This thread got very bogged down on airport access. I can't believe this issue forms more than 1% of transport needs in the Leeds area.
Exactly.
This thread got very bogged down on airport access. I can't believe this issue forms more than 1% of transport needs in the Leeds area.
Reinstate the junction at Arthington and a turnback siding to meet the A658 at Pool-in-Wharfedale with a single platform station and large P&R car park there. Bus shuttle transfer to the airport from here via A658.
Reinstate the junction at Arthington and a turnback siding to meet the A658 at Pool-in-Wharfedale with a single platform station and large P&R car park there. Bus shuttle transfer to the airport from here via A658.
The Northern service won't serve Huddersfield which is a big pull from the intermediate stations between there and Batley- meaning that the 2 TPE services an hour will have to bear that load. One of those will also be Hull's only direct train towards Manchester and while some of those passengers may switch to faster services at Leeds if the timetable makes it worthwhile, many of them won't. Whilst platforms may be long enough for 6-car 185s TPE will only have 29 of the units so if by some miracle most of the services ARE that long, I'll eat my hat and yours too!
Potential peak hour capacity into Huddersfield rises from the current 4 cars per hour to 12 and into Leeds from 8 cars to 18, which is a very large rise. The DfT are unlikely to be funding platform extensions, for them not to be used at least at times of peak loading.
I like the idea. What do you do with trains when they get to Leeds?
Its a shame that part of the alignment towards Otley is built over. Had it not been that spur could have been extended to Otley itself, giving strength to any business case.
Ideally, bulldoze half the houses on the former station site at Pool (HS2 has set a precedence in house demolition), continue on former trackbed to Otley bypass, where a new bridge and formation is required, then follow the trackbed to a reinstated junction with the Ilkley-Menston line. This forms a looping line from Leeds to Leeds via Pool (for bus link to airport) Otley, Guiseley and Kirkstall Forge or Harrogate-Bradford direct via Pool (again bus link to airport), Otley, Guiseley, Baildon, Shipley with connection at Shipley out of Skipton-Bradford trains instead of travelling to/from Harrogate via Leeds.
Trains arriving at Leeds would continue to the proposed turnback at Micklefield, or continue to Selby and turnback there or a new spur from Cross Gates to the A64 along the former Wetherby line and turnback there to serve 12,000 homes already being built in East Leeds.
As much as I would love to see a loop in place, opening up options for Bradford to Otley & Harrogate, to have any chance of that to work both single track sections coming down from Guiseley would have to be re-doubled, not easy with the current infrastructure & OHLE. I suspect cost & demand (at least initially) might scupper that idea before it ever got close to getting off the ground.
How long did it take to open Kirkstall Forge and Apperley Bridge (at least 15 years from memory) and now look at the electrification fiasco? How many new stations have been opened under the Governments new stations grant since introduced? Zero.
I know. Everything to improve rail use and capacity is always an uphill struggle persuading the decision makers, who sadly can be very road biased/rail ignorant, to turn it into concrete and reality.
How long did it take to open Kirkstall Forge and Apperley Bridge (at least 15 years from memory) and now look at the electrification fiasco? How many new stations have been opened under the Governments new stations grant since introduced? Zero.
If the will was there Otley could have had a two mile rail link years ago. The trackbed from Menston is complete apart from a bridge over the old A660 and one over the A65. Instead the car park at Menston station cannot cope with daily commuters from Otley to Leeds and Bradford and overflows into residential streets. What is worse is that visitors cannot visit Otley by rail which affects the local economy. It is a well known fact that people do not like or trust change of mode such as train to bus on a journey so just do not make the journey or go by car if they have a car. The same is true of the cathedral city of Ripon. Visitors are happy to visit rail connected Harrogate but very few of those visitors continue to railless Ripon even though there is a connecting bus every 15 minutes between the peaks.
Three stations have been opened under round 1 of the New Stations Fund.
I think reconnecting Otley to the rail network would have a more positive effect than some of the parkway stations being mooted elsewhere in the Leeds area. Sadly the cost of reconnecting it and allowing enough services to operate it would be way beyond the budget available for Leeds' improvements, and as you say the will simply isn't there to make a strong case for it. I have family a friends in Otley and they often bemoan a good link with the rest of the county, let alone Leeds. If I had a pound for every time one of them posted "The X84 is late again".......|
Yes
Pye Corner opened on 14 December 2014. Cracked through 63k passengers last year.
Newcourt opened on 4th June 2015 with just shy of 60k passengers. Not bad for a railway station that opened two months in.
Lea Bridge opened 15 May 2016
Is that something Rail North or Transport for the North could take up? Obviously it would need a fair bit of local funding as it's probably not going to get justified on the basis of projected passenger flows alone, but the element of regenerating the local community and businesses might swing it under the right circumstances?
That said, before we get even further off topic, does anyone think that deserves its own thread, or was there not much more to be said about the three stations actually being built anyway?
One more thing - Deltic08 referred to the Micklefield turnback - but won't that be shelved now the park and ride station will be built at Thorpe Park? Can it be justified on its own without the associated park and ride proposal for Micklefield? It would still presumably require the station to be rebuilt on the edge of Micklefield?
Otley could be a "quick" fix if you could start today. However, you are looking at some serious work before a funding bid is submitted including a serious challenge that guided bus or a brand new D2 wouldnt do a better job. You havent detailed operational proposals (do the trains terminate at Menston, Bradford or Leeds) but i dont expect NR to approve a timetable plan that could rip apart the Triangle service if the Otley train loses more than 10 minutes.
So make that £10m. Add on electrification adjustments £2m plus electrification of the branch £?m, full replacement of those under bridges £4m each, two miles of track at a good £8m plus single platform station with at least a small car park at £5.5m (because people are going to be annoyed if you dont bother doing things like plugging in the national grid for the lights and adding access to it).
Someone with a Spons pricing guide might get it down a few million and probably advise that my costs include some serious optimism bias.
Personally, i agree with you. Linking Menston to Otley would be very helpful with dedicated infrastructure. However, it might not necessarily be rail if you want to achieve door to door journeys using public transport considering the location of an Otley station.
As much as I would love to see a loop in place, opening up options for Bradford to Otley & Harrogate, to have any chance of that to work both single track sections coming down from Guiseley would have to be re-doubled, not easy with the current infrastructure & OHLE. I suspect cost & demand (at least initially) might scupper that idea before it ever got close to getting off the ground.
Not many when you consider Ilkley, pop. 13,000, has an annual footfall of 1.3 million.
Can you give a figure for the cost of opening the two single line stations please?
As much as I would love to see a loop in place, opening up options for Bradford to Otley & Harrogate, to have any chance of that to work both single track sections coming down from Guiseley would have to be re-doubled, not easy with the current infrastructure & OHLE. I suspect cost & demand (at least initially) might scupper that idea before it ever got close to getting off the ground.
Personally, i agree with you. Linking Menston to Otley would be very helpful with dedicated infrastructure. However, it might not necessarily be rail if you want to achieve door to door journeys using public transport considering the location of an Otley station.
No need for any adjustment or addition to OLE. Another case for 319 bimode man running on diesel from Menston to/from Otley. By reinstating as far as the former station site at Pool from both east and west with two simple stations, both could be served by an airport bus and would be close enough to walk between in under two minutes through the development to provide through routes between Harrogate and Bradford in which case Otley-Leeds could be either via Horsforth of Menston with one change at Pool or Menston. Those who did not wish to walk between stations in Pool just use the airport shuttle bus as it would call at both on each circuit. It would all have to be timetabled for the best interchanging.
This is a recommendation between stations in Bradford so why not here.
All three sides of the Arthington triangle and the stub to Pool would be electrified concurrently with Leeds-Harrogate-York electrification at negligible additional cost to this electrification project.
Why do Otley residents use Menston station as a railhead when they could use bus now from Otley? Same old story, commuters prefer train to bus when there is a choice.
Why should an Otley/Pool train lose more time than any other train in the Wharfe and Aire corridors?
Finally, what is a D2?
What were you thinking? There's 6 buses an hour at the moment that seem to be fairly unpopular (though I use them from time to time). Annoyingly they use different stops at Menston rail station and there's a 3bph service, a 2bph service and a 1bph from 3 different operators.
Ilkley has 4 trains per hour to and from major population centres on an electrified railway line. Stations take a good 3-5 years to establish. The Business case for Newcourt was looking 500 daily journeys.
Pye Corner has an hourly service. Newcourt has a half hourly service.
Pye Corner was £3.5m and Newcourt was a good £2.2m.
These are fairly basic affairs and costs are rocketing. Inverness Airport is pushing through £5m.
Yes, there will be adjustments. You have to look into the track alignment and accomodate any changes where the new line would leave the existing railway line.
How do you accomodate the road sitting on the old railway alignment?
A Menston turn back will take up track space on a busy line and any delay on the turnaround would cause issues that the line cannot accomodate.
A D2 is a two lane dual carriageway.
Without more experience of Otley, I could see a busway.
I agree, with this post, but your initial post said something very different.
.
How about the very poor marks for constructional and operational feasibility? If there isn't land available for a station, how big could a station car park be?