miklcct
Established Member
I have trouble producing itineraries between Cricklewood and Loughborough on 11 December. Checking the timetable I see there are no Thameslink trains for most of the day between London St Pancras and Bedford, while the EMR has STP (short term planning) its whole timetable to include the following:
* London St Pancras - Wellingborough: 1 tph, calling at the usual stations
* London St Pancras - Nottingham: diverted via Corby (reversing at Leicester) with pick up only northbound / set down only southbound at Luton Airport Parkway, Luton and Bedford
* London St Pancras - Sheffield: diverted via Corby (reversing at Leicester), first stop Wellingborough
Both Thameslink and EMR website don't show any engineering work planned on that day on the line. However, the EMR timetable suggest that the line between Kettering and Leicester is closed.
What happens on that day? Why are there no trains?
* London St Pancras - Wellingborough: 1 tph, calling at the usual stations
* London St Pancras - Nottingham: diverted via Corby (reversing at Leicester) with pick up only northbound / set down only southbound at Luton Airport Parkway, Luton and Bedford
* London St Pancras - Sheffield: diverted via Corby (reversing at Leicester), first stop Wellingborough
Both Thameslink and EMR website don't show any engineering work planned on that day on the line. However, the EMR timetable suggest that the line between Kettering and Leicester is closed.
What happens on that day? Why are there no trains?