Except the Oxted DMU's have to keep time (especially Acceleration) with EMU's on the highly overcrowded lines between East Croydon and London Bridge.
Still not convinced that it is viable to electrify the lines but some great ideas being put forward.
I like your thinking...
The way they currently seem to do this is by hanging around in P5 at East Croydon for ages nb (as well as at Oxted in both directions although to a lesser extent) before chasing an EMU from P1 to Windmill Bridge Jns and following it up. In the morning peak, it's always amusing to play "guess which service we'll follow up to LBG* today" on Uckfield trains, which of course abide by their own individual set of rules.
[*London Bridge, for the benefit of people north of the Thames...

I always forget good etiquette in this respect, my apologies]
On down services it is less noticeable, but then LBG>ECR starts off with gradual acceleration and doesn't seem to require much more.
A useful window for Uckfield electrification has just about been missed now, with the Thameslink Programme coming to LBG soon it would have been useful to turn the Uckfields into services which joined elsewhere. Instead we're now either going to lose direct London trains (unlikely I hope, Southern worked hard for the amazing growth we've seen and continue to see) or have trains of amazing lengths like 4-car or 6-car using up critical paths into London Bridge, immediately after the East Grinstead Line has been upgraded to 12-car capability. And of course, post-Thameslink we could have had something outland-ish like through trains to Peterborough or Cambridge! Now we are faced with medium term but significant overcrowding in the peaks, as it isn't really clear where extra carriages will come from.
It's really, really annoying watching a window like that close. Which brings me back to a post made earlier, about waiting for Wokingham resignalling before electrifying the North Downs Line. Yes, it would be lovely to defer everything to link up as smoothly as possible, but it seems to me that if you don't do something first, people are just going to frown, see no potential and move on. The North Downs almost certainly has lots of potential in some form, but unless something happens first, it will be overlooked as too difficult. I wish they would just run it in such a way as someone would just electrify the goddam lines, and then watch as other projects sprung up from the ether to find the success.
As others have mentioned, if you travel at certain times there always seem to be airport passengers, and on weekends, lots of people seem to use the line to access the towns it links up, as well as the North Downs themselves. I remain hopeful there is potential there.
Although of course, re-reading that it sounds slightly mad, too optimistic and of course bears no relation to the way that you would run a railway. It's not my however many million to spend. :roll: Ah well.