I was wondering what is the newest line in operation, when I say new I mean entirely new not a reopened one, the newest one I could think is the realignment north of Stoke-on-Trent in 1967 but i'm sure there is newer ones than that.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Buttsy

Established Member
Joined
20 May 2011
Messages
1,374
Location
Hanborough
How about the Selby minefiled cut-off on the ECML that was opened in the early 80s?
 

themiller

Established Member
Joined
4 Dec 2011
Messages
1,380
Location
Cumbria, UK
I was wondering what is the newest line in operation, when I say new I mean entirely new not a reopened one, the newest one I could think is the realignment north of Stoke-on-Trent in 1967 but i'm sure there is newer ones than that.

Forgive me if I'm wrong but HS1 could be in the top few!
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
There's also been the realignment near Wallyford on the ECML due to land condition, I forget when but something in me screams 2003.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Of course Surrey Quays–Peckham will open next month and take the title.

Then, in no particular order, we have the Bicester chord, the Ordsall chord, the Almond chord, the Ipswich chord, the Nuneaton North chord, the Hitchin flyover, the North Doncaster chord, and Crossrail. (Not sure if the Canal tunnels are actually completely new, as I know there used to be services from the GN line to Moorgate via Farringdon.)
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,656
Nuneaton North Chord probably wins it, that opened a week or so back according to the appendix.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,249
Of course Surrey Quays–Peckham will open next month and take the title.

Then, in no particular order, we have the Bicester chord, the Ordsall chord, the Almond chord, the Ipswich chord, the Nuneaton North chord, the Hitchin flyover, the North Doncaster chord, and Crossrail. (Not sure if the Canal tunnels are actually completely new, as I know there used to be services from the GN line to Moorgate via Farringdon.)

No it won't - The gap with new track between Surrey Quays and Queens Road Peckham is relaying track on old alignment

see:
http://en.wikipedia.orgwiki/File:Bricklayers_Arms_&_New_Cross,_Midhurst_RJD_91.jpg
 
Last edited:

philjo

Established Member
Joined
9 Jun 2009
Messages
3,015
(Not sure if the Canal tunnels are actually completely new, as I know there used to be services from the GN line to Moorgate via Farringdon.)

The Canal tunnels are new as the old connection was on a different alignment.
Those trains used the tunnels at Kings Cross. the up platform at KX York Road station was somewhere where the end of platforms 0/1 in the main station is now.
The down platform was outside the current suburban platform 11, and the tunnel run under the GN Hotel. I think that tunnel now has electric cables in it that were rerouted when the new underground ticket hall was built.
If traveling slowly you can see where they come out into the Thameslink core near the now disused Kings Cross Thameslink platforms

http://www.disused-stations.org.uk/k/kings_cross_york_road/index.shtml
 
Last edited:

oversteer

Member
Joined
26 Jan 2011
Messages
742
Does the down line at South Ruislip count? That new alignment opened last August
 

chris89

Established Member
Joined
21 Dec 2009
Messages
1,371
Location
Somewhere
Not technically a new line but rebuilt.

The Airdrie - Bathgate line that fully opened in December 2010, With Armadale, Caldercruix and Drumgelloch opening at a slightly later date.

Chris
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,165
Do short re-alignments count? If so, there would be a lot; Canal Tunnels (St. Pancras-Finsbury Park), Hitchin Flyover or one of the many new chords would be in contention, as have been mentioned.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,656
I refer the honorable posters to my post of 12.45 today, Nuneaton North Chord wins it I think, being open for 18 days.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,682
The most recent track on brand new alignment is the Nuneaton North Chord.

The most recent track to be opened is, also, the Nuneaton North Chord.

Next up is Hitchin flyover. Probably.
 

Kneedown

Established Member
Joined
29 Dec 2007
Messages
1,837
Location
Nottinghamshire
May well be a new bit on the Robin Hood line between Creswell and Whitwell if Lafarge get the go ahead to excavate the dolomite (not the Triumph type) out of Whitwell tunnel.
 