No trains Crowborough - Uckfield until Tuesday 12th August

Status
Not open for further replies.

williamn

Established Member
Joined
22 May 2008
Messages
1,695
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Chrisgr31

Established Member
Joined
2 Aug 2011
Messages
1,704
There has been an intermittent issue with the signals between Crowborough and Uckfield for some time. The latest issues occurred on Thursday around lunchtime and there was no service south of Crowborough for the rest of the day. On Friday the day started with a full service however again around lunchtime the issues between Crowborough and Uckfield led to a line closure and the decision to close until Tuesday.

Publicly Network Rail are saying the cable is 19 miles lone and there is a fault somewhere and they need specialist diagnostic kit.

== Doublepost prevention - post automatically merged: ==

Having shut at Friday lunchtime the line between Crowborough and Uckfield remains shut

“The signal fault between Crowborough and Uckfield persists after overnight works could not fix the fault.”

is what Southern say on X. Failing to mention the line closed on Friday and it’s now Tuesday.
 
Last edited:

4COR

Member
Joined
30 Jan 2019
Messages
890
Location
W Oxon (UWL exile)
Is it not possible to implement One Train Working on the section between Greenhurst Jnc (or indeed between Crowborough) and Uckfield, as it's single line, or does the fault/location preclude that?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,629
Location
Northampton
Is it not possible to implement One Train Working on the section between Greenhurst Jnc (or indeed between Crowborough) and Uckfield, as it's single line, or does the fault/location preclude that?
It looks from OpenTrainTimes that they're working London Bridge-Crowborough using the down platform at Crowborough (which has a wrong-direction departure signal).
 

Chrisgr31

Established Member
Joined
2 Aug 2011
Messages
1,704
It looks from OpenTrainTimes that they're working London Bridge-Crowborough using the down platform at Crowborough (which has a wrong-direction departure signal).
i haven’t been on the train this week but Thursday and Friday the train I was on that was terminating at Crowborough came in to the up platform.

A train has been spotted at Uckfield this afternoon so maybe they are testing something. The timetable still says they are all cancelled
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,591
Location
Neilston, East Renfrewshire
Is it not possible to implement One Train Working on the section between Greenhurst Jnc (or indeed between Crowborough) and Uckfield, as it's single line, or does the fault/location preclude that?

It might be possible, (with Pilotman Working?) but the delays liable to be incurred would cause havoc, especially when Up trains join the Brighton Main Line!
 

muz379

Established Member
Joined
23 Jan 2014
Messages
2,515
It might be possible, (with Pilotman Working?) but the delays liable to be incurred would cause havoc, especially when Up trains join the Brighton Main Line!
That assumed a spare person to be able to act as pilot .

And of course also causes issues with siganller workload and possibly hinders any fault finding if staff doing that require line blocks to carry out that work .
 