I found this when looking into Alstom's BEMU offering. Another Adessia Stream B BEMU.
Alstom, global leader in smart sustainable mobility solutions, has been awarded a €538m[1] (NZD$1,065m) contract by the Greater Wellington Regional Council for the design, manufacture and supply of 18 Adessia Stream B battery-electric multiple unit (BEMU) 5-car trains and 35-years of FlexCare Perform fleet maintenance. They will be the first BEMU commuter trains operating in New Zealand. The trains will enable emission free operations on non-electrified segments of the Wellington rail network, on the Wairarapa and Manawatu lines.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,197
My understanding is that the Wellington units are to be based on the upcoming DART 90000 Class. However the cab front seen in these renders has an appearance more akin to the SWR Class 701.
 

HamBuoy

Member
Joined
8 Sep 2017
Messages
48
My understanding is that the Wellington units are to be based on the upcoming DART 90000 Class. However the cab front seen in these renders has an appearance more akin to the SWR Class 701.
Yes similar in appearance to the Class 701 but with an evacuation door.

NZ liveries 2 copy.jpg
This video gives an overview of the train and facilities.

Do we know what other manufacturers bid for this order?
 
Last edited:

Richard Scott

Established Member
Associate Staff
International Transport
Railtours & Preservation
Joined
13 Dec 2018
Messages
4,584
When are these units expected to enter service?
 

stadler

Established Member
Joined
5 Jun 2023
Messages
3,304
Location
Horsley
So if i have understood it correctly these trains will take over the locomotive hauled trains on both the Wairapa Connection (Wellington to Masterton) on the Wairapa line and on the Capital Connection (Wellington to Palmerston North) on the Manawatu line. Currently only the Masterton service is operated by Metlink with the Palmerston North service operated by Kiwi Rail instead. So does this mean that Metlink will take over operation of the Capital Connection to Palmerston North once these trains enter service? Or are they splitting the units between the two operators?
 