There's a bridge under the A361 just before the roundabout. Its looks like it has been built long enough to accept a track on the old alignment at a narrow angle of intersection. There's a local road, branching from Station Rd to Sticklepath Hill, the truncated road that used to cross the line on a bridge before the new high level road, that would need removing to make way. There's no similar bridge under the A3125. The coast path curves north before reaching the road so that suggests no underbridge of any size. The local road mentioned earlier might be used for diversions while a new bridge was constructed under the A3125.Isn't there that huge bridge/ embankment almost at the end of the platform, cutting off the Bideford line from Barnstaple, which would need tunnelling or rerouting ( at great expense I guess) before you could start relaying ?

Here's a view of the bridge from the station car park, with obligatory gull in flight. I think the road link under the high level carriageway will have to remain in some form, perhaps with a level crossing over the reinstated track. The link avoids pedestrian and cycle use of the fast and busy highway and roundabout above.

Last edited: