HarleyDavidson
Established Member
- Joined
- 23 Aug 2014
- Messages
- 2,544
Surely the 442s are old enough to have oil based heating and lighting?
You are taking the proverbial aren't you?
Surely the 442s are old enough to have oil based heating and lighting?
Most definitely![]()
See what I mean gaz!
Brighton had an active traincrew depot until 2006. The brighton services were axed after Arriva took over the franchise and the map was redrawn to add stanstead-cardiff and removed the West coast work to a mix of virgin and TPE. Pompeii line services and Poole were axed upon introduction of operation flickup, err... Princess! Along with the Ramsgate and weymouth summer saturday trains. When the timetable couldnt be sustained thats when Liverpool was axed along with BPN-BHI workings and the HST's were handed over to Midland Mainline for project rio. Solihull a
So lost its station stop. It was also around this time BMH and west country-WCML scotland services were split at MAN in order to build robustness in the schedules. Ironically reliability improved meaning the terminator on 5-6 often got in with time to spare before the scottish service departed 14. Its this bit that TPE now run.
1O31 19:46ish LIV-GTW was never on time and was rarely less than an hour late bu the time it reached BHM (scheduled 21:33 departure) when the Reading based crew would take over with Brighton taking over at Reading for the stint to Gatwick often departing after midnight. The brighton crew passed from brighton to reading and waited for the back working on that late diagram. This service was eventually axed when Liverpool was given up leaving 1V96 16:04 GLC-PAD (d BHM 21:03) as the last thames valley service. Paddington was also subsequently axed as a destination but remained a traincrew boarding point for a couple of services (1M07 07:03 PAD-MAN still ran ecs from PAD to form 07:33 @RDG which required the train crew to book on at 04:30 for an all stations thames/FGW link turbo to PAD. That was a eye watering shift! 09:03 PAD-MAN reversed in PAD but traincrew boarded at RDG to form 1M11 @09:33. This was a HST, but utilised a west coast 8 car set on a Saturday but still stopped at Solihull until the HSTs were withdrawn hen it switched to a 4 car voyager)
I think 442s working push-pull from Oxted to Uckfield makes sense - nice use for a 68. Then Uckfield passengers could go back to having a through Victoria service !. I am sure the 171s could EASILY find use elsewhere thus adding to the attractiveness of the 442 option.
[/end brainstorm][wake-up].
Given the relative success of 33s on dragging London - Bournemouth EMUs from Bournemouth to Weymouth and back (before the EMU headed back to London on its own power), I'm not sure why I'd not noticed more people suggest it for Uckfield (i.e. something like a 377 runs from central London to Oxted/ Hurst Green as an EMU then gets dragged to Uckfield by a loco...
...
As 61653 HTFAC has commented, such use of 442s was referenced in the ITT documents, so it can't be a surprise that bidders are taking on board this 'suggestion' by the DfT.
As you would imagine, I'm not prepared to say on a public forum as to where the comments have come from, but let's just say its not platform end wibble. Might turn out to be wibble, we'll know in December...
I'm not convinced either of those stations are as important as providing a proper InterCity level of capacity and quality. I think there is suppressed demand, put off by severe overcrowding and the use of regional EMUs, however nice a regional EMU there may be.
OK fair do's. Did the document specifically refer to class 442's or just rolling stock in general?
page93 of the ITT said:https://www.gov.uk/government/uploa...ranspennine-express-invitation-to-tender.pdf]
5.4.2.24 Only the following rolling stock may be proposed by Bidders for inclusion within the TPE Train Fleet:
i. The class 185 and class 350 multiple units that are currently comprised within the TPE Train Fleet (subject to the requirement to sub-lease Class 185 units to the Northern Franchise for an initial period until December 2017);
ii. Diesel multiple units that are not Class 14x, Class 15x or Class 17x and that are currently leased by a relevant operator other than the current TPE and Northern franchisees, but that will be demonstrably surplus to the requirements of that operator, either because new rolling stock is being procured to replace it, or because it is diesel stock that will be displaced by committed electrification schemes, or because other rolling stock is due to be cascaded in to replace it;
iii. Up to four 2-car diesel multiple units of similar characteristics to TPE’s Class 170 units must be assumed for bid purposes to be leased until December 2017, as a proxy for the arrangements that the Department envisages will be put in place with the incumbent operator to mitigate the transfer of these units to the Chiltern Franchise with effect from February 2016;
iv. Vehicles of Class 442 following their release from the TSGN franchise
v. Any new-build rolling stock that the Bidder commits to procure.
As you would imagine, I'm not prepared to say on a public forum as to where the comments have come from, but let's just say its not platform end wibble. Might turn out to be wibble, we'll know in December...
I still think that if the cabs within the class 442's can be converted to work with class 67 or class 68, that it would better than the loco having to work around the class 442, that way all the driver needs to do is just change the end of the train he is using.
More than that, why can't we aspire to at least 110mph stock for this route?
Surely the 442s are old enough to have oil based heating and lighting?
Interestingly I have just spotted the ITT includes 2tph york - newcastle with one extended to Edinburgh......
Surely the 442s are old enough to have oil based heating and lighting?
Maybe the cheapest deployment would be to park them down the Stourbridge Town branch, all the way from the Town station to the Junction station.
56 coaches (that's 11 5-car set with one extra car all coupled up), would provide a weatherproof walkway between the two stations. If a 750VDC supply could be provided for the 'hotel services', there would be heating/cooling, lighting, seats, toilets and even some of the buffets could be re-instated.
At night, some of the coaches could be let out for entertainment, parties etc..
It wouldn't even be necessary to remove the old traction kit.
Maybe the cheapest deployment would be to park them down the Stourbridge Town branch, all the way from the Town station to the Junction station.
56 coaches (that's 11 5-car set with one extra car all coupled up), would provide a weatherproof walkway between the two stations. If a 750VDC supply could be provided for the 'hotel services', there would be heating/cooling, lighting, seats, toilets and even some of the buffets could be re-instated.
At night, some of the coaches could be let out for entertainment, parties etc..
It wouldn't even be necessary to remove the old traction kit.
Having spent a couple of hours stuck on one in a cold tunnel without power that would have been appreciated!