• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

New Trains for Central not Bakerloo Line

Status
Not open for further replies.

AndrewP

Member
Joined
5 Sep 2011
Messages
495
the Bakerloo's 72 stock is worn out and the Central Line's 92 stock seems to be unreliable or taking forever to refurb - why not use refurbed 92 stock on the Bakerloo and bite the bullet and order / lease new stock for the Central?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

SynthD

Established Member
Joined
4 Apr 2020
Messages
2,020
Location
UK
Despite the slow speed of the refurb, it might be complete by the earliest point new trains could come in.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,433
Location
Taunton or Kent
Would the 92 stock be gauge cleared for the Bakerloo line? (if there are variations in vehicle size and behaviour between different deep-level lines)
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,360
Location
Hertfordshire / Teesdale
the Bakerloo's 72 stock is worn out and the Central Line's 92 stock seems to be unreliable or taking forever to refurb - why not use refurbed 92 stock on the Bakerloo and bite the bullet and order / lease new stock for the Central?

Not sure how easy it would be to achieve compatibility with the 1990s Central Line signalling system. If this would be a difficult and potentially expensive piece of work then it would kill any business case.

Fleet replacement on the Central Line is going to be a headache when the time comes as it will likely have to be coincided with resignalling. The nearest we’ve come to that in recent years has been the Victoria Line, but having to interface to a 1990s system may well be more challenging than a 1960s one.

Getting 92 stock to work in a 7-car formation might also present some challenges.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,842
Is it worth messing about moving stock from line to line when these trains will eventually be replaced by the 2024 stock? As I understand it the Bakerloo is supposed to be next after Piccadilly?
 
Status
Not open for further replies.

Top