Last Friday I caught a Trans-Pennine train from Penrith to Manchester on which, we were warned, there was no functioning toilet. They were planning to stop for a toilet call at Preston but in the event they were running a few minutes late so simply told any desperate passengers to alight at Preston for the toilet and catch the train from Blackpool which was by then only a few minutes behind.
The following day (Saturday 15th October) I was waiting at Chesterfield when the southbound 15:07 was likewise reported as operating without a functional toilet - fortunately this wasn't my train, as it was going all the way to PENZANCE!!
I wonder just how many station toilet calls this train made, and how much "delay repay" and bladder suffering was incurred simply by people not being able to go to the loo. Then I surmised that this never used to happen on long-distance trains in the good old BR days, when you got, say, a Peak pulling a rake of Mark 1 coaches which would have possibly a single malfunctioning toilet, if any, but there would always be an operational one in the next carriage.
Is this getting worse and worse due to short-formed modern units, the design of modern sanitary systems on trains, or a willingness to send out units unfit for service rather than incur the costs of cancellation?
The following day (Saturday 15th October) I was waiting at Chesterfield when the southbound 15:07 was likewise reported as operating without a functional toilet - fortunately this wasn't my train, as it was going all the way to PENZANCE!!
I wonder just how many station toilet calls this train made, and how much "delay repay" and bladder suffering was incurred simply by people not being able to go to the loo. Then I surmised that this never used to happen on long-distance trains in the good old BR days, when you got, say, a Peak pulling a rake of Mark 1 coaches which would have possibly a single malfunctioning toilet, if any, but there would always be an operational one in the next carriage.
Is this getting worse and worse due to short-formed modern units, the design of modern sanitary systems on trains, or a willingness to send out units unfit for service rather than incur the costs of cancellation?
