• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Night Riviera 43s?

Status
Not open for further replies.

m79900

Member
Joined
28 May 2023
Messages
703
Location
North Derbyshire
If the buffing gear was removed from the stock, could the sleeper be class 43 hauled? They'd only need 4 which GW have on their books anyway. It'd also save the complicated shunting movements at either end and at lower speed running could be more fuel efficient than double 57s. I'm sure there's reasons this can't take place, so feel free to pick holes in my argument!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
If the buffing gear was removed from the stock, could the sleeper be class 43 hauled? They'd only need 4 which GW have on their books anyway. It'd also save the complicated shunting movements at either end and at lower speed running could be more fuel efficient than double 57s. I'm sure there's reasons this can't take place, so feel free to pick holes in my argument!

They could haul it, but the passengers would be rather cold and in the dark…
 

Towers

Established Member
Joined
30 Aug 2021
Messages
2,983
Location
UK
Okay, fair enough. So are the electrical systems different?
They are indeed! Loco hauled MK3 stock is, and always has been, famously incompatible with the three phase train supply provided by class 43s. HST trailers, whilst being fundamentally the same as standard MK3 coaches, have a completely different electrical system.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,158
Location
"Marston Vale mafia"
It would make less sense now we're on 80x but I did long wonder why they didn't create a couple of sleeper HSTs. You would need a motor-alternator set to convert the power but one could be installed in the van area of one or both power cars.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,258
Location
Oxford
Put an ETS generator into some DVTs (no doubt much easier said than done) and simplify operations at the same time.
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,839
IIRC, the ecs off the up sleeper was hauled from Paddington to Old Oak Common by a pair of back-to-back power cars on at least one occasion.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,505
Location
Northampton
It'd also save the complicated shunting movements at either end and at lower speed running could be more fuel efficient than double 57s.
Are the shunt moves that complicated? AIUI the set works with Class 57s on either end from Reading to London Empty, and then drops off the rear 57 at Reading on it's way back through as 1C50. not sure what the norm is at Penzance - does it propel onto Long Rock or does the 08 come out and grab it?
In the other direction, 1A50 stops at Reading to attach the 57 on the rear and then the empty is hauled back from Paddington to Reading Top/Tail. So there's no shunting at Paddington, minimal shunting at Penzance, and 2 moves at Reading from the Train to the depot and back. The second 57 might even be shut down or reduced to just idling when attached to the rear of the train.

I am slightly surprised that the 'extra' 57 hasn't been replaced by a 90 or similar but I guess keeping 1 or 2 isolated on the GW isn't a great use of resources, as you'd need to get a 66 to trip them across to Wembley Yard if they were needed elsewhere on the electrified network.
 

Backroom_boy

Member
Joined
28 Dec 2019
Messages
583
Location
London
I was on a train about 4 years ago where a 57 was dead hauled at the back for what felt like the entire journey; every brake application seemed to have the engine crash into the coaches and wake me up.

Then on the return journey the train was cancelled short at Reading as there wasn't another 57 ready to attach on the back for the last leg into London.

I definitely would have liked a double ended unit train on that trip!
 

irish_rail

On Moderation
Joined
30 Oct 2013
Messages
4,513
Location
Plymouth
I was on a train about 4 years ago where a 57 was dead hauled at the back for what felt like the entire journey; every brake application seemed to have the engine crash into the coaches and wake me up.

Then on the return journey the train was cancelled short at Reading as there wasn't another 57 ready to attach on the back for the last leg into London.

I definitely would have liked a double ended unit train on that trip!
It's a bugger to drive when there is 130 dead tonnes of weight coupled at the back, I for one hate it when there's a dead loco on the back.
 

Towers

Established Member
Joined
30 Aug 2021
Messages
2,983
Location
UK
It's a bugger to drive when there is 130 dead tonnes of weight coupled at the back, I for one hate it when there's a dead loco on the back.
Tell us you’re a Proper Driver without telling us you’re a Proper Driver :D
 

popeter45

Established Member
Joined
7 Dec 2019
Messages
1,483
Location
london
It would make less sense now we're on 80x but I did long wonder why they didn't create a couple of sleeper HSTs. You would need a motor-alternator set to convert the power but one could be installed in the van area of one or both power cars.
if dedicated HST stock an alternator set would not have been needed i assume, would have even made sence for the van area to be used for larger luggage
could be the case that as many sleeper trains still used mark 2's for non sleeping portions (as seen even on the cally pre mark 5's) the idea was for just drop in replacing the mark 1 sleepers rather than replace the entire train
also droping coaches at some stops like plymouth and exeter would have been a struggle if you have to remove a rear power car multiple times a night for this
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,766
It would make less sense now we're on 80x but I did long wonder why they didn't create a couple of sleeper HSTs. You would need a motor-alternator set to convert the power but one could be installed in the van area of one or both power cars.
Motor-alternator? You're wanting to make it DC, not the other way round! By the time there were power cars available for this you'd have used power converters.

In any case, it would be deeply bonkers to take a 415V three phase supply, turn it into DC only to then feed it through an MA set to turn it back into 415V three phase, purely because of the train supply cabling when you have to fit through control cabling anyway.

The time to have done this would have been around the time the Scottish sleepers were moving over to Mark 5s. That way there would have been a float of Mark 3 sleepers to go for conversion (remove MA sets and make them 415V three phase, fit 36-way MU cables) and refurbishment, with the day coaches of the sleeper being replaced by HST trailers.
 
Status
Not open for further replies.

Top