground and will post as soon as. On the re-double I'm hearing its a 5 mile loop that's been approved but I aint seen no hard evidence as yet.
The dynamic loop was part of the study, which would leave Rossett to Gresford Bank single. No way round the single overbridge on the busy Wrexham Expressway. As reported in this weeks Nth Wales Rail news, a 158 was stopped on the single track for 55 minutes near Wrexham, causing the usual chaos of back up lateness in both directions.
Bob
--- old post above --- --- new post below ---
To Cardiff on Gerald today, from F(f)lint.
Better loaded than usual, maybe 75% full throughout, but First Class complement through the Marches only 3.
Arrived early, 5 minutes later the set was going through the Canton washer.
Much mirth at the start.
Booked to Ninian Park.
Clerk had never heard of it, had to spell it out.
One in the eye for the Bluebirds.
Much signal cabling going on between Dorrington-Woofferton, new cabinets, troughing etc.
Are they resignalling, or just felling the semaphores, or something else?
I know the signalling is coming to the end of its life, but it would be a shame to lose all those old Joint Line square signal cabins - I think there are 5 left.
I hope at least one has a preservation order on it.
Nothing much to see of the new modular signalling system between Crewe-Shrewsbury.
Lots of metal frames with natty blue railings, but only a couple of new lights on sticks, near Whitchurch, with bags over them.
There was a big new concrete base south of Pontrilas which I take to be where the fabled extra Intermediate Block Signal is going in.
And who thought of wrapping all the semaphores round Shrewsbury with massive cylindrical metal safety cages?
I know it's only aesthetics but they look awful compared to the historic clean lines of a semaphore.
Many of them are coming down this year anyway. Seems a huge waste of money.
I'm not aware of any of this happening in other semapahore areas.
Thanks for the info on numbers , loco haul is the best way,always was. always will be in my opinion.
--- old post above --- --- new post below ---
Interesting statement on Cardiff Airport by First Minister, I take Jones Bangors theory,why WAGAIR(same funding stable as WAG EXs) is kept flying to it. Time the rail service to Rhoose airport was sorted.
Carwyn Jones says Cardiff airport owners need to run it 'properly' or sell up
http://www.bbc.co.uk/news/uk-wales-17365581
Peter Phillips, chairman of Wales Air Network and a former head of marketing and communications at Cardiff Airport, said passenger numbers had fallen by close to 50% over four years.
"These days, the airport can be compared not to a capital city airport like Edinburgh or Belfast, but more like a regional airport like Newquay or Bournemouth. That's very sad," he said.