Since I last visited, the signals at Newport (Gwent) have been changed to LED type. The first thing I noticed was freight on the up/down relief lines seem to pass a good bit quicker than before. Has the station had a new raised speed restriction?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
It was quite extensively remodelled trackwise at the west end a couple of years ago. I assume this is when speed improvements etc were carried out. The Maindee Curve, however, was singled this year.
 

a good off

Member
Joined
2 Jul 2010
Messages
372
Location
Control Room
There were long term speed restrictions on the relief lines at Maindee through the old point work. The points have now been removed with the recent resignalling/remodelling of the Maindee area and the line speed restored.
 